Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- TAC:M85420 + (12:46:03, 6 January 2025)
- ML18059A562 + (12:46:04, 6 January 2025)
- IR 05000255/1993024 + (12:46:33, 6 January 2025)
- ML18059A559 + (12:46:42, 6 January 2025)
- ML18059A557 + (12:46:43, 6 January 2025)
- ML18059A554 + (12:46:44, 6 January 2025)
- RS-18-010, Tenth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-BeyondDesign-Basis External Events + (12:46:45, 6 January 2025)
- ML18059A548 + (12:46:47, 6 January 2025)
- ML18059A547 + (12:46:48, 6 January 2025)
- ML18059A546 + (12:46:50, 6 January 2025)
- ML18059A545 + (12:46:51, 6 January 2025)
- ML18059A544 + (12:46:52, 6 January 2025)
- ML18059A542 + (12:46:53, 6 January 2025)
- 05000255/LER-1993-012, :on 931103,concluded That Seismic Qualification Did Not Exist for Relays Previously Installed in Chp & Chr Circuits Due to Undersized Relay Coils.Undersized Coils in Relays Replaced + (12:46:56, 6 January 2025)
- 05000255/LER-1993-008, :on 930824,V-27D Safeguards Room Cooling Fan Motor Failed to Start Due to Improper Thermal Overload Protection Design.Addl Thermal Overload Setting Changes & Breakers Changes Made + (12:46:58, 6 January 2025)
- ML18059A539 + (12:47:00, 6 January 2025)
- ML18059A538 + (12:47:01, 6 January 2025)
- ML18059A536 + (12:47:03, 6 January 2025)
- ML18059A535 + (12:47:04, 6 January 2025)
- ML18059A533 + (12:47:06, 6 January 2025)
- IR 05000255/1993013 + (12:47:07, 6 January 2025)
- ML18059A528 + (12:47:17, 6 January 2025)
- ML18059A527 + (12:47:18, 6 January 2025)
- ML18059A526 + (12:47:26, 6 January 2025)
- ML18059A523 + (12:47:34, 6 January 2025)
- ML18059A521 + (12:47:35, 6 January 2025)
- 05000255/LER-1993-009, :on 930916,identified Pressurizer Penetration Safe End Crack Which Resulted in PCS Leakage.Crack Initiated Due to PWSCC in HAZ of PORV Inconnel 600 Safe End. Engineering Evaluation of Failure Conducted + (12:47:37, 6 January 2025)
- ML18059A519 + (12:47:38, 6 January 2025)
- 05000255/LER-1993-009-01, Forwards LER 93-009-01 Re Pressurizer Penetration Safe End Crack Resulting in PCS Leakage,Suppl Rept.Suppl Changes Event Date from 930919 to 930916 + (12:47:40, 6 January 2025)
- ML18059A515 + (12:47:43, 6 January 2025)
- ML18059A516 + (12:47:43, 6 January 2025)
- ML18059A513 + (12:47:45, 6 January 2025)
- ML18059A512 + (12:47:46, 6 January 2025)
- ML18059A511 + (12:47:47, 6 January 2025)
- ML18059A510 + (12:47:48, 6 January 2025)
- ML18059A509 + (12:47:49, 6 January 2025)
- 05000255/LER-1993-007-01, :on 930817,degradation of Boraflex Neutron Absorber in Surveillance Coupons Observed.Cause of Event Unknown.Temporary Requirement for Daily Sampling & Analysis of SFP Boron Discontinued + (12:47:51, 6 January 2025)
- ML18059A504 + (12:47:53, 6 January 2025)
- ML18059A497 + (12:47:54, 6 January 2025)
- 05000255/LER-1993-011, :on 931009,insp of Pressurizer Upper Temp Nozzle Penetration Found to Be Leaking.Caused by Primary Water Stress Corrosion Cracking of Inconel 600 Nozzle Matl. Leaking Pressurizer Temp Penetrations Repaired + (12:47:56, 6 January 2025)
- ML18059A492 + (12:47:57, 6 January 2025)
- ML18059A491 + (12:47:58, 6 January 2025)
- ML18059A490 + (12:47:59, 6 January 2025)
- ML18059A488 + (12:48:02, 6 January 2025)
- ML18059A487 + (12:48:03, 6 January 2025)
- ML18059A483 + (12:48:04, 6 January 2025)
- ML18059A482 + (12:48:06, 6 January 2025)
- ML18059A481 + (12:48:07, 6 January 2025)
- ML18059A480 + (12:48:08, 6 January 2025)
- ML18059A479 + (12:48:09, 6 January 2025)
- ML18059A478 + (12:48:17, 6 January 2025)