Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML19269C002 + (12:00:37, 3 January 2025)
- ML19269C000 + (12:00:38, 3 January 2025)
- ML19269B999 + (12:00:39, 3 January 2025)
- ML19269B998 + (12:00:40, 3 January 2025)
- ML19269B997 + (12:00:41, 3 January 2025)
- ML19269B996 + (12:00:42, 3 January 2025)
- ML19269B995 + (12:00:43, 3 January 2025)
- ML19269B993 + (12:00:45, 3 January 2025)
- ML19269B991 + (12:00:46, 3 January 2025)
- ML19269B990 + (12:00:47, 3 January 2025)
- ML19269B989 + (12:00:48, 3 January 2025)
- IR 05000293/1978025 + (12:00:50, 3 January 2025)
- ML19269B986 + (12:00:52, 3 January 2025)
- ML19269B985 + (12:00:52, 3 January 2025)
- ML19269B984 + (12:00:56, 3 January 2025)
- ML19269B983 + (12:00:57, 3 January 2025)
- ML19269B982 + (12:00:58, 3 January 2025)
- ML19269B981 + (12:00:59, 3 January 2025)
- BECO-LTR-78-207, Responds to NRC Re Violation Noted in IE Insp Rept 50-293/78-25.Corrective Actions:Issued Memo to Watch Engineers Reemphasizing Responsibility to Check All Instructions Against Normal Operating Procedures + (12:01:00, 3 January 2025)
- ML19269B978 + (12:01:02, 3 January 2025)
- ML19269B976 + (12:01:03, 3 January 2025)
- ML19269B975 + (12:01:04, 3 January 2025)
- ML19269B974 + (12:01:05, 3 January 2025)
- ML19269B973 + (12:01:06, 3 January 2025)
- ML19269B971 + (12:01:08, 3 January 2025)
- ML19269B970 + (12:01:09, 3 January 2025)
- ML19269B968 + (12:01:10, 3 January 2025)
- ML19269B969 + (12:01:10, 3 January 2025)
- ML19269B966 + (12:01:11, 3 January 2025)
- ML19269B965 + (12:01:12, 3 January 2025)
- ML19269B963 + (12:01:13, 3 January 2025)
- ML19269B962 + (12:01:13, 3 January 2025)
- OI 2-2017-032, Confirmatory Letter to Thomas Saunders Confirmatory Order (IA-19-027) (OI 2-2017-032) + (12:01:14, 3 January 2025)
- ML19269B960 + (12:01:15, 3 January 2025)
- ML19269B956 + (12:01:16, 3 January 2025)
- ML19269B959 + (12:01:16, 3 January 2025)
- ML19269B955 + (12:01:17, 3 January 2025)
- ML19269B953 + (12:01:18, 3 January 2025)
- ML19269B952 + (12:01:19, 3 January 2025)
- ML19269B951 + (12:01:19, 3 January 2025)
- ML19269B950 + (12:01:20, 3 January 2025)
- ML19269B949 + (12:01:21, 3 January 2025)
- ML19269B948 + (12:01:22, 3 January 2025)
- ML19269B946 + (12:01:23, 3 January 2025)
- ML19269B945 + (12:01:24, 3 January 2025)
- 05000277/LER-1978-049-03, /03L-0 on 781218:surveillance Testing Revealed B Rod Block Monitor Set Points Had Shifted Upwards Approx 15%. Caused by Failure of Zener Diode in Flow Bias Circuitry Power Supply + (12:01:25, 3 January 2025)
- 05000324/LER-1978-081-03, /03L-0 on 781212:due to Lack of Control Power There Was No Control Board Indication for Control Bldg Emergency Air Supply Fan B.Caused by Limit Switch Lug (VA-25-915D) Grounded to Switch Protective Housing + (12:01:27, 3 January 2025)
- ML19269B942 + (12:01:28, 3 January 2025)
- 05000324/LER-1978-081, Forwards LER 78-081/03L-0 + (12:01:30, 3 January 2025)
- ML19269B937 + (12:01:31, 3 January 2025)
- ML19269B938 + (12:01:31, 3 January 2025)