Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- A06152, Responds to Violations Noted in Insp Rept 50-423/86-27 on 860818-22.Corrective Actions:Plant Trouble Rept 4M3100340 Generated for Leakage in Dissolved Gas Sampling Line & Plant Mod Request Generated Re Flushing Pump + (07:29:02, 4 December 2024)
- ML20214D420 + (07:29:08, 4 December 2024)
- ML20214D419 + (07:29:08, 4 December 2024)
- IR 05000412/1986028 + (07:29:10, 4 December 2024)
- 05000327/LER-1986-048, :on 860820,during Review of Plant Surveillance Instructions,Adequacy of SI-260.2, Bit Cold Leg... Questioned.On 861016,CCP 2A-A Failed to Meet Acceptance Criteria.Caused by Inadequate Procedure + (07:29:13, 4 December 2024)
- ML20214D408 + (07:29:14, 4 December 2024)
- ML20214D409 + (07:29:14, 4 December 2024)
- ML20214D404 + (07:29:15, 4 December 2024)
- ML20214D402 + (07:29:17, 4 December 2024)
- ML20214D400 + (07:29:18, 4 December 2024)
- ML20214D395 + (07:29:21, 4 December 2024)
- ML20214D389 + (07:29:22, 4 December 2024)
- IR 05000412/1986027 + (07:29:23, 4 December 2024)
- ML20214D384 + (07:29:24, 4 December 2024)
- ML20214D379 + (07:29:32, 4 December 2024)
- IR 05000302/1986003 + (07:29:33, 4 December 2024)
- ML20214D374 + (07:29:34, 4 December 2024)
- ML20214D368 + (07:29:35, 4 December 2024)
- TXX-6088, Interim Deficiency Rept CP-86-13 Re Jet Impingement Load Review for High Energy Piping.Intitially Reported on 860305. Completion of Component Shape Factor Review Expected by 861215.Submittal of Next Rept Anticipated by 870121 + (07:29:36, 4 December 2024)
- 05000285/LER-1987-012, :on 870413,partial Actuation of Engineered Safeguards Sys Occurred.Caused by Loss of Power to Instrument Bus A.Power Restored to Instrument Bus a & Components Actuated Returned to Alignment + (07:29:39, 4 December 2024)
- ML20214D360 + (07:29:40, 4 December 2024)
- ML20214D357 + (07:29:40, 4 December 2024)
- ML20214D354 + (07:29:41, 4 December 2024)
- ML20214D353 + (07:29:42, 4 December 2024)
- ML20214D350 + (07:29:42, 4 December 2024)
- ML20214D345 + (07:29:43, 4 December 2024)
- ML20214D342 + (07:29:47, 4 December 2024)
- IR 05000327/1986008 + (07:29:53, 4 December 2024)
- ML20214D338 + (07:29:54, 4 December 2024)
- ML20214D334 + (07:29:55, 4 December 2024)
- ML20214D335 + (07:29:55, 4 December 2024)
- ML20214D332 + (07:29:56, 4 December 2024)
- RBG-24674, Responds to NRC Ltr Re Violations Noted in Insp Rept 50-458/86-28.Corrective Actions:Permanent ALARA Coordinator Assigned Since 861016 & Contractor Assigned to ALARA Section in Preparation for PO4 Outage + (07:29:57, 4 December 2024)
- ML20214D323 + (07:29:58, 4 December 2024)
- ML20214D322 + (07:29:59, 4 December 2024)
- ML20214D320 + (07:29:59, 4 December 2024)
- ML20214D319 + (07:30:00, 4 December 2024)
- ML20214D318 + (07:30:01, 4 December 2024)
- IR 05000424/1985063 + (07:30:06, 4 December 2024)
- ML20214D316 + (07:30:06, 4 December 2024)
- ML20214D313 + (07:30:07, 4 December 2024)
- ML20214D312 + (07:30:09, 4 December 2024)
- ML20214D310 + (07:30:10, 4 December 2024)
- ML20214D309 + (07:30:11, 4 December 2024)
- ML20214D305 + (07:30:12, 4 December 2024)
- ML20214D306 + (07:30:12, 4 December 2024)
- ML20214D303 + (07:30:14, 4 December 2024)
- ML20214D301 + (07:30:15, 4 December 2024)
- 3F1086-25, Requests Registration as User of Model PAS-1 + (07:30:17, 4 December 2024)
- ML20214D296 + (07:30:18, 4 December 2024)
- 05000382/LER-1987-013, :on 870415,facility Shut Down in Hot Standby Due to Personnel Discovering Fire Wrap for Conduit Missing During Walkdown to Update Fire Wrap Drawings.Caused by Contractor Installation Oversight + (07:30:21, 4 December 2024)