ML20214U150
| ML20214U150 | |
| Person / Time | |
|---|---|
| Site: | Palo Verde |
| Issue date: | 09/11/1986 |
| From: | Haynes J ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR |
| To: | Martin J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V) |
| Shared Package | |
| ML20214U154 | List: |
| References | |
| ANPP-38221-JGH, GL-81-27, NUDOCS 8609300522 | |
| Download: ML20214U150 (3) | |
Text
. -__ _ _________ _ _ _ _ ____- _ __- _ _ _
Arizona Nuclear Power Project P.O. box 52034 e PHOENIX. ARIZONA 85072-2034 Se tember 11 ANhP-38221-JdHf986DAL/98.05 i
8 Mr. John B. Martin, Regional Administrator Office of Inspection and Enforcement t
U.S. Nuclear Regulatory Commission Region V 1450 Maria Lane, suite 210 Walnut Creek, CA 94596-5368
Subject:
Palo Verde Nuclear Generating Station (PVNGS)
Units 1, 2 and 3 Docket Nos. STN 50-528 (License NPF-41)
SIN 50-529 (License NPF-51)
SIN 50-530 Emergency Plan Implementing Procedure Update File: 86-002-493-
Dear Mr. Martin:
Arizona Nuclear Power Project (ANPP) is submitting herewith, pursuant to 10 CFR 50, Appe'ndix E, updated information in the form of copies number 6 and 9 of Emergency Plan Implementing Procedure (EPIP) 03, Procedure Change Notice 03, Revision 10.
In accordance with Generic Letter 81-27, certain pages of EPIP-03 have been marked to indicate information considered private or proprietary (including names, home telephone numbers, and internal and external telephone numbers that must remain available during an emergency).
The specific information considered private or proprietary has been bracketed in the following pages of EPIP-03: pp 7, 10, 11, 12 and 25.
D 1
e 4
e 8609300522 860911 PDR ADOCK 05000528 F
(
(
.a.,p.>ap..,e..--*
,ae
=====,e
e
=e
'e
=#
- N"*****M*
~~
4 Mr. John B. Martin, Regional Administrator Emergency Plan Implementing Procedure Update ANPP-38221 Page 2 6
4 We request the bracketed inform tion of these pages be considered confidential l
and withheld from public disclosure pursuant to 10 CFR 2.790(a)-and 10 CFR 9.5(a).
Two copies (No. 7 and No. 8) of these revisions are herewith forwarded to the Document Control Desk, USNRC, as specified in Section V of Appendix E to 10 CFR 50.
Very.truly yours, I
' 4 /W
+
J. G. Haynes Vice President Nuclear Production JGH/DAL/ dim ec:
- 0. M. DeMichele E. E. Van Brunt, Jr.
E. A. Licitra A. C. Gehr R. P. Zimmerman F
(
r h
i 4
1 e
h a
y t
REGULATORY INFORhATION DISTRIBUTION SYSTEM (RIDS) 1 0
ACCESSION NDR. h
DOC. DATE: 86/09/11 NOTARIZED: NO DOCKET #
FACIL: STN-50-52S Palo Verde Nuclear Station, Unit 1, Arizona Publi 05000528 STN-50-529 Palo Verde Nuclear Station, Unit 2, Arizona Publi 05000529 STN-50-530 Palo Verde Nuclear Station, Unit 3, Arizona Publi 05000530 AUTH.NAME AUTHOR AFFILIATION HAYNES,J.G.
Arizona Nuclear Power Project (formerly Arizona Public Serv RECIP.NAME RECIPIENT AFFILIATION MARTIN,J.B.
Region 5.
Office of Director
SUBJECT:
Forwards Procedure Change Notice 3,Rev 10 to Emergency Plan Implementing Procedure EPIP-3 per 10CFR50, App E. Withheld.
DISTRIBUTION CODE: X005D COPIES RECEIVED: LTR ENCL _
SI ZE:-
_4-i TITLE: Emerg Plan (CF Avail)
NOTES: Standardi zed plant. M. Davis, NRR: 1Cy.
05000528 Standardi z ed plant. M. Davis, NRR: 1Cy 05000529 Standardiz ed plant. M. Davis, NRR: 1Cyhf'7 05000530 RECIPIENT COPIES RECIPIENT COPIES ID CODE /NAME LTTR ENCL ID CODE /NAME LTTR ENCL PWR-B PD7 LA 1
0 PWR-B PD7 PD 1
0 LICITRA E 1
1 INTERNAL: ADM/DRR fi$~
1 1
IE/DEPER/EPB 1-f2 2
E/DEP W/IRB 4$g, 1
1 REG FILES
/
1 1
NOTES:
1 1
TOTAL NUMBER OF COPIES REOUIRED: LTTR 9
ENCL 7
-.. -.~.,.
.e..
.m..
.