SUBJECT:
S~MMARY OF MEETING HELD ON OCTOBER.12, 1993, WITH CONSUMERS POWER
-** -: COMPANY ON PALISADES PRESSURIZER SAFE-END CRACK
'- ~
- ~
On OctOb,er '12, 1993, 111embers of 'the NRC staff met with representatives of Consumer~.Power Company (CPCo) and Combustion EnUineering Corporatiori to discuss *the recent Palisades pressurizer (PZR) power~operated relief valve (PORV) safe-end ~tack, the licensee's root cause*~nalyses~ and cor~ective.
- actfons. lists the*meeting attendees. is*a copy of th.e ~materia 1 i presented by the 1 i censee. _
~
0
.' Th'e licensee ~escri bed in de fail the PZR PORV safe.:..end crack, *presented its
- - r.,oot*cause *analysis,.. results of the non-destructive examination of the PORV safe* end, and the safe enqs associated w'ith the *safety/relief. valve, spray and
- surge lines, proposed
- n~pa ir, and long-term, corrective actions. The roQt cause analysis revealed that because Inconel 600 saf~.end is*a high ha~dness
- and high yield stress material, combined with a*telatively low temperature post-forging.heat treatmeht, and an aggressive steam water envi~onmerit, it bec_ame vulnerable to primary. water stress corrosion.cracking.
' \\.:.
}.~
. ~
. ~
Pa 1 i sades.proposed to* rep 1 ace the *heat-affected zone of. the In cone l materi a 1
- (
' l in the safe end as atemporary repair for one cycle of operation. A permanent r~pair will b~ performed-durihg the 1995 refu~li~g out~ge. Visual inspectioris will be ~erfofmed foi the PZR heater sleeves,. temperature, and level sensor pen~tr~tions to look for potential leaka9es.
The staff i~ re~i~wing the doiketed lice~see report on.th~ PORV safe~end investigati9n and repair. *Also under review is the. licensee response to the requ*ests for additional information dated O.ctober 8, 1993*.. The cur.rent scheduled ~eactor.cri ti ca 1 i ty date is November '5,,. *19.93.
Enclosures:
- 1.
List of attendees
- 2.
Licensee materials
~cw/enclosures:*
See next a e OFC LA:PDIII-1
- NAME*
DATE COPY ORIGINAL Original* signed by Anthony H. *Hsi a, Project Manager
- Project Directorate III~l Division of Reactor Projects - III/IV/V Office of Nuclear Reacto~ Regulation NO PDOCS\\PALISADE\\PA1012MT.SUM 9311080257 931028:-/
PDR ADOCK 05000255 P
PDR.
11
~--~*.
f
- -1 l *-*--:;e*~-,
Distribution: For summary of meeting held 10/12/93 w/encls. I &.2: *
. r:::-*ooc_k~J file.. -*
--NRC & Local PDRs
- _ PDlll-1 Reading
- A-: Hsi a-
- B
~ Jorgens'en, *Reg*; on I I I
- w/encl. 1 only:
,.,*, :'?.
. T. Murley /F. Miraglia
- J. Partlow.
, * \\ *. J: Roe
\\~
- ).
~.
,. J... *zwol inski
.:
- W. M. Dean
.C. Jamerson
-"~
,* '*aGC
- ~. ~ -
_.l.- '
!. Jordan, MNBB *3701 B. McCabe,
.17 G 21 J. Jacobson, Region III M. Parker, SRI at Palisades J. Strosnider, EMCB 7/D/4 W.
Koo~ EMC~ 7/D/4 Dated: October 28, 1993
,-1
~ *
~
Enclosure I NRC MEETING WITH PALISADES PZR PORV NOZZLE WELD CRACK
~october 12, 1993 NAME ORGANIZATION I.
A. H. Hsia NRC/NRR
- 2.
D. J. VandeWalle CPCo
- 3.
- 8. T. Lubin ABB-CENS
- 4.
P. D. Fitton CPCo
- 5.
D~ A. Bemis CPCo
- 6.
J. F. Hall ABB-CENS
- 7.
J. A. Zwolinski NRC/NRR
- 8.
B. W. Brown INEL
- 9.
M. Hum NRC/NRR/EMCB IO.
M. Anderson INEL*
- 11.
.J. A. Davis NRC/NRR/EMCB
- 12.
M. Banic.
NRC/NRR/EMCB
- 13.
G. Grant NRC/RIII/DRS
. 14.
W. H. Koo NRC/NRR/EMCB
- 15.
- 8. C. McCabe NRC/Regional Coard., EDO Office
- 16.
W. M. Dean NRC/NRR/Acting.PD
- 17.
J. Partlow.
- . NRC /NRR/ ADP
- 18.
L. B. Marsh NRC/DRPW/PDIII-1
- 19.
J. Strosnider NRC/NRR/EMCB
- 20.
R. Orosz CPCo
- 20.
G. Slade CPCo
- 21.
D. Rogers CPCo
- 22.
- 8. Vanwagner CPCo