Ack Receipt of 870402 Response to NRC Re Violations Noted in Insp Rept 50-267/87-05
ML20209B930
Person / Time
Site: Fort Saint Vrain Xcel Energy icon.png
Issue date: 04/22/1987
From: Gagliardo J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Robert Williams
PUBLIC SERVICE CO. OF COLORADO
References
NUDOCS 8704280547
Download: ML20209B930 (1)


See also: IR 05000267/1987005

Text

.

e

APR 2 21937

'

In Reply Refer To:

Docket: 50-267/87-05

Public Service Company of Colorado

ATTN: Robert 0. Williams, Jr.

Vice President, Nuclear Operations

P. O. Box 840

Denver, Colorado

80201-0840

Gentlemen:

Thank you for your letter of April 2,1987, in response to our letter and

Notice of Violation dated March 16, 1987. We have reviewed your reply and find it

,

responsive to the concerns raised in our Notice of Violation. We will review

the implementation of your corrective actions during a future inspection to

determine that full compliance has been achieved and will be maintained.

Sincerely,

Odg!r:::t Sicned By

J. E. Gca:!ardo

J. E. Gagliardo, Chief

!*

Reactor Projects Branch

cc:

Manager, Nuclear Production Division

Fort St. Vrain Nuclear Station

16805 WCR 191

Platteville, Colorado

80651

P. Tomlinson, Manager, Quality

Assurance Division

(sameaddress)

Colorado Radiation Control Program Director

Colorado Public Utilities Commission

8704280547 870422

bec to DMB (IE01)

$

bec distrib. by PIV:

RPB

DRS?

RRI

R. D. Martin, RA

'

SectionChief(RPB/A)

RSB

i

SectionChief(RSB/ES)

Project Inspector

R&SPB

D. Weiss, RM/ALF

MIS System

R. Hall

4

RSTS Operator

RIV File

k

PI

C:RP

C:RPB

  1. ESkowd)

'

JPJa

JEGag :1 rdo

D'n

l'""

.-

-

_

-

..

.

-

-

""

!

.

- ---

/.

,

.

.

i

s

Public Service ~

- me

Company of Colorado

16805 WCR 19 1/2, Platteville, Colorado 80651

April 2, 1987

Fort St. Vrain

Unit No. 1

P-87139

Nuclear Regulatory Commission

Washington, C.C.

20555

Attention:

Document Control Desk

Docket No. 50-267

, n . m m ...

"un:JL

SUBJECT:

I & E Inspection Report

'::: ':t:JL

87-05

.

.?.::.:'.J f.r., Jai'

. . .

i:'i.uit:: J"JI!"

REFERENCE:

NRC Letter, Gagliardo

I:/"4J'4"e.ema

to Williams, dated

b b$t$hau

3/16/87,(G-87081)

-7 m

PJ::!.'i"!, '

f

!":"J::"!2 '"*"' "'

Dear Mr Sirs:

g";M',"-yu.,inui

": Linn =0;*'

This letter is in response to the Notice of Violation received as a

[$39;$3;cmn

result of insoections conducted at Fort St. Vrain during the period

P:n;";;cg',

of February

1-28,

1937.

The following response to the items

..,ygg;ugge,,,,

contained in the Notice of Violation is hereby submitted:

i.:.0M." 'ic"J".*4., t ... .."'

Failure to follow Admimistrative Procedure 0-15:

...

.a c--

m. .. , ...

i e e>

Criterion V of Appendix B to 10 CFR Part 50 states, in part,

" Activities affecting quality shall

be prescriced oy documented

instructions, procedures, or crawings, of a type appropriate to the

circumstances anc snall be accomplisned in accordance with these

instructions, procedures, or drawings."

The licensee's quality

assurance program as cocumented in FSAR, Appendix

B,

paragrapn

B.5.5.2, states, in part, "All safety-related maintenance, inspection

and surveillance activities are performed to procedures authorized

under controls im::osed by the FSV Aaministrative Procedure Manual ."

Aaministrative Procedure 0-15, Issue

6,

" Control

of Nonconforming

Items,"

in paragraph

4.1.2b,

states, "For nonconforming items

affecting plant ocerations cuality control snall:

r.oncur with the

shift supervisor on olacement of the hold tag."

4F/+t4Hwby

z@\\

9

.

. .__

l

,

.

.

!

P-87139

-2-

April 2, 1987

Contrary to all

of the above, Hold Tag 87-042 was placed on

Electrical Cabinet I-9366 on February. 15,

1987, without obtaining

concurrence of the shift supervisor.

The equipment involved did

effect plant operations.

(1) The reason for the violation:

The procedure requirement is vague in that it does not provide

for acknowledgement by the Shift Supervisor nor does it indicate

when the shift supervisor is to be notified of a nonconforming

condition associated with plant equipment.

'

(2) The corrective steps which have been taken and the results

achieved:

A procedure change was initiated by PDR 87-1299 and PORC approved

on March 3, 1987, which clarifies the requirement for informing

1

the

Shift Supervisor and obtaining his acknowledgement by

signature of all NCR's written against plant equipment.

Administrative Procedure Q-15 now states:

For nonconforming items affecting plant equipment operations

Quality Control shall;

a)

Obtain the signature of the Shift Supervisor after the

NCR has received a number and prior to the NCR being

,

,,

dispositioned.

b)

Concur with the Shift Supervisor on placement of the

hold tag.

The Shift Supervisor shall initial the hold

tag which indicates he is aware of the hold status of

the equipment.

c)

It is the responsibility of the Shift Supervisor to

contact Technical Services.for an operability review in

accordance with the Technical Specifications for the

item on hold.

'

d)

In the case where an operability review determines that

a component is allowed to operate, QC shall identify on

the

hold

tag

"May

operate in accordance with

operability review."

(3) The corrective steps which will

be taken to avoid further

violations.

POR-87-1299 is a permanent change to Administrative Procedure

0-15.

The centinued implementation of POR-87-1299 will

prevent

re-occurrence of this situation.

_ _ _ , _

. . -

,

..

. , _ _ . , _ _ _ _ _ _

_ _

. . . -

_ __.

- , - _ _

, . . - .

_ - _

!...,

. l.

P-87139

-3-

April 2, 1987

.

'

(4) The date when full compliance will be achieved.

Compliance was achieved on March

3,

1987 with the procedure

change to Q-15 by POR 87-1299.

Should you have any further auestions please contact Mr. M. H. Holmes

at (303) 480-6960

Sincerely,

Rb 1

-

cy

,

P. F. Tomlinson

Manager, Quality Assurance

Fort St. Vrain Nuclear

Generating Station

PFT/TCP:gim

cc: Regional Administrator, Region IV

Attention:

Mr. J. E. Gagliardo, Chief

Reactor Projects Branch

Mr. R. E. Farrel

Senior Resident Inspector

Fort-St. Vrain

..

Y

I

__

__ - ___

_ _ __ ____________________ _____________

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ _ _ _ _ _ _

_______________________L