Executive Director TO:
Director of Regulatory Operation Chalrnan. SRC t:5NRC Regfon i Manager of Nuclear Operations 631 Park Avenue King of Prussia. Pennsylvania 19406 DATE/ TIME: 8/30/79 -
P.Pf-DATE/ TINE:
8/30/79 -
P.M.
FROM:
James A. F1tzPatrIek Hucbar Power Piant P.O. 'Jox 41 t.ycoming New Tork 13033 PROP 4PT REPORTABl.E OCCURRENCE
SUBJECT:
00CMET NO. 50-333 LICENSE NO. OPR-59 ASSIGNED OR NO.79-118 LER HO. /9-046 EVENT DATE:
August 30. 1979 REPORT DATE:
August 30, 1979 EVENT DESCRIPTION:
Tt approxir,ately 12:30 p.m. August 30, 1979 the nuclear steam supply system vendor and the architect-engineer informed the staf f at the FitzPatrick Plant that they concurred that the present routing of the high pressure coolant injection system steam isolation valve control cable and the themocouple temperature detector cabling for the high
.wssure conlant injection system was such that sufficient cable separation divi not
.:xist between these cables and the contrni cables of the automatic depressurization
-ystem.
This was discovered during the review nf cable separation for the Jarnes A.
Fitz atrick fire hazards analysis study.
Although not cicarly a design requirement for n
r.he FitzPatrick Plant during the des'gn phase, the present study indicates the separation acNeen these cables should be increased, k'e are therefore presently re-routing these cables to locations approved by the architect-engineer prior to startup of the FitzPatrick
'lant.
COMPONENTS INVOLVED ns{de IIPC{1 and 1HPIARC103 assnc lated with steam leak detection and Il KDAflX0 Cables it.KDARX02 steam isolation valve, valve 2J-NV 15 CAUSE ANo REMEDIAL ACTION:
Iause - Indeteminate awdf a l Action - Set forth above
~4 THERMAL PO*JER N/A
'ACIt.ITY STATUS:,
Routine Startup' Shutdown X
Routine Shutdown RefueIing Utner Steady State Power Not Appiicable Load thange
(, / n pQT
. /.)
i wri t ton follow-up report will be sent wi thin two weks.
<> a Q
r }
]&$.w
$AA g
O O
ao_
~
JcHN'D.4EONARD, JR.
/
305 "6.) MHAGER RESIDENT
(
n' r
g F t TZPATR r.K NUCLEAR Por PLAN' O
1