Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML18031A281 +
- ML18031A254 +
- ML18031A251 +
- ML18025A695 +
- ML18025A672 +
- ML17326A243 +
- ML17326A239 +
- ML17318A279 +
- ML17317B516 +
- ML18004B987 +
- ML17296A443 +
- ML18079B091 +
- ML18079A921 +
- ML18139A153 +
- ML19210B924 +
- ML19209C576 +
- ML19209C559 +
- ML19208D729 +
- ML19208D724 +
- ML19208D719 +
- ML19208D688 +
- ML19208D568 +
- ML19208D380 +
- ML19208D165 +
- ML19208B235 +
- ML19208A516 +
- ML19208A360 +
- ML19207C184 +
- ML19207C171 +
- ML19207C025 +
- ML19207C009 +
- ML19207C008 +
- ML19207B986 +
- ML19207B984 +
- ML19207B981 +
- ML19207B977 +
- ML19207B968 +
- ML19207B966 +
- ML19207B963 +
- ML19207B871 +
- ML19249C936 +
- ML19249B805 +
- ML19249B797 +
- 05000368/LER-1979-062-03, /03L-0:on 790804,failure of Full Length Control Element Assembly 39 to Move.Caused by Failed Control Element Assembly Enable Card.Card Replaced & Assembly Declared Operable within 1-h of Failure +
- ML19249B534 +
- 05000368/LER-1979-060-03, /03L-0:on 790802,failure of Reactor Drain Tank 2T68 Discharge Reactor Bldg Penetration to Close from Control Signal.Caused by Crystallization of Boron in Vent on Valve Operator Piston.Valve Cleaned & Returned to Svc +
- 05000271/LER-1979-018-03, /03L-0:on 790802,during Power Increase After Maint Power Reduction,Max Critical Power Rating Was Below Tech Spec Min.Caused by power-increasing Xenon Transient.Control Rods Inserted & Core Flow Increased for Continued Operat +
- ML19259D689 +
- ML19259D367 +
- ML19259D357 +