Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20214U176 + (05:20:41, 4 December 2024)
- ML20214U174 + (05:20:42, 4 December 2024)
- ML20214U171 + (05:20:43, 4 December 2024)
- ML20214U172 + (05:20:43, 4 December 2024)
- AECM-86-0382, Submits Updated FSAR Change Notice Review Program (Ucnr) & Status of Safety Evaluations in Response to Violation Noted in Insp Rept 50-416/86-02.UCNR Safety Evaluations Not Reported by 861231 Will Be Incorporated in 10CFR50.59 Rept + (05:20:44, 4 December 2024)
- ML20214U165 + (05:20:44, 4 December 2024)
- ML20214U162 + (05:20:45, 4 December 2024)
- ML20214U158 + (05:20:46, 4 December 2024)
- ML20214U157 + (05:20:46, 4 December 2024)
- ML20214U155 + (05:20:47, 4 December 2024)
- ML20214U147 + (05:20:48, 4 December 2024)
- ML20214U150 + (05:20:48, 4 December 2024)
- ML20214U143 + (05:20:49, 4 December 2024)
- ML20214U144 + (05:20:49, 4 December 2024)
- ML20214U141 + (05:20:50, 4 December 2024)
- IR 05000313/1986030 + (05:20:51, 4 December 2024)
- ML20214U139 + (05:20:51, 4 December 2024)
- ML20214U129 + (05:20:53, 4 December 2024)
- ML20214U127 + (05:20:53, 4 December 2024)
- AECM-86-0274, Forwards Schedule for Completion of 10 Plant Mods Identified for Literal Compliance w/10CFR50,App R + (05:20:54, 4 December 2024)
- RBG-26044, Rev 2 to Inservice Insp Plan - First Interval + (05:20:54, 4 December 2024)
- ML20214U124 + (05:20:55, 4 December 2024)
- 3F1186-22, Forwards Rev 4 to Modified Amended Physical Security Plan. Evaluation of Changes & Replacement Pages for Plan Encl.Rev Withheld (Ref 10CFR73.21) + (05:20:56, 4 December 2024)
- 05000423/LER-1987-024, :on 870506,Train B Emergency Diesel Generator (EDG) Failed During Surveillance Testing Due to Air Start Solenoid Valve Failure & Train B EDG Tripped Due to High Crankcase Pressure.Procedures Revised + (05:20:59, 4 December 2024)
- IR 05000397/1986026 + (05:21:01, 4 December 2024)
- TXX-6487, Interim Deficiency Rept CP-86-78 Re Structural Steel Bolting Connections W/Threads in Shear Plane in Unit 1 Cable Spreading Room.Initially Reported on 861107.Evaluation of Supports Continuing.Next Rept Expected by 871215 + (05:21:02, 4 December 2024)
- SNRC-1343, Recommends That NRC Reject State of Ny & Suffolk County Proposal for Having Independent Auditor Supersede NRC Staff Review of Util Program for Qualification & Training of Operations Personnel + (05:21:03, 4 December 2024)
- ML20214U107 + (05:21:03, 4 December 2024)
- ML20214U106 + (05:21:04, 4 December 2024)
- ML20214U102 + (05:21:04, 4 December 2024)
- U-600786, Forwards Rev to Physical Security Plan,Including Safeguards Contingency & Security Force Training & Qualification Plans. Summary of Changes Made Listed in Attachment A.Encls Withheld + (05:21:05, 4 December 2024)
- JAFP-86-0978, Responds to IE Bulletin 86-003 Concerning Util Action Taken Re Single Failure of Min Flow Recirculation Lines in Eccs.No Single Failure Vulnerability Identified That Would Disable Both Trains of Core Spray or RHR + (05:21:06, 4 December 2024)
- ML20214U099 + (05:21:06, 4 December 2024)
- ML20214U096 + (05:21:07, 4 December 2024)
- ML20214U086 + (05:21:12, 4 December 2024)
- ML20214U082 + (05:21:13, 4 December 2024)
- ML20214U083 + (05:21:13, 4 December 2024)
- TXX-6491, Advises That Full Participation Emergency Field Exercise Scheduled for 880426.Acceptability of Schedule Requested + (05:21:14, 4 December 2024)
- IR 05000123/1986001 + (05:21:15, 4 December 2024)
- ML20214U071 + (05:21:16, 4 December 2024)
- ML20214U065 + (05:21:17, 4 December 2024)
- ML20214U069 + (05:21:17, 4 December 2024)
- TXX-6467, Interim Deficiency Rept CP-86-10 Re Electrical Penetration Assemblies Supplied by Bunker Ramo.Initially Reported on 860424.EPA Modules Replaced by Modules Supplied by Conax. Unit 1 Completion Expected by 870730 & Unit 2 by 871130 + (05:21:18, 4 December 2024)
- 05000219/LER-1986-023, :on 861030,single Failure of Either 125-V Dc Panel D or F Rendered Automatic Initiation of Both Spray Containment Sys Inoperable.Caused by Design Error.Amend Will Be Submitted to Remove Automatic Start Feature + (05:21:23, 4 December 2024)
- SNRC-1330, Forwards Proposed Change to Licensed Operator Requalification Program Schedule to Reflect Use of Plant Simulator in Second Half 1987 Requalification Program (During Modules 87-6 & 87-7).Fee Paid + (05:21:24, 4 December 2024)
- ML20214U056 + (05:21:24, 4 December 2024)
- ML20214U055 + (05:21:25, 4 December 2024)
- ML20214U054 + (05:21:26, 4 December 2024)
- ML20214U053 + (05:21:26, 4 December 2024)
- ML20214U052 + (05:21:27, 4 December 2024)
- ML20214U051 + (05:21:27, 4 December 2024)
- ML20214U049 + (05:21:28, 4 December 2024)