ML20214D420

From kanterella
Jump to navigation Jump to search
Forwards Insp Repts 50-348/86-01 & 50-364/86-01 on 860121-24.No Violations or Deviations Noted
ML20214D420
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 02/12/1986
From: Panciera V
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Mcdonald R
ALABAMA POWER CO.
Shared Package
ML20214D422 List:
References
NUDOCS 8603050167
Download: ML20214D420 (2)


See also: IR 05000348/1986001

Text

, _ ___

.

.

-

oRkiai

FEB 121986

Alabama Power Company

(ATTN: Mr. R. P. Mcdonald

Senior Vice President

P. O. Box 2641

Birmingham, AL 35291

Gentlemen:

SUBJECT: REPORT NOS. 50-348/86-01 AND 50-364/86-01

On January 21-24, 1986, NRC inspected activities authorized by NRC Operating

License Nos. NPF-2 and NPF-8 for your Farley facilities. At the conclusion of

the inspection, the findings were discussed with those members of your staff

identified in the enclosed inspection report.

Areas examined during the inspection are identified in the report. Within these

areas, the inspection consisted of selective examinations of procedures and

representative records, interviews with personnel, and observation of activities

in pi ogress.

Within the scope of the inspection, no violations or deviations were identified.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and its enclosure

will be placed in the NRC's Public Document Room.

Should you have any questions concerning this letter, please contact us.

Sincerely,

Vincent W. Panciera, Chief

Reactor Projects Branch 2

Division of Reactor Projects l

Enclosure:

Inspection Report Nos. 50-348/86-01 l

and 50-364/86-01

cc w/ encl: I

tW: 0. Whitt, Executive Vice President l

,Jf D. Woodard, General Manager -

Nuclear Plant

v W. G. Hairston, III, General Manager -

Nuclear Support

(JI W. McGowan, Manager-Safety Audit I

and Engineering Review

W,. G. Ware, Supervisor-Safety Audit

and Engineering Review

bcc w/ encl: (See page 2)

StP% Bat? BI880p G

G

IE C J

.

.

Alabama Power Company 2

bc.c w/ encl:

WRC Resident Inspector

(E.' Reeves, Project Manager, NRR

Document Control Desk

State of Alabama

,h j hb A yt O

' oss:cdg '4 Cline DCollins HDance

02 /86 02//>J86 02/,v/86

02//[/86