ML20215G073
| ML20215G073 | |
| Person / Time | |
|---|---|
| Site: | Vermont Yankee File:NorthStar Vermont Yankee icon.png |
| Issue date: | 10/09/1986 |
| From: | Capstick R VERMONT YANKEE NUCLEAR POWER CORP. |
| To: | Rooney V Office of Nuclear Reactor Regulation |
| References | |
| FVY-86-93, NUDOCS 8610160474 | |
| Download: ML20215G073 (2) | |
Text
f
' VERMONT YANKEE NUCLEAR POWER CORPORATION RD 5, Box 169, Ferry Road, Brattleboro, VT 05301 p,,Ly,0.
' y ENGINEERING OFFICE 167 WORCESTER ROAD i
October 9' 1986 FRAMINGHAM, MASSACHUSETTS 01701 FVY 86-93 retspsone ir 724ioo United States Nuclear Regulatory Conmission Washington, DC 20555 Attention:
Office of Nuclear Reactor Regulation Mr. Vernon L. Rooney, Senior Project Manager BWR Project Directorate No. 2 Division of BWR Licensing
References:
(a) License No. DPR-28 (Docket No. 50-271)
(b) Letter, USNRC to VYNPC, NVY 86-88, dated April 30, 1986 (c) Letter, VYNPC to USNRC, FVY 86-48, dated May 30, 1986
Subject:
Response to NRC Request Concerning Regulatory Requirements Status
Dear Sir:
By letter dated April 30, 1986 [ Reference (b)], you requested information concerning the status of 138 generic regulatory requirements applicable to the Vermont Yankee Nuclear Power Station. In accordance with your request, Vermont Yankee submitted by letter dated May 30, 1986 [ Reference (c)], a plant-specific list addressing 120 of the NRC multiplant action items providing the date that all aspects of each requirement were completed / implemented or expected to be completed. Enclosure 1 to this letter provides the status for the remaining 18 items where we required additional information or clarification relative to the specific requirement for which status was requested. Please be advised that pursuant to our discussion of September 15, 1986, MPA Items A-12, B-20, B-21, B-27, B-42, B-70, D-11, and D-15 have been identified as completed or not applicable (N/A) based upon the information contained in NRC memorandum " Clarification of MPA's for SIMS,"
R. L. Emch to Project Directors / Managers, dated August 18, 1986.
This letter completes Vermont Yankee's response to your request; however, should you have questions or require additional information, please do not hesitate to contact this office.
Very truly yours, k
Nh 0
1 VERMONT YANKEE NUC POWER CORPORATION Y
f R. W. Capstick Licensing Engineer RWC/jlc 0l Enclosure i
e ENCLOTURE 1 Licensee MPA No.
Title Status Date A-12 Vital Area Analysis N/A*
A-14 10CFR50.55A(G) - Inservice Testing Completed 1/30/80 A-21 10CFR50.61, Pressurized Thermal Shock Rule N/A*
B-05 Stress Corrosion Cracking - PWR RCSPB Completed 6/15/84 B-16 Emergency Planning and Revisions Completed 4/1/81 B-20 Containment Leakage Due to Seal Deterioration N/A*
B-21 Loss of 125 V de Bus Voltage with Loss of Completed 2/23/82 Annunciation B-27 Revlew Responses to 11 Bulletin 78-03 N/A*
(Off-Cas Expl.)
B-27 Review Response to IE Bulletin 78-03 N/A*
(Off-Cas Expl.)
B-42 TMI Followup - All Plants N/A*
B-61 Loss of Non-Class IE I&C Power Completed 1980 B-62 ESF Reset Control Design Deficiency Completed 1980 B-70 Fatigue Translent Limit Technical N/A*
Specification B-72 NUREC-0737 Technlcal Specifications Projected 1987 (Generic Letter 63-02)
D-11 Fission Cas Release Completed 10/13/78 D-15 High Energy Line Break and Consequential N/A*
System Failure D-17 Definition of Operable Completed 12/18/80 E-03 Core Reloads Roquiring Prior NRC Approval Competed 9/16/82
- N/A = Not Applicable l