Text
.'
()hd l
'
=
.
FEB 21 1986
Georgia Power Company
ATTN: Mr. R. J. Kelly
Executive Vice President
P. O. Box 4545
Atlanta, GA 30302
Gentlemen:
5
SUBJECT: REPORT NOS. 50-424/85-63 AND 50-425/85-41
On December 9,1985 - January 31, 1986, NRC inspected activities authorized by
NRC Construction Permit Nos. CPPR-108 and CPPR-109 for your Vogtle facility. At
the conclusion of the inspection, the findings were discussed with those members
of your staff identified in the enclosed inspection report.
Areas examined during the inspection are identified in the report. Within these
areas, the inspection consisted of selective examinations of procedures and
representative records, interviews with personnel, and observation of activities
in progress.
Within the scope of the inspection, no violations or deviations were identified.
Should you have any questions concerning thi3 letter, please contact us.
Sincerely,
ORIGINAL SGNED M
pgyN V. SMKULE
Virgil L. Brownlee, Chief
Reactor Projects Branch 3
Division of Reactor Projects
Enclosure:
Inspection Report Nos. 50-424/85-63
and 50-425/85-41
c w/ encl:
-R. E. Conway, Senior Vice President &
4.ProjectDirector
O. Foster, Vice President, Project
j$upport
J . D. Rice, Vice President, Project
Engineering
g.H.Pinson,VicePresident, Project
' Construction
(cc w/ encl cont'd - see page 2)
Ok $h0$$jg
l'
zkloi
'
--
-
,
-
.
'
FEB 21 1986 -
.-
Georgia Power Company
2
/ccw/ enc 1 cont'd)
J. T. Beckham, Vice President &
d.GeneralManager-Operations
A. Thomas, Vice President,
Licensing
]C.W. Hayes,VogtleQuality
/ Assurance Manager
J . C. Ramsey, Manager -
Readiness Review
. B. Bockhold, General Manager,
N
vi. uclear Cperations
T. Gucwa, Chief
I. Nuclear Engineer
H. Googe, Project
I.ConstructionManager
D. Groover, Quality
Assurance Site Manager -
Construction
%K A. Bailey, Project Licensing
d. Manager
F. Trowbridge, Esq., Shaw,
Pittman, Potts and Trowbridge
(I.W. Churchill,Esq.,Shaw,
fittman, Potts and Trowbridge
T. L. Blake, Jr. , Esq. , Shaw,
Pittman, Potts and Trowbridge
d E. Joiner, Troutman, Sanders,
).ockerman and Ashmore
W. G. Ledbetter, Commissioner,
Department of Human Resources
s4. H. Badger, Office of Planning
d.andBudget
Kirkland, III, Counsel,
Office of the Consumer's Utility
/. Council
D
C. Teper, Georgians Against
d.NuclearEnergy
Johnson, Executive Director,
Educational Campaign for a
d.ProsperousGeorgia
B. Margulies, Esq., Chairman,
Atomic Safety and Licensing Board
P
d.anel
O. H. Paris, Administrative Judge
Atomic Safety and Licensing Board
/ Panel
4. A. Linenberger, Jr., Administrative Judge
Atomic Safety and Licensing Board
I anel
P
P. Garde, Citizens Clinic, Director
Government Accountability Project
(bec w/enci - see page 3)
_
.
.'
.
..
..
FEB g1 gggg
Georgia Power Company
3
c w/ encl:
'
Reis, ELD
. M. Hill, IE
J . Miller, NRR
J . Brach, E00
M. Sinkule, RII
f.Rankin,RII
VNRC Resident Inspector
Document Control Desk
State of Georgia
[]i
RII
RI
RI
WHRankin:jw
MSinkule
VLBrownlee
rwa ker
2/Ro/86
2/jO/86
2/f3/86
2/
86
I
.
-