Submits Results of Testing on Positive Displacement Pump & Valve 1-HV-3258 of post-accident Sampling Sys.Pump Placed in Svc & Valve Replaced.Testing for Leakage from Primary Coolant Sources Complete.No Addl Leakage Noted
ML20209B926
Person / Time
Site: Vogtle Southern Nuclear icon.png
Issue date: 04/20/1987
From: Gucwa L
GEORGIA POWER CO.
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
RTR-NUREG-0737, RTR-NUREG-737, TASK-3.D.1.1, TASK-TM SL-2376, NUDOCS 8704280546
Download: ML20209B926 (2)


Text

Georgia Fbwer Company n

333 Piedrnont Avenue Atlanta, Georgia 30308 Telephone 404 526-6526 Mathng Address:

Post Off.ce Box 4545 Atlanta, Georgia 30302 L

Georgia Power L T. Gucwa N Al' + m P" l/ C O Me""

Manager Nuclear Safety and Licensing SL-2376 0242m X7GJ17-V200 April 20,1987 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C.

20555 NRC DOCKET 50-424 OPERATING LICENSE NPF-68 V0GTLE ELECTRIC GENERATING PLANT UNIT 1 RESULTS OF EXAMINATION FOR POTENTIAL LEAKAGE OUTSIDE CONTAINMENT Gentlemen:

By letter dated !! arch 9,

1987 (SL-2109) Georgia Power Company submitted resul ts of an examination for potential leakage outside containment pursuant to Item III.D.l.1 of NUREG-0737 and Low-Power License Condition (8)a.

It was stated in that letter that a supplemental report would be submitted following the completion of testing on the Positive Displacement (PD)

Pump and on valve 1-HV-3258 of the Post-Accident Sample System.

That testing has been completed and the results are as follows.

The PD pump has been placed in service and no leakage has been detected from the PD pump or any of the associated components excluded from the Chemical and Volume Control System in the original report.

Valve 1-HV-3258 has been replaced and no leakage has been detected through either the seat or packing.

lesting for leakage from primary coolant sources outside containment has now been completed and no additional leakage has been noted.

The values reported in our March 9,1987 letter are the final leakage figures for the leakage assessment prograa.

Please contact this office if you have any questions.

Sincerely, WY & ^

L. T. Gucwa JH/lm

,0 8704280546 870420 PDR ADOCK 05000424 i

0 P

PDR

~

4 Cicorgia Ptnver adbL l

1

)

U. S. Nuclear Regulatory Commission April 20,1987 i

Page Two c: Georgia Power Company Mr. R. E. Conway Mr. J. P. O'Reilly Mr. G. Bockhold, Jr.

Mr. J. F. D' Amico Mr. C. W. Hayes G0-NORMS Southern Company Services l

Mr. R. A. Thomas Mr. J. A. Bailey Shaw, Pittman, Potts & Trowbridge Mr. B. W. Churchill, Attorney-at-Law I

Troutman, Sanders, Lockerman & Ashmore Mr. A. H. Domby, Attorney-at-Law U. S. Nuclear Regulatory Commission Dr. J. N. Grace, Regional Administrator Ms. M. A. Miller, Licensing Project Manager, NRR (2 copies)

Mr. J. F. Rogge, Senior Resident Inspector-Operations, Vogtle Georgians Against Nuclear Energy Mr. D. Feig Ms. C. Stangler i

1 i

0242m i

rwns

,