Submits Interim Deficiency Rept Re Potentially Reportable Defect in Concrete Surrounding Fuel Transfer Canal Sump Reported on 790731.Diagnostic Testing Delayed by Recent Order Halting Const.Sonic Testing to Be Performed Soon
ML19207C009
Person / Time
Site: Marble Hill
Issue date: 08/30/1979
From: Shields S
PSI ENERGY, INC. A/K/A PUBLIC SERVICE CO. OF INDIANA
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
NUDOCS 7909060309
Download: ML19207C009 (2)


Text

-

s PUBLIC SERVICE INDIANA August 30, 1979 S. W Shielcs VsC9 P'e$1 Cent - E!ectric System Mr. James G. Keppler, Director U.S. Nuclear Regulatory Commission Docket Nos.: STN 30-546 STN 50-547 Region III 799 Roosevelt Road Construction Permit Nos.:

Glen Ellyn, Illinois 60137 CPPR 170 CPPR 171 Marble Hill Nuclear Generating Station Units 1 & 2

Dear Mr. Keppler:

This is an interis report in accordance with 10CFR50.55(e)(3) concerning a potencially reportable defect in the concrete surrounding the fuel transfer canal su=p.

On July 31, 1979 Mr. C. E. Chmielewski notified your office by telephone that Public Service Cenpany of Indiana, Inc. (PSI) had determined through its Safety Review Cc=mittee that a potentially reportable condition existed involving the fuel transfer canal simp.

A constructicn worker reported that the concrete-backed liner did not sound as though the backing were solid; PSI was unable to determine in the ti=e allowed that no reportable condition existed and therefere telephcned your office.

At this ti=e, PSI still considers the condition to be only potentially re-portable. PSI plans to do additional diagnostic testing; this work has been delayed due to the i=plementatica of the recent confirnatory order halting construction. PSI will perform sonic testing on the areas in questien and will report the actual condition and, if appropriate, the o

m. ~...

a.i. )O L6 9Q

\\

7909060 3OI r

1C00 East ' tain Streat. P'amtea, indiana a6 68 317 339. 9611

- PUBuc !!r. Janes G. Keppler, Director August 30, 1979 SERVICE INDIANA repairs, the analysis of safety implication, and the corrective actions to be taken as soon as the test results are obtained.

Sincerely,

/

S. W. Shields JUB:jb cc: Director, Office of Inspection & Enforce =ent U. S. Nuclear Regulatory Cem=ission Washington, D. C. 20555 E. R. Schweibinz, P.E.