MONTHYEARML18066A4671999-03-31031 March 1999 Rev 0 to SIR-99-032, Flaw Tolerance & Leakage Evaluation Spent Fuel Pool Heat Exchanger E-53B Nozzle Palisades Nuclear Plant. ML20249C4951998-06-17017 June 1998 Rev 1 to EA-GEJ-98-01, Palisades Cycle 14 Disposition of Events Review ML18066A3411998-04-22022 April 1998 Rev 0 to EMF-98-013, Palisades Cycle 14:Disposition & Analysis of SRP Chapter 15 Events. ML20217C2741998-03-31031 March 1998 Independent Review - Is Consumers Energy Method (W Method) of Determining Palisades Nuclear Plant Best Estimate Fluence by Combining Transport Calculation & Dosimetry Measurements Technically Sound & Does It Meet Intent of Pts ML18065B1641998-02-0505 February 1998 Rev 0 to Regression Analysis for Containment Prestressing Sys at 25th Year Surveillance. ML20197J3891997-12-18018 December 1997 25th Year Physical Surveillance of Palisades Npp ML20217C2571997-12-16016 December 1997 Review of Neutron Fluence Data for Palisades Reactor Pressure Vessel ML18067A6351997-07-0909 July 1997 Excerpt from Ampacity Evaluation for Open Air Cable Trays W/Percent Fill Greater than 30% of Useable Cross Sectional Area. ML18067A6381997-07-0909 July 1997 Excerpt from Ampacity Evaluation for Continuously Energized Power Cables Routed Through Fire Stops, Revision 1 ML18067A6371997-07-0808 July 1997 Excerpt from Ampacity Evaluation for Duct Runs Containing Continuously Energized Power Cables, Revision 1 ML18067A6361997-06-26026 June 1997 Excerpt from Ampacity Evaluation for Continuously Energized Power Cables in Open Air Conduits, Revision 1 ML18066A8581997-01-31031 January 1997 Rev 2 to C-PAL-96-1063-01, Operability Assessment for Transient Conditions at Palisades Nuclear Plant in Response to GL 96-06. ML18065B0471996-07-12012 July 1996 TR on Use of Mcbend Code for Calculation of Neutron Fluences in PVs of Lwrs. ML18065A7571996-05-22022 May 1996 Rev 1 to IPEEE Rept, Per GL 88-20 ML20108C1671996-04-0101 April 1996 Nonproprietary Version of Fluence Calculations for Palisades Plant ML18065A5971996-03-23023 March 1996 Evaluation of Effects of Fire on West Wall of Turbine Lube Oil Room Adjacent to Pipe Tunnel Between TB & FW Purity Bldg. ML18065A6011996-03-22022 March 1996 Evaluation of Effects of Fire on West Wall of CCW Pump Room (Fire Area 16). ML20100D7491996-01-18018 January 1996 Rev 0 to Evaluation of Effects of Fire on West Wall of TB Lube Oil Room Adjacent to Pipe Tunnel Between TB & FW Purity Bldg ML18065A4481995-12-14014 December 1995 Radiological Consequences for Palisades Max Hypothetical Accident & Loss of Coolant Accident. ML18064A8321995-06-30030 June 1995 IPE of External Events (Ipeee). ML20085H2801995-05-23023 May 1995 Security Investigation Rept ML18064A7801995-05-19019 May 1995 Rept of SQUG Assessment at Palisades Nuclear Plant for Resolution of USI A-46. ML20078P7021995-01-27027 January 1995 Investigative Rept ML18064A4121994-08-22022 August 1994 Pressure-Temp Curves & LTOP Setpoint Curve for Max Reactor Vessel Fluence of 2.192 X 10^19 Neutrons/cm^2. ML20070J8001994-07-15015 July 1994 Final Rept Containment Sump Check Valves Weld Overlay Repair Implementation Evaluation Palisades Nuclear Plant ML18059B0041994-04-0505 April 1994 Rev 1 to EDG Fuel Supply Sys Storage Tank Tornado Protection Overview of EDG Fuel Supply Sys, Incorporating CARB Comments of 940318 & 24 ML20064E5301994-03-0606 March 1994 Evaluation of Effectiveness of Code Case N-504-1 Repair for Proposed Root Causes for Containment Sump Suction Check Valves ML20064E4451994-03-0505 March 1994 Check Valve Leak Root Cause,Engineering Analysis & Repair/Replacement Options ML18059A5161993-10-31031 October 1993 Nonproprietary Exam...Sections of Pressurizer PORV Line Safe-End Failure from Palisades Nuclear Generating Station. ML20058P1361993-10-31031 October 1993 Crack Propagation Analysis for Circumferential Cracks in Alloy 600 Nozzle Safe-Ends ML18059A4821993-10-25025 October 1993 Evaluation of Potential Interference Between TE-0102 Nozzle & Thermowell. ML18059A4831993-10-25025 October 1993 Structural Evaluation for Machined Thermawell for TE-0101. ML20059D8811993-10-23023 October 1993 Justification of Weld Mods to Pressurizer Temperature Nozzles for TE-0101 & TE-0102 ML18059A4811993-10-22022 October 1993 Acceptability of Partial Severing of TE-0101 Nozzle. ML18059A4801993-10-19019 October 1993 Structural Analysis of Temperature Nozzle Weld Mods for Consumers Power Palisades Pressurizer. ML18059A4791993-10-15015 October 1993 Half Bead Welding for Mods to TE-0101 & TE-0102. ML18059A4221993-10-0707 October 1993 Pressurizer Safe End Crack Engineering Analysis & Root Cause Evaluation. ML18059A3751993-08-31031 August 1993 Rev 1 to Palisades Cycle 11:Disposition & Analysis of SRP Chapter 15 Events. ML18059B0191993-07-31031 July 1993 Detailed Site Study,Berrien County,Mi, Final Rept ML18064A4271993-06-30030 June 1993 Wind Tunnel Predictions of Control Room Intake Concentrations from Three Sources of Radioactive Materials at Palisades Nuclear Power Plant, (CPP-Project 93-0907) ML18058B8661993-05-13013 May 1993 Resolution of Anchor Bolt Design Issues. ML18058B3911992-12-21021 December 1992 Cycle 11:Disposition & Analysis of Standard Review Plan Chapter 15 Events. ML18058B4281992-11-30030 November 1992 Vols 1,2 & 3 of Palisades Nuclear Plant Ipe. ML18058A5391992-06-16016 June 1992 Twentieth Yr Physical Surveillance of Palisades Nuclear Plant. ML20086P8551991-12-0909 December 1991 Criticality Safety Analysis for Palisades Spent Fuel Storage Pool NUS Racks ML20086P8571991-12-0909 December 1991 Criticality Safety Analysis for Palisades New Fuel Storage Array ML18057B3521991-10-31031 October 1991 Large Break Loca/Eccs Analysis W/Increased Radial Peaking & Reduced ECCS Flow. ML18057A8591991-03-31031 March 1991 Benchmarking & Validation of In-House DOT Calculation Methodology. ML20081K7741990-08-14014 August 1990 Incore Detector Algorithm (Pidal) Analysis of Quadrant Power Tilt Uncertainties ML18057A2611990-06-11011 June 1990 Simulator Certification Submittal. 1999-03-31
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML18066A6901999-11-0101 November 1999 Rev 5 to Palisades Nuclear Plant Colr. ML18066A6761999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 for Palisades Nuclear Plant ML18066A6271999-09-0202 September 1999 LER 98-011-01:on 981217,inadequate Lube Oil Collection Sys for Primary Coolant Pumps Was Noted.Caused by Design Change Not Containing Appropriate Level of Rigor.Exemption from 10CFR50,App R Was Requested.With 990902 Ltr ML18066A6351999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Palisades Nuclear Plant ML18066A6771999-08-31031 August 1999 Operating Data Rept Page of MOR for Aug 1999 for Palisades Nuclear Plant ML18066A6221999-08-20020 August 1999 LER 99-002-00:on 990722,TS Surveillance Was Not Completed within Specified Frequency.Caused by Failure to Incorporate Revised Frequency Into Surveillance Schedule in Timely Manner.Verified Implementation.With 990820 Ltr ML18066A6061999-07-31031 July 1999 Monthly Operating Rept for July 1999 for Palisades Nuclear Plant.With 990803 Ltr ML18066A5201999-06-30030 June 1999 Monthly Operating Rept for June 1999 for Palisades Nuclear Plant.With 990702 Ltr ML18066A4841999-05-31031 May 1999 Monthly Operating Rept for May 1999 for Palisades Nuclear Plant.With 990603 Ltr ML18066A6371999-04-30030 April 1999 Revised Monthly Operating Rept for Apr 1999 for Palisades Nuclear Plant ML18068A5941999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for Palisades Nuclear Plant.With 990503 Ltr ML18066A4161999-04-0101 April 1999 Rev 4 to COLR, for Palisades Nuclear Plant ML18066A4501999-03-31031 March 1999 Monthly Operating Rept for Mar 1999 for Palisades Nuclear Plant.With 990402 Ltr ML18066A4671999-03-31031 March 1999 Rev 0 to SIR-99-032, Flaw Tolerance & Leakage Evaluation Spent Fuel Pool Heat Exchanger E-53B Nozzle Palisades Nuclear Plant. ML18068A5351999-02-28028 February 1999 Monthly Operating Rept for Feb 1999 for Palisades Nuclear Plant.With 990302 Ltr ML18066A3931999-01-31031 January 1999 Monthly Operating Rept for Jan 1999 for Palisades Nuclear Plant.With 990202 Ltr ML18066A3781999-01-20020 January 1999 LER 98-013-00:on 981222,safeguards Transfer Tap Changer Failure Caused Inadvertant DG Start.Caused by Failed Motor Contactor.Contactor Was Replaced.With 990120 Ltr ML20206F6131998-12-31031 December 1998 1998 Consumers Energy Co Annual Rept. with ML18066A3651998-12-31031 December 1998 Monthly Operating Rept for Dec 1998 for Palisades Nuclear Plant.With 990105 Ltr ML18066A3421998-11-30030 November 1998 Monthly Operating Rept for Nov 1998 for Palisades Nuclear Plant.With 981202 Ltr ML18066A3301998-11-11011 November 1998 Part 21 Rept Re Potential Safety Hazard Associated with Wrist Pin Assemblies for FM-Alco 251 Engines at Palisades Nuclear Power Plant.Caused by Insufficient Friction Fit Between Pin & Sleeve.Supplier of Pin Will No Longer Be Used ML18068A4921998-10-31031 October 1998 Monthly Operating Rept for Oct 1998 for Palisades Nuclear Plant.With 981103 Ltr ML18068A4851998-10-29029 October 1998 LER 97-011-01:on 971012,starting of Primary Coolant Pump with SG Temps Greater than Cold Leg Temps Occurred.Caused by Inadequate Procedures & Operator Decision.Sop Used for Starting Primary Coolant Pump Enhanced ML18066A3181998-09-30030 September 1998 Monthly Operating Rept for Sept 1998 for Palisades Nuclear Plant ML18066A2901998-08-31031 August 1998 Monthly Operating Rept for Aug 1998 for Palisades Nuclear Power Plant.With 980903 Ltr ML18066A3191998-08-31031 August 1998 Revised Monthly Operating Rept Data for Aug 1998 for Palisades Nuclear Plant ML18066A2831998-08-18018 August 1998 LER 98-010-00:on 980721,reactor Manually Tripped.Caused by Failure of Coupling Which Drives Feedwater Pump Main Lube Oil Pump.Main Lube Oil Pump Coupling & Associated Components Replaced & Satisfactorily Tested ML18066A2771998-08-13013 August 1998 Part 21 Rept Re Deficiency in CE Current Screening Methodology for Determining Limiting Fuel Assembly for Detailed PWR thermal-hydraulic Sa.Evaluations Were Performed for Affected Plants to Determine Effect of Deficiency ML20237E0301998-07-31031 July 1998 ISI Rept 3-3 ML18066A2701998-07-31031 July 1998 Monthly Operating Rept for July 1998 for Palisades Nuclear Plant.W/980803 Ltr ML18066A2311998-06-30030 June 1998 Monthly Operating Rept for June 1998 for Palisades Nuclear Plant ML18066A2261998-06-30030 June 1998 LER 98-009-00:on 980531,small Pinhole Leak Found on One of Welds,During Leak Test Following Replacement of Pcs Sample Isolation Valves.Caused by Welder Error.Leaking Welds Repaired ML18066A3061998-06-18018 June 1998 SG Tube Inservice Insp. ML20249C4951998-06-17017 June 1998 Rev 1 to EA-GEJ-98-01, Palisades Cycle 14 Disposition of Events Review ML18066A1781998-06-0909 June 1998 LER 98-008-00:on 980511,noted That Procedure Did Not Fully Satisfy Requirement to Test High Startup Rate Trip Function. Caused by Misunderstanding of Testing Requirements.Revised TS Surveillance Test Procedure & Reviewed Other Procedures ML18066A1711998-06-0101 June 1998 Part 21 Rept Re Impact of RELAP4 Excessive Variability on Palisades Large Break LOCA ECCS Results.Change in PCT Between Cycle 13 & Cycle 14 Does Not Constitute Significant Change Per 10CFR50.46 ML18066A1741998-05-31031 May 1998 Monthly Operating Rept for May 1998 for Palisades Nuclear Plant.W/980601 Ltr ML18066A2321998-05-31031 May 1998 Revised MOR for May 1998 for Palisades Nuclear Plant ML18068A4701998-05-31031 May 1998 Annual Rept of Changes in ECCS Models Per 10CFR50.46. ML18065B2451998-05-13013 May 1998 LER 98-007-00:on 980413,HPIS Sys Was Noted Inoperable During TS Surveillance Test.Caused by Performance of Flawed Procedure.Operators & Engineers Will Be Trained to Improve Operational Decision Making Through Resources & Knowledge ML18066A2331998-04-30030 April 1998 Revised MOR for Apr 1998 for Palisades Nuclear Plant ML18068A3461998-04-30030 April 1998 Monthly Operating Rept for Apr 1998 for Palisades Nuclear Plant.W/980501 Ltr ML18066A3411998-04-22022 April 1998 Rev 0 to EMF-98-013, Palisades Cycle 14:Disposition & Analysis of SRP Chapter 15 Events. ML18065B2071998-03-31031 March 1998 Monthly Operating Rept for Mar 1998 for Palisades Nuclear Plant.W/980403 Ltr ML20217C2741998-03-31031 March 1998 Independent Review - Is Consumers Energy Method (W Method) of Determining Palisades Nuclear Plant Best Estimate Fluence by Combining Transport Calculation & Dosimetry Measurements Technically Sound & Does It Meet Intent of Pts ML18066A2341998-03-31031 March 1998 Revised MOR for Mar 1998 for Palisades Nuclear Plant ML18068A3041998-02-28028 February 1998 Monthly Operating Rept for Feb 1998 for Palisades Nuclear Plant.W/980302 Ltr ML18066A2351998-02-28028 February 1998 Revised MOR for Feb 1998 for Palisades Nuclear Plant ML18065B1641998-02-0505 February 1998 Rev 0 to Regression Analysis for Containment Prestressing Sys at 25th Year Surveillance. ML18067A8211998-01-31031 January 1998 Monthly Operating Rept for Jan 1998 for Palisades Nuclear Plant.W/980203 Ltr 1999-09-30
[Table view] |
Text
{{#Wiki_filter:PALISADES NUCLEAR PLANT EA* ;:- e S ... 'I 3 - 2 '71- o I ENGINEERING ANALYSIS WORK SHEET Sheet of '-I
-~#S I lllillUI w o.,. .. ac. .... l"\(",.)'r ( C.l4CGi<.c..'1 aT 1
Title '5tr~ti.i.ca I ~g(~~" ::&b: -ike M~c.~~e-' -tlu*~.~Q 1..1.le.l I ~
IE=-01ot INITIATION AND REVIEW ln1t1ated Initiator Review Method Check ( ./) Tecnn1cally Reviewed Re*11ewer Rev Appd Appd
# By Date Alt Det Ou al By Date Description _By Cale Rvw Toest By 0 Original Issue J.C. Wl'VI 10--"ltr.If* *~E~q ./ ~.aa \i.. /Ofisl~"S B~~/< ~wl.~**i..- Ii ;
~
~ ' 0 JJN Reference1Comment
/_O Ob/ecttve.
l~e o.bjec:t:J~ o{ +k~~ a"'dy~~.s -;-~ to de J'v\o~~~te
-tle -s;: f.,.,,._ c.. +u. ri=\ I 'N..+IC i 'r ~ -t.1 ot ~e rY\. o.. c:. L- ~Lo;\ e~
-+ke.rYV'\o well fo< T~ -~I Oj. f2~ f~r -to -tkce. l?e-\. l
~ES- 'r~a.17 'R4v~ o J a.. -s.e ~-\ ' 0 \.Ii o.f ~~
exte'(Y\Cl. \ s ""'v-{~c e e.. + -t\...e i'\ ~ v- tv\..o w e. t I ~s
""~c..\...~"'e~ .wL-.:--C~ re.l.u..Le~ -t'-'e or,' 'f V\ oJJ.. Ji' a.IM. e"'tev-of 0' lt" -;-(\ c..."'-e~ to o. " 8 (;;" ~~c.~e"'S.
2,0 Refe<e1Ac..es I FES -'l. s-271 Rev. C>
- Mo. c...~ -:--""e The.v~ol...)e II 1'.o" TS -o 10 I
- 2. As ME ][ I 1?12. ~d.. Appel\J~y 'I.. \a..~\e I-1~. I I
3 A5ME ]L , t "i72 EJ.. r.'J. 1-(A-Z.
. If. ~f-re~qfh 6f M~fer'.Ctls b~ 5:. T.' ""'O ~ ~ ll) k.o ~rd f.d p~(!_ 2-o1. 9311030076 931027 ~
~DR A°.OCK , ~~Q9~~~5 **, :. '. I
<,-. Ce A"'.-.Qyt;cJ 0.e.por-f C...1=NC- Ill<+ *~ P~ 1~ s.-.J~~ pzR I Form 3619 6*89
EA- F~S 277-0 f PALISADES NUCLEAR PLANT ANALYSIS CONTINUATION SHEET Sheet _ _2. _ _ _ Rev II - ' " - - - -
Reference/Comment (s TP 3fb 4
5 b. ""rte VAi[ -+~~cl('."'~<; s 1:1{ -+kc. M~ c.\,.. >. . .<<~ CS: ec.""t~o ~ Rie. {, )
6
;s o. :Lll~ -:-"'-c..I..,~~. D~e.1r d_ ~Me~ ~,'oVl~
skQ~~
7 a.v-e ~If\ -ti..e ~:tt.:1 cl,,e~ Skt'" -tc.~
8 9
10 11 4 .o A5sum p~":'ol"'\S 12 13 16 17 20 21 ~c:. ~ermo we l\ ~s s.u.. b I e c.t tC> Q. V' e )( terV'I ~
22 pres~1..1..v-e (0&1..cf~.,1 "+ Pr~M~"'/ Ce;o/.:i ...-t pr()5d1Are.
23 Tuea~e. , -the A <;ME JJL exfev-V\oJl f'i"~ s ~ c..t re.
24 de~;*yn IS ~.ppt\c ~bt~. For Tf> 31/:; Sf-. ~ .. le~s 25 26 Sfee IJ R.e.f. 2. n.. t~c.*a_ to -l"'-e d e~,'j"' cJ., ~ ... -t Ref.3 27 1=":-~ t1A-'2. 0 f Ref', 3. To defer~~~ -tl.-e 28 utlow4'1(e ~e\"'r\\*v-1~(( -tkl'-d<.."'-Q">5. t"'-~ ~ll~c..1-:- . . j 29 30 P4't ..,...~ ,.,.,_e~~ V\e ec::it -t~ be C...<=1 le ~t~tec:J..
31 32 pre~~ure <; +v~ s set: -
l "'
-+he y c.. I~"' J. ... ~co.l -:."'e / {
Po b L Q 2..
33 34 a; .::
h?. - ~.? ( I+~ ) ~~-~
~, ~ _ . 6S .r-wh ~r~ 'b = D~s:J~ ~ ,u. -
2 = .~~~t"'
0... ~ -:-v-.s~J.~ t"<ld ,'ut; : *~ c+-ir- - . 2..11 ~ =-. I 2. ~
37 38 Form 3650 10-91
EA- r6-S- '13- 2-77 -o/
PALISADES NUCLEAR PLANT ANALYSIS CONTINUATION SHEET Sheet _ _ _ 3___ Rev If. _ 0 Reference/Comment 4
p : 2-S-Oo pe;:
5 6
7 c-::.
r ( I+ l ) - t;7 b 8 p ~.
8 9
10 Co" ~~'f u.:;..I~ .-e... \j a.. ~s tA. V°t' ~ -t\.._.o;i- -tke ~ ~' +\ r C!'. I e 111. 'l ..... ~
11 o.+ +he -+J.,..~v--w.o~etl c.y\~"'dicr- 'Is u.v-.dE!r b ~~:
12 pres':. v.re ~-+rl c-s.
13 14 /2e{er "to i'k~ Q'f\.._c.I..~&. sk.~+c. \...., (<c.:t '--:::.. l 's '1 15 I')
16 ?{Q - .bS<;
~ 2. / .q 17
])/f
*6 8 !;
-
= 3. l S" 20 :"Fv-o~ F~ . ~ ~~ R.ef. s. ~e FAc 1oe A 21
-;-::, 612'/e>""d -+h~ ~~y-t~co.R. v-a.V17e. Tkv-ef<_'Ve ,1 22
~ -+l.-..t ~tJ...V'fO.S~ e>f ~ ~~<;, ;-5, .::\. Covi~ev-uc...\:~
23 24
. 25 26 27 28 'Fr-o Qe{. S r"\ F°'G/ H-A-1. I -8....e CoY't'<t>'ipot1 J,,..,. j 29 B ::r:-~C-TCJR.. f~r A~* 01 f~~ f"~-r(.-+IA..t ":: . 7 a 0 * -p.
30 31 ~~ t 3 ( ooo ps:. w~~~ "- '\"~ wel\ a_bo11e *e 32 then"1 owe. (( de~~ ... p~<~txte: Df 2:t"oo p~:
33 .S-h-e<; ~ S-76 S 34 37 38 L.-----------------------------------------------------------------------_.
Form 3650 10-91
EA. FES - &/ 3 < 7 -o I PALISADES NUCLEAR PLANT ANALYSIS CONTINUATION SHEET Sheet _ _ J/-
___ Rev 1 _o_ _ __
Reference/Comment
~
£.o 4 10.~s ~nJvs-:-s de.VV\c'A.c::h*at"e& -+\..& -t\....e ~r~(\t\.:ny
<<STr-e. .Ss~~ '\'VI -+ke i:..J.... I""' ~cl. -th. e ..- w ~I\ a..r~
5 VY\<(. l'V'I <J 6
w ~ th.; V\ +he C~ d e a. l l o"" a b I e . Tu e 7
iv\ A ..... :-,.,., "'4.."""' s+H:." Sc; ',,, +ef;ls~ t I """ -t\...~ v.rv:u:."' ~IA e.o(
B 9 s- c:~ ~ 0 "' 's- 6 -+ 2. * ~ ~ 8. ts !< c:, ,' c.....> h ~ c.h ('~
10 c.veil beloGJ -tke. Y'Y\a.tev-~~ s+re~4+l- -{?ov -t~e 11 S $. ~I b Sf., l"k (e~i; ~tee.\ .J:: ~ ic. clrc. ~)..., -fe~p>Y41u~
12
~~ bc...ck:I ;.,-.7 s~"'1+~ o{' -the Vl"-"1.ct.-.:- ... eo{
13 cy/.'1.1.deV' ex.ceeds --t-i-12 f:.?_e-(. s s.--f~p""'-lo..+~c.l 14 15 v~\u..e.
- 16 17 Bee~~ ~f -+/,..a.ve .~ ~e~'iA..Ji.'/ 11 {) s4r'l.l.c.~r~
res -t ra ~~'*- ~ -+ t...L -t ~ ~ 0 ~ e If,.,. -t-"'e 'S~ C.f.J"1'\ da r y
~+r.e!.>~S GiV"e '"'s:'7.,..~{ *'~"'-t.
20 21 22 tt ~s ~c...(u.d~cJ.. fl..i~t f-1.._e. mAc~~"'"eo( 'fi...eY'"wi.*14J.elf 23
'\S ~de4'-'~ -{-rr- ~ (.vd- e11e ~e\ cyc.Je.
24 25 26 27 28 29 30 31 32 33 34 37 38 L-------------------------------------------------------------------~~
Form 3650 10-91
A ftfl. ct:fV' ~ -
PAjt! rot" !;
\
I 1.
I I
NUCLEAR OPERATIONS DEPARTMENT Document Review Sheet
()Of umpnl T1114' .1 Docum*nt Number IRev1,1on Number 0
l ------ I n' ST Q.IJ t. Tu tU\ L EvAL.1JA*10.J Fon.... MQr ..a.1...lro T~rll.,.,owC't.L- Tf-0101 £t1- t=E:.S - '13-2'1? -o/ Page llpm Pag* and/or fllumbpr S*ct1on Number Comm*nts R*spons* or Resolution I P~<. c. 3 Jr fiAY f'3£ Wo Q. T"H ~ N-1 c.. l" Tc COM PA~r S7 G.R' 1:>SX
~'fe <I- , +k s 1: == 8. t-- fes; ~ ~ 0...
Tr:l S-. To Si-+owTt-4AT Tt-n:_ Tfof1C.K THre.ho~f'L..L. *
~~ev-ca..""t:-,,,e esr.- 1\1\ttt':b"' l>f- -+k...
prl!S.SL-t~ s~.s te~s -tl.,C\"' ~ .....
Y1Cl.C>S ~cro~c... IT Bue:.. ~t..C S.
'2. PAr.C 2. *1; S,ErhS ltHH'" A.:> ~SS 0 f'\ ~ , , 0.;:) Is M ,q &) c. -,-;;AT '"'"~ ~V-0..~12ol Tt1 c:. C..'< l..' ..Jorn_<.. TtH"l'lM o ~cl..\. } ,~ l:J."'l.1 g '{ f'"\M Cl~ I(,,
,, Ii ,,
~ P~~r 3 l'T Is No.,. . C'-'C' A a._ W "' rT ,., r ~ IS £ *frr"~I..) A 4.. \~ <:_c.~f>>~-t~
Pi?rssue c.. 0 fl E: 'I< '"TT R..JJ n "" P~r&.iu(Zc_ Si-eFcS J' 4 Pf\&£ 4 THr 11-\rttt-io l,.;) r~~ WA..S /..JSCll....T"C-J) I i.J'Tc> I H c. - ~"'
' '-"""[-* ~~rC2o(__
NO~':!LC MA..lvl-h.L.Y lJ 1'°'"1~ SohC. l Bl.>T NoT hvc..H)
!=' 0 IH. C Tt+C""-E ~ue r J
-Aa..Jy T.t f"t..ti/H.. £ v. PA~ 'I 0 ~
.STerssc-s FolL A S1...J<.ol.-C. ~v CL ~C.\.-C: l::'on_ ll-l1.S Uuc...T1L..C MAT ( ,_, IH.. ..s W-0 V\.-b @ C lcHJ~A IJ.. \...(' ,
R*~_-<J u A
~J IoNfr~t;n h ~ c/ S ID*t*~
Jo 2S/ CJ~ IJ~w Coort'J'34
.. C.*
~ D*t*
o- 2-t'" -'F3 IDocum*nt "'"M>' ~u' ~C, Dete to(r..s( ,~
~orm)l1~1
Pree No 9.11 TECHNICAL REYIElf CHECKLIST Athchment 5 Revision 5 EA - I= cs -9} -200-o/ REV. _D__ Page 1 of l
- This checklist provides guidance for the review of engineering analyses.
Answer questions Yes or No, or N/A if they do not apply. Document all cormtents on a 3110 Form. Satisfactory resolution of conments and completion of this checklist is noted by the Technically Reviewed signature on the Initiation and Review record block of For11 3619.
{Y, H, N/A)
- 1. Have the proper input codes, standards and design principles been specified?
- 2. Have the input codes, standards and design principles been properly applied? y
- 3. Are all inputs and assumptions valid and the basis for their use documented?
- 4. Is Vendor information used as input addressed correctly in the analysis? _ _Y_ __
- 5. If th* analysis argument departs frOll Vendor Inforllition/Recoaaendations, is the departure justification documented?
- 6. Are assumptions accurately described and reasonable?
8.
Has the use of engineering judgement been docU111nted and justified?
- Are all constants, variables and fon1Ulas correct and properly applied?
y
- 9. Have any *inor (insignificant) errors been identified? If yes; Identify on the 3110 Form ancl justify their Y
insignificance. (
- 10. Does analysis involve welding? .If Yes; verify the following infol"9ltion is accurately representld on the analysts drawing (OUtput docU111nt).
* * ** Betng Joinld .
* -
- s of Material Being Joined
- Loc1t10tt of Veld(s)
- Approprt1t1 Weld Symbology
- 11. Has the objective of th* analysis been ..t? y