ML20215G059

From kanterella
Jump to navigation Jump to search
Forwards Safety Insp Repts 50-266/86-15 & 50-301/86-14 on 860801-0930.No Violations Noted
ML20215G059
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 10/09/1986
From: Guldemond W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Fay C
WISCONSIN ELECTRIC POWER CO.
Shared Package
ML20215G062 List:
References
NUDOCS 8610160469
Download: ML20215G059 (2)


See also: IR 05000266/1986015

Text

hm8

.

C

r

3

.

OCT 9

1986

Docket No. 50-266

Docket No. 50-301

Wisconsin Electric Power Company

. ATTN: Mr. C. W. Fay

Vice President

Nuclear Power Department

231 West Michigan, Room 308

Milwaukee, WI 53201

Gentlemen:

This refers to the routine safety inspection conducted by Messrs. R. L. Hague

and R. J. Leemon of this office on August 1 through September. 30, 1986, of

activities at Point Beach Nuclear Plant, Unit I and 2, authorized by NRC

Operating Licenses No. DPR-24 and DPR-27 and to the discussion of our findings

with J. J. Zach at the conclusion of the inspection.

The enclosed copy of our inspection report identifies areas examined during

the inspection. Within these areas, the inspection consisted of a selective

examination of procedures and representative records, observations, and

interviews with personnel.

No violations of NRC requirements were identified during the course of this

inspection.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of

this-letter and the enclosed inspection report will be placed in the NRC

Public Document Room.

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

86101MN

ek

CI?2TIL CICCD M' W 0 G"LZ'O'U

PDR

0

W. G. Guldemond, Chief

Projects Branch 2

Enclosure:

Inspection Reports

No. 50-266/86015 DRP);

No. 50-301/86014 DRP)

See Attached Distribution

RIII ,

RII /

Jacii

Gu

ond

'

i

n

T Es{

. ,-

,

' Wisconsin Electric Fower Company

2

Distribution

cc w/ enclosure:

J. J. Zach, Plant Manager

DCS/RSB (RIDS).

Licensing Fee Management Branch

Resident Inspector, RIII

John J. Duffy, Chief

Boiler Section

Mary Lou Munts, Chairperson

Wisconsin Public Service

Commission

!

"

.

,

!

.--

-,-

c . , -.~ .

.

- , .

_ , . . . , _ . . . . - , , . - . _ , ,- ,

- . - - . - ~ . , - - . . - . , - . , . - , - - _ . . , _ - - - - , . , , - - . , -