Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20207R476 + (00:44:05, 7 December 2024)
- ML20207R467 + (00:44:06, 7 December 2024)
- ML20207R469 + (00:44:06, 7 December 2024)
- ML20207R457 + (00:44:07, 7 December 2024)
- ML20207R456 + (00:44:23, 7 December 2024)
- ML20207R454 + (00:44:29, 7 December 2024)
- ML20207R452 + (00:44:30, 7 December 2024)
- 05000440/LER-1987-007, :on 870213,pressure Transient Occurred within Reactor Vessel Level Instrument Rack Resulting in Redundant Reactivity Control Sys (RRCS) Alternate Rod Insertion.Caused by Design Configurations of RRCS Instruments + (00:44:38, 7 December 2024)
- 05000395/LER-1987-001, :on 870216,shift Supervisor Observed That Pressurizer Relief Tank Had Been Vented to Shutdown Waste Gas Decay Tank Due to Valve Leakage in Tank.Cause Not Stated.Procedure Revs Initiated + (00:44:45, 7 December 2024)
- ML20207R442 + (00:44:46, 7 December 2024)
- ML20207R437 + (00:44:47, 7 December 2024)
- PY-CEI-NRR-0610, Monthly Operating Rept for Feb 1987 + (00:44:47, 7 December 2024)
- ML20207R429 + (00:44:48, 7 December 2024)
- IR 05000259/1987005 + (00:44:49, 7 December 2024)
- ML20207R420 + (00:44:49, 7 December 2024)
- ML20207R418 + (00:44:50, 7 December 2024)
- ML20207R410 + (00:45:02, 7 December 2024)
- ML20207R412 + (00:45:02, 7 December 2024)
- RBG-25462, Responds to NRC Re Violations Noted in Insp Rept 50-458/86-39 on 861208-12 & 870112-16.Corrective Actions: Temporary Change Notice Issued for Rev 6 to Surveillance Test Procedure STP-051-4234 + (00:45:03, 7 December 2024)
- ML20207R400 + (00:45:16, 7 December 2024)
- ML20207R398 + (00:45:17, 7 December 2024)
- TAC:59174 + (00:45:17, 7 December 2024)
- ML20207R396 + (00:45:24, 7 December 2024)
- ML20207R391 + (00:45:26, 7 December 2024)
- IR 05000335/1984023 + (00:45:28, 7 December 2024)
- ML20207R370 + (00:45:29, 7 December 2024)
- ML20207R363 + (00:45:30, 7 December 2024)
- ML20207R365 + (00:45:30, 7 December 2024)
- ML20207R361 + (00:45:31, 7 December 2024)
- ML20207R355 + (00:45:32, 7 December 2024)
- ML20207R359 + (00:45:32, 7 December 2024)
- ML20207R346 + (00:45:39, 7 December 2024)
- ML20207R342 + (00:45:40, 7 December 2024)
- 05000247/LER-1987-004, :on 870210,reactor Turbine Trip Occurred Due to Trip of Reactor Protection Train B.Caused by Personnel Error.Malfunctioning Breaker Cell Switch Subsequently Repaired + (00:45:46, 7 December 2024)
- ML20207R337 + (00:45:47, 7 December 2024)
- ML20207R334 + (00:45:48, 7 December 2024)
- TXX-6337, Suppls Response to Deviation Noted in Insp Repts 50-445/86-03 & 50-446/86-02,per 870312 Commitment Re Item E.2 446/8602-D-11.Full Compliance Achieved on 870311 W/ Resolution of Dr I-S-HVDS-075-DR5 + (00:45:49, 7 December 2024)
- ML20207R328 + (00:45:49, 7 December 2024)
- ML20207R325 + (00:45:50, 7 December 2024)
- TXX-6318, Interim Deficiency Rept CP-86-08 Re Stamps Used to Identify Super Hilti Kwik Bolts (Hkbs).Initially Reported on 860206. Three Cable Tray Supports Had Std HKBs When Design Drawing Required Super Hkbs.Next Rept Anticipated by 870722 + (00:45:51, 7 December 2024)
- ML20207R320 + (00:45:51, 7 December 2024)
- ML20207R317 + (00:45:52, 7 December 2024)
- ML20207R311 + (00:45:53, 7 December 2024)
- ML20207R313 + (00:45:53, 7 December 2024)
- TXX-6330, Final Deficiency Rept CP-86-65 Re Unconsolidated Concrete in Exterior Wall of Reactor Containment Bldg.Initially Reported on 861015.Unconsolidated Concrete Repaired Per Established Site Procedures.Condition Not Reportable Per 10CFR50.55(e) + (00:45:54, 7 December 2024)
- ML20207R307 + (00:45:54, 7 December 2024)
- IR 05000263/1986008 + (00:45:56, 7 December 2024)
- ML20207R297 + (00:45:56, 7 December 2024)
- IR 05000312/1986041 + (00:45:57, 7 December 2024)
- ML20207R292 + (00:45:57, 7 December 2024)
- ML20207R290 + (00:45:58, 7 December 2024)
- ML20207R291 + (00:45:58, 7 December 2024)