Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20212E324 + (11:29:17, 4 December 2024)
- ML20212E321 + (11:29:18, 4 December 2024)
- ML20212E322 + (11:29:18, 4 December 2024)
- ML20212E320 + (11:29:19, 4 December 2024)
- ML20212E317 + (11:29:24, 4 December 2024)
- ML20212E316 + (11:29:25, 4 December 2024)
- ML20212E313 + (11:29:26, 4 December 2024)
- PNO-II-87-080, on 871209,plant Unit 2 Manually Shut Down from 33% Power to Repair Leak Believed to Be in 6 Inch Pipe to Elbow Weld.Plant Being Placed in Cold Shutdown for Repair. Licensee Anticipates 5 to 10 Day Outage + (11:29:26, 4 December 2024)
- RBG-25392, Supplemental Response to NRC Re Violations Noted in Insp Rept 50-458/86-40.Corrective Actions:Temporary Change Notice 86-1947 Issued on 861223 to Change Step 7.4.29 Into Two Separate Steps & Rev 2 to STP-209-0302 Issued + (11:29:27, 4 December 2024)
- ML20212E309 + (11:29:28, 4 December 2024)
- PNO-III-87-029, on 870126,six of Twelve ROs & SROs Failed Requalification Exam.Operators Who Failed Exam Removed from Licensed Operating Activities + (11:29:28, 4 December 2024)
- PNO-III-87-134, on 871015,w/unit Cold Shutdown for Maint, Operators Tripped Operating Shutdown Coolant Pump in Response to Alarms & Indications of Fluctuation Pressure within Pump + (11:29:29, 4 December 2024)
- ML20212E304 + (11:29:30, 4 December 2024)
- SNRC-1317, Annual Operating Rept,Jan-Dec 1986 + (11:29:30, 4 December 2024)
- ML20212E301 + (11:29:31, 4 December 2024)
- ML20212E298 + (11:29:32, 4 December 2024)
- ML20212E296 + (11:29:33, 4 December 2024)
- PNO-I-87-026, on 870331,NRC Issued Order Suspending Power Operation Effective Immediately.Unit 3 Began Controlled Shutdown from 100% Reactor Power.Unit 2 in Scheduled Refueling Outage:Core Offload in Progress & 50% Complete + (11:29:33, 4 December 2024)
- PNO-I-87-104A, on 871108,normally Locked High Radiation Barrier Leading to Refueling Floor Was Found W/Locking Mechanism Taped Over.Info Serves as Update to PNO-I-87-104, Discussing Licensee Decision to Stop Work at Plant + (11:29:34, 4 December 2024)
- ML20212E287 + (11:29:35, 4 December 2024)
- IR 05000456/1986063 + (11:29:44, 4 December 2024)
- ML20212E285 + (11:29:45, 4 December 2024)
- PNO-III-87-082, on 870616,licensee Declared Unusual Event After Concluding That Problems W/Electric Ground Fault Protection Sys Could Result in Common Mode Failure.Licensee Installed 14 Jumpers Around Questionable Detection Devices + (11:29:45, 4 December 2024)
- ML20212E280 + (11:29:46, 4 December 2024)
- ML20212E279 + (11:29:47, 4 December 2024)
- PNO-III-87-114, on 871120,licensee Elected to Shutdown from Full Power to Cold Shutdown Conditions to Perform Top Assembly Replacement of Reactor Depressurization Sys Valves Exhibiting Excessive Polot Valve Leakage Since 871114 + (11:29:47, 4 December 2024)
- ML20212E274 + (11:29:48, 4 December 2024)
- PNO-II-87-016, on 870309,Vogtle Unit 1 Achieved Initial Criticality.Nrc Senior Resident Inspector & Region II Specialist Were Present.All Parameters Were Reported to Be Near Anticipated Values + (11:29:48, 4 December 2024)
- IR 05000458/1986035 + (11:29:49, 4 December 2024)
- PNO-I-87-108, on 871118,FBI Arrested 6 Individuals,Accused of Drug Distribution at Peach Bottom Power Station & Surrounding York County Area + (11:29:50, 4 December 2024)
- 05000298/LER-1987-008, :on 870127,reactor Bldg Ventilation Exhaust Radiation Monitor Tripped Causing Group VI Isolation.Caused by Personnel Error Due to Poor Communications & Procedural Deficiencies.Technician Counseled + (11:29:52, 4 December 2024)
- ML20212E268 + (11:29:53, 4 December 2024)
- PNO-III-87-150, on 871209,licensee Reported to Region III That 3 Mci of I-125 Labelled Morphine Used for Research Purposes,Could Not Be Located.Licensee Will Submit 30 Day Rept W/Results of Investigation + (11:29:53, 4 December 2024)
- PNO-II-87-067, on 871001,contaminated Dry Storage Mockup Canister Was Sent to Offsite Vendor for Machining.Licensee Believes Canister Became Contaminated After Being Attached to Contaminated Drainage Sys.State of Sc Informed + (11:29:54, 4 December 2024)
- ML20212E264 + (11:29:55, 4 December 2024)
- ML20212E261 + (11:29:56, 4 December 2024)
- ML20212E260 + (11:29:56, 4 December 2024)
- PNO-III-87-085, on 870620,while Reducing Power for Governor Valve Test on Main Turbine,Turbine Was Taken Off Line After Discovery of electro-hydraulic Control Fluid Leak on 4 Governor Valve + (11:29:57, 4 December 2024)
- ML20212E256 + (11:29:58, 4 December 2024)
- ML20212E255 + (11:29:59, 4 December 2024)
- PNO-II-87-078, on 871126,licensee Removed Unit 1 from Svc to Repair Leaking Manway Cover on Secondary Side of C Steam Generator.Unit Cooled Down & Manway Gasket Replaced. Commonwealth of Virginia Informed + (11:29:59, 4 December 2024)
- ML20212E253 + (11:30:00, 4 December 2024)
- AECM-87-0047, Annual Operating Rept for 1986 + (11:30:01, 4 December 2024)
- PNO-III-87-083A, on 870617,while Operating at 29% Power During Reactor Recirculation Test,Recirculation Pumps Tripped & Natural Circulation Established.Ait Being Sent to Site.Corrected Version of PNO-III-87-083 + (11:30:01, 4 December 2024)
- PNO-V-87-085, on 871231,Region V Ofc Notified by NRC Resident Ofc at Washington Public Power Supply Reactor Site That Tractor Trailer Vehicle Had Overturned on Steven Highway Outside Richland,Wa.State of Wa Notified + (11:30:29, 4 December 2024)
- ML20212E244 + (11:30:30, 4 December 2024)
- ML20212E243 + (11:30:31, 4 December 2024)
- PNO-III-87-086, on 870623,licensee Declared Alert When Smoke Was Discovered in Outside Containment Cable Penetration Area.Although Outside Assistance Was Not Required,Fire Dept Was Placed on Standby During Event + (11:30:31, 4 December 2024)
- ML20212E238 + (11:30:34, 4 December 2024)
- ML20212E237 + (11:30:35, 4 December 2024)
- PNO-II-87-079, on 871128,North Anna Unit 1 Was Taken Off Line Due to Excessive Seal Leakage on B Reactor Coolant Pump. Outage Planned for 10 Days to Replace Seal Package & Inspect Lower Radial Bearing on Pump.Commonwealth of VA Informed + (11:30:35, 4 December 2024)
- ML20212E232 + (11:30:36, 4 December 2024)