Special Rept Spr 87-001:on 870210,discovered That Seismically Unqualified Fire Damper Installed in Return Ventilation Header Associated W/Switchgear Room 1DB.Damper Declared Inoperable.Temporary Blocking Device Installed
ML20207R290
Person / Time
Site: Summer South Carolina Electric & Gas Company icon.png
Issue date: 03/12/1987
From: Nauman D
SOUTH CAROLINA ELECTRIC & GAS CO.
To: Grace J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
SPR-87-001, SPR-87-1, NUDOCS 8703170066
Download: ML20207R290 (2)


Text

-

10CFR50.36 Dan n

, g,Cagna Electric & Gas Company Nuclear Operations Co um,tgn 29218 SCE&G

~

March 12, 1987 Dr. J. Nelson Grace Region Administrator U. S. Nuclear Regulatory Commission Suite 2900 101 Marietta Street, NW Atlanta, Georgia 30323

SUBJECT:

Virgil C. Summer Nuclear Station Docket No. 50/395 Operating License No. NPF-12 Special Report (SPR 87-001)

Dear Dr. Grace:

Attached is a Special Report for the Virgil C. Summer Nuclear Station.

This Special Report is being submitted in accordance with Section 6 of the Technical Specifications.

Should there be any questions, please call us at your convenience.

ery r yours, D. A. Nauman RJB: DAN /bjh Attachment l cc: 0. W. Dixon, Jr./T. C. Nichols, Jr. G. O. Percival i E. C. Roberts R. L. Prevatte l

J. G. Connelly, Jr. J. B. Knotts, Jr.

W. A. Williams, Jr. S. D. Hogge Group Managers I&E Washington

0. S. Bradham Document Management D. R. Moore Branch W. R. Baehr INP0 Records Center

( W. T. Frady ANI Library l C. L. Ligon (NSRC) NPCF R. M. Campbell File K. E. Hodland R. A. Stough 8703170066 870312 DR ADOCK 050 g 5 lI

y Dr. J. Nelson Grace SPR 87-001 Attachment March 12, 1987 EVENT DESCRIPTION On February' 10, 1987, Quality Control personnel identified that a seismically unqualified fire damper was installed in the return ventilattun liedder associated with switchgear room 108. A Nuncunformance Notice was initiated documenting the discrepancy and forwarded to Nuclear Engineering for evaluation. Nuclear Engineering recommended disposition was to install a blocking device to prevent closure pending receipt of a qualified replacement. The blocking device will prevent the inadvertent closure of the damper during a seismic event. The fire damper was declared inoperable, and an hourly fire watch patrol initiated. All fire dampers have been inspected and meet the design basis for fire protection.  :

A purchase order will be initiated for procurement of a qualified fire damper and will be installed upon receipt.