Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20215G117 + (03:25:40, 4 December 2024)
- ML20215G116 + (03:25:41, 4 December 2024)
- ML20215G113 + (03:25:42, 4 December 2024)
- ML20215G114 + (03:25:42, 4 December 2024)
- ML20215G110 + (03:25:43, 4 December 2024)
- ML20215G111 + (03:25:43, 4 December 2024)
- ML20215G108 + (03:25:44, 4 December 2024)
- ML20215G109 + (03:25:44, 4 December 2024)
- ML20215G103 + (03:25:46, 4 December 2024)
- ML20215G105 + (03:25:46, 4 December 2024)
- ML20215G102 + (03:25:47, 4 December 2024)
- ML20215G100 + (03:25:48, 4 December 2024)
- ML20215G101 + (03:25:48, 4 December 2024)
- PNO-III-86-113, on 861009,three Licensee Employees Received Minor Facial Burns from Small Release of UF6 from Process Equipment Inside Plant.Workers Treated Onsite & Returned to Work.No Offsite Release of UF6 Occurred + (03:25:49, 4 December 2024)
- ML20215G098 + (03:25:50, 4 December 2024)
- 05000312/LER-1986-023, :on 861111,inadequate Voltage Supplies Sent to Control Room/Technical Support Center HVAC Under Certain Worst Case Conditions.Caused by Inadequate Engineering Review.Ecn R-0911 Written + (03:25:52, 4 December 2024)
- ML20215G096 + (03:25:52, 4 December 2024)
- ML20215G094 + (03:25:53, 4 December 2024)
- ML20215G095 + (03:25:53, 4 December 2024)
- ML20215G091 + (03:25:57, 4 December 2024)
- ML20215G093 + (03:25:57, 4 December 2024)
- ML20215G089 + (03:25:58, 4 December 2024)
- ML20215G090 + (03:25:58, 4 December 2024)
- ML20215G087 + (03:25:59, 4 December 2024)
- ML20215G084 + (03:26:00, 4 December 2024)
- ML20215G086 + (03:26:00, 4 December 2024)
- ML20215G083 + (03:26:01, 4 December 2024)
- NLS8600254, Informs That SPDS Declared Operable on 860731,meeting 850829 Confirmatory Order Requirement.Sys Reliability Demonstrated by Results of 1,000 H Run Test + (03:26:01, 4 December 2024)
- ST-HL-AE-1752, Forwards Amend 55 to Fsar,Incorporating Revised Criteria Re Jet Length,Increased Cumulative Usage Factor,Inservice Surveillance of post-irradiated Fuel Assemblies & General Updates & Revs + (03:26:02, 4 December 2024)
- ML20215G075 + (03:26:03, 4 December 2024)
- ST-HL-AE-1775, Forwards Response to 861001 Request for Addl Technical Justification for Use of Coupled Analysis for 12-inch & Larger Piping Connected to Reactor Coolant Loop,Per Util 860915 FSAR Changes.Related Correspondence + (03:26:03, 4 December 2024)
- ML20215G073 + (03:26:04, 4 December 2024)
- ML20215G072 + (03:26:04, 4 December 2024)
- ML20215G070 + (03:26:05, 4 December 2024)
- ML20215G069 + (03:26:06, 4 December 2024)
- ML20215G066 + (03:26:07, 4 December 2024)
- IR 05000266/1986015 + (03:26:08, 4 December 2024)
- ML20215G064 + (03:26:09, 4 December 2024)
- 05000269/LER-1986-011-04, :on 861001,suction to Low Pressure Svc Water Lost When Performing Load Shed Test on Unit 2.Caused by Inadequate Design & Testing of Emergency Condenser Cooling Water Sys.Load Shed Test Date Evaluated + (03:26:11, 4 December 2024)
- ML20215G059 + (03:26:11, 4 December 2024)
- ML20215G056 + (03:26:12, 4 December 2024)
- ML20215G057 + (03:26:12, 4 December 2024)
- ML20215G054 + (03:26:13, 4 December 2024)
- ML20215G053 + (03:26:14, 4 December 2024)
- ML20215G052 + (03:26:14, 4 December 2024)
- 05000397/LER-1986-038, :on 861120,reactor Scram Occurred.Caused by Rapid Decrease in Reactor Water Level Upon Incorrect Alignment of Condensate Cleanup Block Valves & Feedwater Diversion to Empty Line.Operators Counseled + (03:26:16, 4 December 2024)
- ML20215G047 + (03:26:17, 4 December 2024)
- ML20215G050 + (03:26:17, 4 December 2024)
- ML20215G045 + (03:26:18, 4 December 2024)
- ML20215G041 + (03:26:18, 4 December 2024)
- IR 05000312/1987014 + (03:26:19, 4 December 2024)
- ML20215G039 + (03:26:19, 4 December 2024)