Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20214U228 + (05:20:28, 4 December 2024)
- 05000265/LER-1987-009, :on 860626,core Spray Room Cooler 2B Found W/ Broken Fan Belt.Caused by variable-pitch Sheave on Motor Shaft Causing Accelerated Wear.Fixed Pitch Sheave Installed & Tested by 870120 + (05:20:29, 4 December 2024)
- PNO-I-86-095, on 861130,unit Scrammed from 100% Power Due to Malfunction of Main Transformer,Loss of Generator Load & Turbine Overspeed.Transformer Disassembly in Progress to Determine Cause of Event + (05:20:30, 4 December 2024)
- ML20214U216 + (05:20:31, 4 December 2024)
- ML20214U212 + (05:20:32, 4 December 2024)
- ML20214U214 + (05:20:32, 4 December 2024)
- ML20214U210 + (05:20:33, 4 December 2024)
- ML20214U209 + (05:20:34, 4 December 2024)
- ML20214U206 + (05:20:34, 4 December 2024)
- ML20214U205 + (05:20:35, 4 December 2024)
- ML20214U204 + (05:20:35, 4 December 2024)
- ML20214U202 + (05:20:36, 4 December 2024)
- ML20214U194 + (05:20:38, 4 December 2024)
- ML20214U197 + (05:20:38, 4 December 2024)
- TXX-6496, Forwards Revised Response to Violations & Deviations Noted in Insp Repts 50-445/86-15 & 50-446/86-12,per 870408 Request.Corrective Actions:Completed Work Packages for 91 ASME & quality-related non-ASME Support Assemblies Reviewed + (05:20:40, 4 December 2024)
- ML20214U184 + (05:20:40, 4 December 2024)
- ML20214U176 + (05:20:41, 4 December 2024)
- ML20214U174 + (05:20:42, 4 December 2024)
- ML20214U171 + (05:20:43, 4 December 2024)
- ML20214U172 + (05:20:43, 4 December 2024)
- AECM-86-0382, Submits Updated FSAR Change Notice Review Program (Ucnr) & Status of Safety Evaluations in Response to Violation Noted in Insp Rept 50-416/86-02.UCNR Safety Evaluations Not Reported by 861231 Will Be Incorporated in 10CFR50.59 Rept + (05:20:44, 4 December 2024)
- ML20214U165 + (05:20:44, 4 December 2024)
- ML20214U162 + (05:20:45, 4 December 2024)
- ML20214U158 + (05:20:46, 4 December 2024)
- ML20214U157 + (05:20:46, 4 December 2024)
- ML20214U155 + (05:20:47, 4 December 2024)
- ML20214U147 + (05:20:48, 4 December 2024)
- ML20214U150 + (05:20:48, 4 December 2024)
- ML20214U143 + (05:20:49, 4 December 2024)
- ML20214U144 + (05:20:49, 4 December 2024)
- ML20214U141 + (05:20:50, 4 December 2024)
- IR 05000313/1986030 + (05:20:51, 4 December 2024)
- ML20214U139 + (05:20:51, 4 December 2024)
- ML20214U129 + (05:20:53, 4 December 2024)
- ML20214U127 + (05:20:53, 4 December 2024)
- AECM-86-0274, Forwards Schedule for Completion of 10 Plant Mods Identified for Literal Compliance w/10CFR50,App R + (05:20:54, 4 December 2024)
- RBG-26044, Rev 2 to Inservice Insp Plan - First Interval + (05:20:54, 4 December 2024)
- ML20214U124 + (05:20:55, 4 December 2024)
- 3F1186-22, Forwards Rev 4 to Modified Amended Physical Security Plan. Evaluation of Changes & Replacement Pages for Plan Encl.Rev Withheld (Ref 10CFR73.21) + (05:20:56, 4 December 2024)
- 05000423/LER-1987-024, :on 870506,Train B Emergency Diesel Generator (EDG) Failed During Surveillance Testing Due to Air Start Solenoid Valve Failure & Train B EDG Tripped Due to High Crankcase Pressure.Procedures Revised + (05:20:59, 4 December 2024)
- IR 05000397/1986026 + (05:21:01, 4 December 2024)
- TXX-6487, Interim Deficiency Rept CP-86-78 Re Structural Steel Bolting Connections W/Threads in Shear Plane in Unit 1 Cable Spreading Room.Initially Reported on 861107.Evaluation of Supports Continuing.Next Rept Expected by 871215 + (05:21:02, 4 December 2024)
- SNRC-1343, Recommends That NRC Reject State of Ny & Suffolk County Proposal for Having Independent Auditor Supersede NRC Staff Review of Util Program for Qualification & Training of Operations Personnel + (05:21:03, 4 December 2024)
- ML20214U107 + (05:21:03, 4 December 2024)
- ML20214U106 + (05:21:04, 4 December 2024)
- ML20214U102 + (05:21:04, 4 December 2024)
- U-600786, Forwards Rev to Physical Security Plan,Including Safeguards Contingency & Security Force Training & Qualification Plans. Summary of Changes Made Listed in Attachment A.Encls Withheld + (05:21:05, 4 December 2024)
- JAFP-86-0978, Responds to IE Bulletin 86-003 Concerning Util Action Taken Re Single Failure of Min Flow Recirculation Lines in Eccs.No Single Failure Vulnerability Identified That Would Disable Both Trains of Core Spray or RHR + (05:21:06, 4 December 2024)
- ML20214U099 + (05:21:06, 4 December 2024)
- ML20214U096 + (05:21:07, 4 December 2024)
- ML20214U086 + (05:21:12, 4 December 2024)