OPERATING DATA REPORT-DOCKET NO. 050-400 DATE 3/5/87
. COMPLETED BY'J.'H. Westmoreland TELEPHONE (919) 362-2597' OPERATING STATUS 1.-Unit'Name: Shearon Harris' Unit 1
- 2. Reporting-Period: February 1987 Notes:
- 3. Licensed' Thermal Power-(MWt): 2775 Power Ascension Testing in
- 4. Nameplate Rating (Gross MWe): 950 Progress.
5 ' Design Electrical Rating (Net-MWe): 900
- 6. Maximum Dependable Capacity (Gross-MWe): 950
- 7. Maximum Dependable Capacity (Net-MWe): 900
- 8. If Changes Occur in. Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons: N/A
- 9. Power-Level To Which Restricted, If Any (Net-MWe):
None
- 10. Reasons.For Restrictions, If Any:
N/A This Month Yr.-to-Date
. Cumulative
'11. Hours in Report Period 672 962 962
- 12. Number Of Hours Reactor Was Critical 644 803 803
- 13. Reactor Reserve Shutdown Hours 0
0 0
- 14. Hours Generator On-Line 610 678 678
- 15. Unit Reserve Shutdown Hours
.0 0
0
- 16. Gross. Thermal Energy Generated (MWH) 605154.24 655,070.94 655,070.94
- 17. Gross Electrical Energy Generated (MWH) 148050 152200 152200
- 18. Net' Electrical Energy Generated (MWH) 118886 118886 118886
-19. Unit Service Factor N/A N/A N/A
- 20. Unit _ Availability Factor N/A N/A N/A
- 21. Unit. Capacity Factor (Using MDC Net)
N/A N/A N/A 22.' Unit Capacity Factor (Using DER Net)
N/A N/A N/A
- 23. Unit Forced Outage Rate N/A N/A N/A-
- 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each);
- 25. If Shut Down At End Of Report Period, Estimsted Date of Startup:
i
- 26. Units In Test Status (Prior to Commercial Operation):
Forecast Achieved INITIAL CRITICALITY 12/30/86 1/3/87-INITIAL ELECTRICITY 1/11/87 1/19/87 COMMERCIAL OPERATION 4/6/87 N/A I
1 f-i.
A 1
CEH087/ attach 3464/1/OS4
- V
/
G703170184 870228 PDR ADOCK 05000400=
/
R PDR.
CP&LICO.
PLANT PERFORMANCE DATA SYSTEM.
APPENDIX B - AVERAGE DAILY POWER LEVEL HARRIS UNIT 1 DOCKET NO. 050-400 COMPLETED BY J. H. WESTMORELAND TELEPHONE (919)362-2597 February 1987 DAY AVG. DAILY POWER LEVEL DAY AVG. DAILY ~ POWER' LEVEL (MWE-NET)
(MWE-NET) 1 102 17 173 2
118 18 188 3
111 19 186 4-108 20 311 5
105 21 319 6
96 22 295 7
160 23 339 8
177 24 341 9
182
'25 335 10 131 26 331 11.
180 27 248 12 201 28 13 16 14 15 15 56 16 163 1.16 - 8 CEH087/ attach 3464/2/OS4
m UNIT S!!UTDOWNS AND POWER REDUCTIONS DOCKET NO.
050-400 UNIT NAME:
Harris DATE:
3/5/87 COMPLETED BY:
J. H. Westmoreland REPORT MONTH: February 1987 TELEPHONE:
(919) 362-2597 i
% pf' Licensee y
Cause & Corrective cm n
No.
Date o*
Event en Action to 3
k j($
Report #
$[
y Prevent Recurrence S
Ii-E
- 5 G
$u E
~
a e
mu u
87-005 2/13/87 5
8.53 B
5 N/A XX PUMPXX Unit was removed from grid to Test 1B Vacuum Pump and to calibrate steam _
generator level control instrumentation. Tests were completed and unit returned to service.87-006 2/14/87 F
24.10 B
5 N/A.
HH PUMPXX Unit was taken off line to repair main feedwater pump "1A" Discharge leak. Leak was repaired and unit returned to service.
1 2
3 4
F: Forced Reason:
Method:
Exhibit G-Instructions S: Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance or Test 2-Manual Scram.
Entry Sheets for Licensee C-Refueling 3-Automatic Scram.
Event Report (LER) File D-Regulatory Restriction 4-Continued (NUREG-0161)
E-Operator Training & License Examination 5-Reduced Load F-Administrative 6-Other 5
G-Operational Error (Explain)
Exhibit I-Same Source H-Other (Explain)
CEH086/ attach 3464/3/054
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.
050-400 UNIT NAME:
Harris DATE:-
3/5/87-COMPLETED BY:
J. H. Westmoreland REPORT-MONTH: February 1987 TELEPHONE:
(919) 362-2597 g.
- - en 3 Licensee v
Cause & Corrective No.
Date y
yy{
Event E*
Action to c
yg o,
ga:
Report #
j,,
d Prevent. Recurrence R
85
.5" RB 8"
j s
o x
x mv v
87-007 2/27/87 F
58:23 A
2 87-008 HH PUMPXX Hanual Reactor Trip initiated due to loss of feedwater. ' Root cause investigation in progress.
1 2
3 4
F: Forced Reason:
Method:
Exhibit G-Instructions S: Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance or Test 2-Manual Scram.
Entry Sheets for Licensee C-Refueling 3-Automatic Scram.
Event Report (LER) File D-Regulatory Restriction 4-Continued (NUREC-0161)
E-Operator Training & License Examination 5-Reduced Load F-Admini strative 6-Other 5
C-Operational Error (Explain)
Exhibit 1-Same Source H-Other (Explain)
CEH086/ attach 3464/5/OS4
Carolina Power & Light Company l
v o,~ a m.., r v v - =,, e n-,
l HARRIS NUCLEAR PROJECT l
P. O. Box 165 i
New Hill, North Carolina 27562 MAR 121987 File Number:
SHF/10-15505 Letter Number:
HO-876017 (0)
Document Control Desk United States Nuclear Regulatory Commission Washington, D.C.
20555 HARRIS NUCLEAR PROJECT DEPARTMENT UNIT NO. 1 DOCKET NO. 50-400 LICENSE NO. NPF-63 MONTHLY OPERATIONS REPORT
Dear Sirs:
In accordance with Technical Specifications 6.9.1.5 for the Harris Nuclear Plant, Unit No. 1, Carolina Power & Light Company herewith submits the report of operation statistics and shutdown experience for the month of February 1987.
Yours very truly, R. A. Watson Vice President Harris Nuclear Project MWH:skm l
Enclosure i
cc:
Dr. J. Nelson Crace (NRC)
Messrs.
J. M. Taylor (NRC)
C. F. Maxwell (NRC-SHNPP)
R. G. Oehl (DOE) i i
I MEM/HO-8760170/ PACE 1/0S1