Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20209C009 + (23:34:30, 6 December 2024)
- ML20209C004 + (23:34:31, 6 December 2024)
- ML20209C005 + (23:34:31, 6 December 2024)
- ML20209B999 + (23:34:32, 6 December 2024)
- ML20209B997 + (23:34:33, 6 December 2024)
- ML20209B994 + (23:34:34, 6 December 2024)
- ML20209B989 + (23:34:35, 6 December 2024)
- ML20209B992 + (23:34:35, 6 December 2024)
- ML20209B987 + (23:34:37, 6 December 2024)
- ML20209B986 + (23:34:38, 6 December 2024)
- ML20209B983 + (23:34:38, 6 December 2024)
- ML20209B980 + (23:34:39, 6 December 2024)
- ML20209B981 + (23:34:39, 6 December 2024)
- ML20209B979 + (23:34:40, 6 December 2024)
- ML20209B978 + (23:34:42, 6 December 2024)
- ML20209B977 + (23:34:42, 6 December 2024)
- ML20209B974 + (23:34:47, 6 December 2024)
- 05000352/LER-1999-004-01, :on 990606,ADS Was Inoperable During Planned Maint & Applicable TS Was Not Met.Caused by Inadequate Review Operability Requirements.Clearance Was Removed from Backup ADS Gas Bottles & Sys Was Returned to Service + (23:34:49, 6 December 2024)
- ML20209B970 + (23:34:50, 6 December 2024)
- ML20209B971 + (23:34:50, 6 December 2024)
- ML20209B969 + (23:34:51, 6 December 2024)
- ML20209B968 + (23:34:52, 6 December 2024)
- ML20209B966 + (23:34:55, 6 December 2024)
- ML20209B964 + (23:34:56, 6 December 2024)
- ML20209B963 + (23:34:56, 6 December 2024)
- ML20209B962 + (23:34:57, 6 December 2024)
- ML20209B960 + (23:35:05, 6 December 2024)
- 05000352/LER-1999-004, Forwards LER 99-004-00,re Inoperability of Automatic Depressurization Sys Portion of Eccs.Condition Resulted from Incomplete Impact Review of Isolating Portion of ADS Nitrogen Backup Supply on Operability of ECCS Sys + (23:35:06, 6 December 2024)
- ML20209B958 + (23:35:06, 6 December 2024)
- ML20209B953 + (23:35:07, 6 December 2024)
- ML20209B952 + (23:35:07, 6 December 2024)
- ML20209B949 + (23:35:08, 6 December 2024)
- PNO-III-86-087, on 860827,plant Shut Down Due to Equipment Problems Resulting in Inoperable HPCI Sys & Train B of Core Spray Sys.Addl Problems Identified During Shutdown.Repairs Underway + (23:35:09, 6 December 2024)
- PNO-III-99-034A, on 990702,all Criticality Accident Alarms Administratively Declared Inoperable.Criticality Accident Alarms Administratively Was Declared Inoperable After Engineering Plant Staff,During Review of Calculations + (23:35:09, 6 December 2024)
- ML20209B946 + (23:35:10, 6 December 2024)
- ML20209B944 + (23:35:17, 6 December 2024)
- ML20209B943 + (23:35:17, 6 December 2024)
- ML20209B939 + (23:35:18, 6 December 2024)
- ML20209B941 + (23:35:18, 6 December 2024)
- PNO-I-99-030, on 990630,licensee Notified NRC Region I That Shipping Container Loaded with Internally Contaminated Vacuum Cleaning Device,Used at Maine Yankee for Asbestos Removal,Was Damaged.No Radioactive Matl Was Released + (23:35:19, 6 December 2024)
- ML20209B933 + (23:35:25, 6 December 2024)
- LD-99-039, Part 21 Rept Re Defect of ABB 1200A 4kV Vacuum Breakers. Initially Reported on 990625.Defect Results in Breaker Failing to Remain in Closed Position.Root Cause Evaluation & Corrective Action Plan Being Developed.Licensee Notified + (23:35:27, 6 December 2024)
- ML20209B932 + (23:35:27, 6 December 2024)
- ML20209B930 + (23:35:30, 6 December 2024)
- ML20209B926 + (23:35:37, 6 December 2024)
- ML20209B923 + (23:35:43, 6 December 2024)
- ML20209B921 + (23:35:44, 6 December 2024)
- ML20209B920 + (23:35:45, 6 December 2024)
- ML20209B917 + (23:35:51, 6 December 2024)
- ST-HL-AE-2093, Forwards Revised FSAR Section 3.12, Conformance W/Nrc Reg Guides. Section Updated to Reflect Util Position on All Applicable Reg Guides + (23:35:52, 6 December 2024)
- ML20209B914 + (23:35:53, 6 December 2024)