Georgia Power Company 333 Memnont Avenue Atlanta. Georg:a 30308 g
Telephone 404 5264526 v
Mailing Address:
Pbst Office Box 4545 Atlanta, Georgia 30302 Georgia Power L T. Gucwa N WN""#C W'"
Manager Nuclear Safety and Licensing SL-2636 0340m X7GJ17-V120 June 4, 1987 U. S. Nuclear Regulatory Commission ATTH: Document Control Desk Hashington, D.C.
20555 PLANT V0GTLE - UNIT 1 NRC DOCKET 50-424 OPERATING LICENSE NPF-68 SUPPLEMENT TO RESPONSE TO NRC INSPECTION REPORT Gentlemen:
The following information is submitted by Georgia Power Company as a supplement to our letter SL-2450 dated May 1, 1987 to the NRC.
The subject letter provided a
response to NRC Inspection Report 1
50-424/87-12.
The information provided herein pertains to Violation 50-424/87-12-01 relative to the turbine driven auxiliary feedwater l
(TDAFH) pump steam supply valve.
Our May 1, 1987 response to the subject violation listed the reason for the violation relative to that equipment as:
"The violation occurred as a result of failing to adequately implement the
" Locked Valve Manipulation Log" as required by Procedure 10019-C and failure to adequately verify the proper equipment configurations following maintenance activities."
Upon further investigation, it was found that Procedure 13601-1, " Steam Generator and Main Steam System Operation", requires the TDAFH pump steam supply valve to be closed with no restoration steps.
Please be advised that in addition to the " corrective steps which have been taken and the results achieved" as discussed in our May 1,1987 response, the following corrective actions were taken:
1.
The valve was promptly repositioned.
2.
The operators involved were counselled on the need for attention to detail.
3.
A night order was issued to all shifts on March 2,1987.
In addition to the " corrective steps which will be taken to avoid further violations" as discussed in our response, Procedure 13601-1 has been revised to include reopening the TDAFH pump steam supply valve.
8706110026 870604 DR ADOCK 05000424 s0 PDR
k Georgia Power n U. S. Nuclear Regulatory Commission June 4, 1987 Page Two A copy of this supplemental response to the Inspection Report has been provided to NRC Region II for review.
Should you have any questions in this regard, please contact this office at any time.
Sincerely, f g e_ _=
L. T. Gucwa
)
JAE/im c: Georaia Power Comoany Mr. R. E. Conway Mr. J. P. O'Reilly i
Mr. G. Bockhold, Jr.
{
Mr. J. F. D' Amico Mr. C. H. Hayes G0-NORMS Southern Company Services Mr. R. A. Thomas i
Mr. J. A. Bailey Shaw. Pittman. Potts & Trowbridag Mr. B. H. Churchill, Attorney-at-Law Iroulman. Sanders. Lockerman & Ashmore Mr. A. H. Domby, Attorney-at-Law U. S. Nuclear Regulatory Commission Dr. J. N. Grace, Regional Administrator Ms. M. A. Miller, Licensing Project Manager, NRR (2 copies)
Mr. J. F. Rogge, Senior Resident Inspector-Operations, Vogtle Georcians Against Nuclear Energy Mr. D. Feig Ms. C. Stangler 0340m 70077$