Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20210R328 + (06:31:14, 6 December 2024)
- ML20210R326 + (06:31:15, 6 December 2024)
- IR 05000298/1997014 + (06:31:16, 6 December 2024)
- ML20210R321 + (06:31:17, 6 December 2024)
- ML20210R313 + (06:31:18, 6 December 2024)
- W3P86-3328, Boric Acid Concentration Reduction Effort,Technical Bases & Operational Analysis,Waterford Nuclear Power Plant Unit 3 + (06:31:18, 6 December 2024)
- ML20210R312 + (06:31:19, 6 December 2024)
- ML20210R311 + (06:31:20, 6 December 2024)
- ML20210R308 + (06:31:21, 6 December 2024)
- W3P87-0535, Monthly Operating Rept for Jan 1987 + (06:31:21, 6 December 2024)
- ML20210R305 + (06:31:22, 6 December 2024)
- ML20210R304 + (06:31:23, 6 December 2024)
- 05000336/LER-1997-026-02, :on 970729,invalid ESAS Actuation Occurred While Shifting from Normal to Reserve Station Transformers. Caused by Inadequate Review of Components.Briefed Operations Personnel Re Need to Analyze Equipment + (06:31:24, 6 December 2024)
- ML20210R295 + (06:31:25, 6 December 2024)
- ML20210R294 + (06:31:26, 6 December 2024)
- 05000336/LER-1997-026, Forwards LER 97-026-00,documenting Event That Occurred at Facility on 970729.Commitments Made within Ltr,Listed + (06:31:27, 6 December 2024)
- ML20210R289 + (06:31:28, 6 December 2024)
- ML20210R286 + (06:31:30, 6 December 2024)
- ML20210R285 + (06:31:31, 6 December 2024)
- ML20210R284 + (06:31:32, 6 December 2024)
- ML20210R281 + (06:31:33, 6 December 2024)
- IR 05000275/1987003 + (06:31:37, 6 December 2024)
- ML20210R278 + (06:31:37, 6 December 2024)
- ML20210R277 + (06:31:38, 6 December 2024)
- ML20210R276 + (06:31:39, 6 December 2024)
- ML20210R275 + (06:31:40, 6 December 2024)
- 05000483/LER-1997-007, :on 970725,main Steam Safety Valve Setpoint Drift Was Outside Design Basis Requirements.Caused by Setpoint Drift or Variance.Valves Were Either Tested Satisfactorily,Reset or Reworked + (06:31:41, 6 December 2024)
- JAFP-87-0131, Monthly Operating Rept for Jan 1987 + (06:31:42, 6 December 2024)
- ML20210R272 + (06:31:43, 6 December 2024)
- ML20210R270 + (06:31:47, 6 December 2024)
- ML20210R268 + (06:31:49, 6 December 2024)
- ML20210R269 + (06:31:49, 6 December 2024)
- ML20210R267 + (06:31:50, 6 December 2024)
- ML20210R266 + (06:31:50, 6 December 2024)
- ML20210R264 + (06:31:51, 6 December 2024)
- PY-CEI-NRR-2204, Forwards fitness-for-duty Program Performance Rept for Period Jan-June 1997 + (06:31:51, 6 December 2024)
- ML20210R259 + (06:31:52, 6 December 2024)
- ML20210R257 + (06:31:53, 6 December 2024)
- ML20210R258 + (06:31:53, 6 December 2024)
- ML20210R256 + (06:31:55, 6 December 2024)
- ML20210R250 + (06:31:56, 6 December 2024)
- IR 05000445/1999010 + (06:32:55, 6 December 2024)
- ML20210R242 + (06:32:57, 6 December 2024)
- ML20210R241 + (06:32:57, 6 December 2024)
- B12199, Forwards Reviews of Isap Topics 2.09,2.11 & 2.12 Re Reactor Coolant Pump Vibration Monitoring Sys Upgrade, Main Steam Sys Evaluation & Turbine Generator Trip Logic, Respectively,Per 850731 Request + (06:32:58, 6 December 2024)
- JAFP-97-0303, Forwards Ja FitzPatrick Nuclear Power Plant Effluent & Waste Disposal Semi-Annual Rept,Jan-June 1997. Rept Submitted in Accordance W/Requirements of Amend 93,App B, Section 7.3.C of Ja FitzPatrick Nuclear Power Plant TS + (06:32:59, 6 December 2024)
- ML20210R234 + (06:32:59, 6 December 2024)
- ML20210R230 + (06:33:00, 6 December 2024)
- ML20210R231 + (06:33:00, 6 December 2024)
- ML20210R229 + (06:33:01, 6 December 2024)
- ML20210R225 + (06:33:04, 6 December 2024)