Forwards Suppl to Response to Miscellaneous Electrical & Instrumentation Issues
ML20207R291
Person / Time
Site: Vogtle  
Issue date: 03/10/1987
From: Gucwa L
GEORGIA POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
SL-2138, NUDOCS 8703170068
Download: ML20207R291 (3)


Text

, _ _ _ - - - _ _ _ _

Georgo Fbwer comptny 4

333 Pcomont Avenue Atista. Georgia 30308 Telephone 404 5264520 Mailing Address:

Fbst Office Box 4545 Atlanta, Georgia 30302 -

Georgia Pbwer L T. Gucwe tv southern estcrc system Manager Nuclear Safety and Ucensing 0156m March 10,1987 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C.

20555 NRC DOCKETS 50-424, 50-425 OPERATING LICENSE NPF-61, CONSTRUCTION PERMIT CPPR-109 V0GTLE ELECTRIC GENERATING PLANT UNIT 1, 2 SUPPLEMENT TO RESPONSE TO MISCELLANEOUS ELECTRICAL AND IN5TRUMENTATION ISSUES Gentlemen:

By letter SL-2097 dated March 2,1987, Georgia Power Company provided information in response to NRC Region II correspondence RII-87-A-0018 dated February 10, 1987.

Our response indicated that additional information would be provided at,a later date.

Enclosed is that information.

A copy of this response has been forwarded to NRC Region II for their review.

Should the NRC wish to review this matter in greater detail, the appropriate documentation can be found in Project Files.

This response contains no proprietary information and may be placed in the Public Document Room.

Should you have any questions in this regard, please contact this office at any time.

Sincerely, e=T~4t= :

L. T. Gucwa JAE/WCL/Im Enclosure iff h

G703170068 870310 PDR ADOCM 05000424 P

PDR

'GeorgiaPower d U. S. Nuclear Regulatory Comission March 10,1987 Page Two c(w): Geors ia Power Company Mr.

F,. E. Conway Mr. J. P. O'Reilly Mr. G. Bockhold, Jr.

Mr. J. F. D' Amico GO-NORMS Southern Company Services Mr. J. A. Bailey Shaw, Pittman, Potts & Trowbridge Mr. B. W. Churchill, Attorney-at-Law Troutman, Sanders, Lockerman & Ashmore Mr. J. E. Joiner, Attorney-at-Law U. S. Nuclear Regulatory Comission Dr. J. N. Grace, Regional Administrator Mr. H. H. Livermore, Senior Resident Inspector-Construction, Yogtle Ms. M. A. Miller, Licensing Project Manager, NRR (2 copies)

Mr. J. F. Rogge, Senior Resident Inspector-Operations, Yogtle Geortfans Against Nuclear Energy Mr. [. Feig Ms. C. Stangler 0156m um

Georgia Power n ENCLOSURE TO SL-2138 NRC DOCKETS 50-424, 50-425 OPERATING LICENSE NPF-61, CONSTRUCTION PERMIT CPPR-109 V0GTLE ELECTRIC GENERATING PLANT UNIT 1, 2 SUPPLEMENT TO RESPONSE TO MISCELLANE0US ELECTRICAL AND INSTRUMENTATION ISSUES The following information is provided to supplement Georgia Power Company (GPC) letter SL-2097 dated March 2,1987, which responded to NRC Region II correspondence RII-87-A-0018 dated February 10, 1987.

Specifically, the information provided herein supplements the response to Items 287001801 and 287001802.

This response and GPC letter SL-2097 are to be used in conjunction with each other.

SUPPLEliENTAL RESPONSE TO ITEM 287001801 In the response to Item 287001801 as provided by GPC letter SL-2097 dated March 2, 1987, GPC concluded that an apparent deviation of the site separation criteria had been identified.

The response further indicated that the deviation had been documented on Deficiency Card 1-87-743 and that an engineering analysis was being conducted on the appropriate resolution.

Deficiency Card 1-87-743 has since been dispositioned as a

" Rework" to provide the required separation.

The rework is currently in progress and is scheduled to be completed by March 11, 1987.

It should be noted that the minimum separation criteria for low level control or instrumentation circuits per the project design criteria is 1 inch.

Construction Specification X3AR01, Section E9, Attachment 2 allowed a 1 inch minimum based on testing performed and documented in Design Criteria DC1810, Paragraph 3.1.2.H and Final Safety Analysis Report (FSAR) Table

8. 3.1 -4.

SUPPLEMENTAL RESPONSE TO ITEM 287001802 In the response to Item 287001802 as provided by GPC letter SL-2097 referenced above, GPC concluded that there were two instances of non-safety related communications wiring for panel-mounted telephones on main control boards.

The response further indicated that Deficiency Card 1-87-783 was written relative to the wiring of the two telephones and that any corrective actions required would be addressed in a supplemental response to the NRC.

Deficiency Card 1-87-783 has since been dispositioned as a " Rework" to provide the required separation.

The rework is scheduled to be completed by March 11, 1987.

E-1 3/10/87 0156m um

-