e
APR 2 21937
'
In Reply Refer To:
Docket: 50-267/87-05
Public Service Company of Colorado
ATTN: Robert 0. Williams, Jr.
Vice President, Nuclear Operations
P. O. Box 840
Denver, Colorado
80201-0840
Gentlemen:
Thank you for your letter of April 2,1987, in response to our letter and
Notice of Violation dated March 16, 1987. We have reviewed your reply and find it
,
responsive to the concerns raised in our Notice of Violation. We will review
the implementation of your corrective actions during a future inspection to
determine that full compliance has been achieved and will be maintained.
Sincerely,
Odg!r:::t Sicned By
J. E. Gca:!ardo
J. E. Gagliardo, Chief
!*
Reactor Projects Branch
cc:
Manager, Nuclear Production Division
Fort St. Vrain Nuclear Station
16805 WCR 191
Platteville, Colorado
80651
P. Tomlinson, Manager, Quality
Assurance Division
(sameaddress)
Colorado Radiation Control Program Director
Colorado Public Utilities Commission
8704280547 870422
bec to DMB (IE01)
$
bec distrib. by PIV:
RPB
DRS?
RRI
R. D. Martin, RA
'
SectionChief(RPB/A)
RSB
i
SectionChief(RSB/ES)
Project Inspector
R&SPB
D. Weiss, RM/ALF
MIS System
R. Hall
4
RSTS Operator
RIV File
k
C:RP
C:RPB
- ESkowd)
'
JPJa
JEGag :1 rdo
D'n
l'""
.-
-
_
-
..
.
-
-
""
!
.
- ---
/.
,
.
.
i
s
Public Service ~
- me
Company of Colorado
16805 WCR 19 1/2, Platteville, Colorado 80651
April 2, 1987
Fort St. Vrain
Unit No. 1
P-87139
Nuclear Regulatory Commission
Washington, C.C.
20555
Attention:
Document Control Desk
Docket No. 50-267
, n . m m ...
- "un:JL
SUBJECT:
I & E Inspection Report
'::: ':t:JL
87-05
.
- .?.::.:'.J f.r., Jai'
. . .
i:'i.uit:: J"JI!"
REFERENCE:
NRC Letter, Gagliardo
I:/"4J'4"e.ema
to Williams, dated
b b$t$hau
3/16/87,(G-87081)
-7 m
- PJ::!.'i"!, '
f
!":"J::"!2 '"*"' "'
Dear Mr Sirs:
g";M',"-yu.,inui
": Linn =0;*'
This letter is in response to the Notice of Violation received as a
[$39;$3;cmn
result of insoections conducted at Fort St. Vrain during the period
- P:n;";;cg',
of February
1-28,
1937.
The following response to the items
..,ygg;ugge,,,,
contained in the Notice of Violation is hereby submitted:
i.:.0M." 'ic"J".*4., t ... .."'
Failure to follow Admimistrative Procedure 0-15:
...
.a c--
m. .. , ...
i e e>
Criterion V of Appendix B to 10 CFR Part 50 states, in part,
" Activities affecting quality shall
be prescriced oy documented
instructions, procedures, or crawings, of a type appropriate to the
circumstances anc snall be accomplisned in accordance with these
instructions, procedures, or drawings."
The licensee's quality
assurance program as cocumented in FSAR, Appendix
B,
paragrapn
B.5.5.2, states, in part, "All safety-related maintenance, inspection
and surveillance activities are performed to procedures authorized
under controls im::osed by the FSV Aaministrative Procedure Manual ."
Aaministrative Procedure 0-15, Issue
6,
" Control
of Nonconforming
Items,"
in paragraph
4.1.2b,
states, "For nonconforming items
affecting plant ocerations cuality control snall:
r.oncur with the
shift supervisor on olacement of the hold tag."
4F/+t4Hwby
z@\\
9
.
. .__
l
,
.
.
!
P-87139
-2-
April 2, 1987
Contrary to all
of the above, Hold Tag 87-042 was placed on
Electrical Cabinet I-9366 on February. 15,
1987, without obtaining
concurrence of the shift supervisor.
The equipment involved did
effect plant operations.
(1) The reason for the violation:
The procedure requirement is vague in that it does not provide
for acknowledgement by the Shift Supervisor nor does it indicate
when the shift supervisor is to be notified of a nonconforming
condition associated with plant equipment.
'
(2) The corrective steps which have been taken and the results
achieved:
A procedure change was initiated by PDR 87-1299 and PORC approved
on March 3, 1987, which clarifies the requirement for informing
1
the
Shift Supervisor and obtaining his acknowledgement by
signature of all NCR's written against plant equipment.
Administrative Procedure Q-15 now states:
For nonconforming items affecting plant equipment operations
Quality Control shall;
a)
Obtain the signature of the Shift Supervisor after the
NCR has received a number and prior to the NCR being
,
,,
dispositioned.
b)
Concur with the Shift Supervisor on placement of the
hold tag.
The Shift Supervisor shall initial the hold
tag which indicates he is aware of the hold status of
the equipment.
c)
It is the responsibility of the Shift Supervisor to
contact Technical Services.for an operability review in
accordance with the Technical Specifications for the
item on hold.
'
d)
In the case where an operability review determines that
a component is allowed to operate, QC shall identify on
the
hold
tag
"May
operate in accordance with
operability review."
(3) The corrective steps which will
be taken to avoid further
violations.
POR-87-1299 is a permanent change to Administrative Procedure
0-15.
The centinued implementation of POR-87-1299 will
prevent
re-occurrence of this situation.
_ _ _ , _
. . -
,
..
. , _ _ . , _ _ _ _ _ _
_ _
. . . -
_ __.
- , - _ _
, . . - .
_ - _
!...,
. l.
P-87139
-3-
April 2, 1987
.
'
(4) The date when full compliance will be achieved.
Compliance was achieved on March
3,
1987 with the procedure
change to Q-15 by POR 87-1299.
Should you have any further auestions please contact Mr. M. H. Holmes
at (303) 480-6960
Sincerely,
Rb 1
-
cy
,
P. F. Tomlinson
Manager, Quality Assurance
Fort St. Vrain Nuclear
Generating Station
PFT/TCP:gim
cc: Regional Administrator, Region IV
Attention:
Mr. J. E. Gagliardo, Chief
Reactor Projects Branch
Mr. R. E. Farrel
Senior Resident Inspector
Fort-St. Vrain
..