Summary of 931012 Meeting W/Util Re Plant PORV safe-end Crack,Licensee Root Cause Analyses & Corrective Actions.List of Attendees Encl
ML18059A491
Person / Time
Site: Palisades Entergy icon.png
Issue date: 10/28/1993
From: Hsia A
Office of Nuclear Reactor Regulation
To:
Office of Nuclear Reactor Regulation
References
NUDOCS 9311080257
Download: ML18059A491 (3)


Text

SUBJECT:

S~MMARY OF MEETING HELD ON OCTOBER.12, 1993, WITH CONSUMERS POWER

-** -: COMPANY ON PALISADES PRESSURIZER SAFE-END CRACK

'- ~

  • ~

On OctOb,er '12, 1993, 111embers of 'the NRC staff met with representatives of Consumer~.Power Company (CPCo) and Combustion EnUineering Corporatiori to discuss *the recent Palisades pressurizer (PZR) power~operated relief valve (PORV) safe-end ~tack, the licensee's root cause*~nalyses~ and cor~ective.

actfons. lists the*meeting attendees. is*a copy of th.e ~materia 1 i presented by the 1 i censee. _

~

0

.' Th'e licensee ~escri bed in de fail the PZR PORV safe.:..end crack, *presented its

  • - r.,oot*cause *analysis,.. results of the non-destructive examination of the PORV safe* end, and the safe enqs associated w'ith the *safety/relief. valve, spray and
  • surge lines, proposed
  • n~pa ir, and long-term, corrective actions. The roQt cause analysis revealed that because Inconel 600 saf~.end is*a high ha~dness
  • and high yield stress material, combined with a*telatively low temperature post-forging.heat treatmeht, and an aggressive steam water envi~onmerit, it bec_ame vulnerable to primary. water stress corrosion.cracking.

' \\.:.

}.~

. ~

. ~

Pa 1 i sades.proposed to* rep 1 ace the *heat-affected zone of. the In cone l materi a 1

- (

' l in the safe end as atemporary repair for one cycle of operation. A permanent r~pair will b~ performed-durihg the 1995 refu~li~g out~ge. Visual inspectioris will be ~erfofmed foi the PZR heater sleeves,. temperature, and level sensor pen~tr~tions to look for potential leaka9es.

The staff i~ re~i~wing the doiketed lice~see report on.th~ PORV safe~end investigati9n and repair. *Also under review is the. licensee response to the requ*ests for additional information dated O.ctober 8, 1993*.. The cur.rent scheduled ~eactor.cri ti ca 1 i ty date is November '5,,. *19.93.

Enclosures:

1.

List of attendees

2.

Licensee materials

~cw/enclosures:*

See next a e OFC LA:PDIII-1

  • NAME*

DATE COPY ORIGINAL Original* signed by Anthony H. *Hsi a, Project Manager

  • Project Directorate III~l Division of Reactor Projects - III/IV/V Office of Nuclear Reacto~ Regulation NO PDOCS\\PALISADE\\PA1012MT.SUM 9311080257 931028:-/

PDR ADOCK 05000255 P

PDR.

11

~--~*.

f

  • -1 l *-*--:;e*~-,

Distribution: For summary of meeting held 10/12/93 w/encls. I &.2: *

. r:::-*ooc_k~J file.. -*

--NRC & Local PDRs

  • _ PDlll-1 Reading
  • A-: Hsi a-
  • B

~ Jorgens'en, *Reg*; on I I I

  • w/encl. 1 only:

,.,*, :'?.

. T. Murley /F. Miraglia

J. Partlow.

, * \\ *. J: Roe

\\~

  • ).

~.

,. J... *zwol inski

.:

  • W. M. Dean

.C. Jamerson

-"~

,* '*aGC

  • ~. ~ -

_.l.- '

!. Jordan, MNBB *3701 B. McCabe,

.17 G 21 J. Jacobson, Region III M. Parker, SRI at Palisades J. Strosnider, EMCB 7/D/4 W.

Koo~ EMC~ 7/D/4 Dated: October 28, 1993

,-1

~ *

~

Enclosure I NRC MEETING WITH PALISADES PZR PORV NOZZLE WELD CRACK

~october 12, 1993 NAME ORGANIZATION I.

A. H. Hsia NRC/NRR

2.

D. J. VandeWalle CPCo

3.
8. T. Lubin ABB-CENS
4.

P. D. Fitton CPCo

5.

D~ A. Bemis CPCo

6.

J. F. Hall ABB-CENS

7.

J. A. Zwolinski NRC/NRR

8.

B. W. Brown INEL

9.

M. Hum NRC/NRR/EMCB IO.

M. Anderson INEL*

11.

.J. A. Davis NRC/NRR/EMCB

12.

M. Banic.

NRC/NRR/EMCB

13.

G. Grant NRC/RIII/DRS

. 14.

W. H. Koo NRC/NRR/EMCB

15.
8. C. McCabe NRC/Regional Coard., EDO Office
16.

W. M. Dean NRC/NRR/Acting.PD

17.

J. Partlow.

  • . NRC /NRR/ ADP
18.

L. B. Marsh NRC/DRPW/PDIII-1

19.

J. Strosnider NRC/NRR/EMCB

20.

R. Orosz CPCo

20.

G. Slade CPCo

21.

D. Rogers CPCo

22.
8. Vanwagner CPCo