Forwards Insp Repts 50-338/78-37 & 50-339/78-32 on 781002-1103 & Notice of Violation
ML19269B986
Person / Time
Site: North Anna  Dominion icon.png
Issue date: 12/12/1978
From: Long F
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Proffitt W
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
Shared Package
ML19269B977 List:
References
NUDOCS 7901190182
Download: ML19269B986 (2)


See also: IR 05000338/1978037

Text

e

,

UNITED STATES

em Ricoq(o,

NUCLEAR REGULATORY COMMISSION

,

,

,

REGloN li

g

g

' . , ,

101 M ARlETTA STREET. N.W.

"

E

-

'[

ATL ANTA. GEORGI A 30303

o,

  • %

?"

DEC 12 1973

In Reply Refer To:

RII:MSK

50-338/78-37

50-339/78-32

Virginia Electric and Power Company

Atta:

Mr. W. L. Proffitt

Senior Vice President,

Power

P. O. Box 26666

Richmond, Virginia

23261

Gentlemen:

This refers to the inspection conducted by Mr. M. S. Kidd of this office on

October 2 - November 3, 1978, of activities authorized by NRC License

No. NPF-4 and Construction Permit No. CPPR-78 for the North Anna Power

Station facility, and to the discussion of our findings held with

Mr. W. R. Cartwright and others of your staff periodically during of the

inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report. Within these areas, the inspection consisted

of selective examinations of procedures and representative records,

interviews with personnel, and observations by the inspector.

We have examined actions you have taken with regard to previously reported

unresolved items. The status of these items is discussed in the enclosed

report.

One new unresolved item resulted from this inspection and is discussed in

the enclosed report. This item will be examined during subsequent

inspections.

During the inspection, it was found that certain activities under your

license appear to be in noncompliance with NRC requirements.

These items

and references to pertinent requirements are listed in the Notice of

Violation enclosed herewith as Appendix A.

This notice is sent to you

pursuant to the provisions of Section 2.201 of the NRC's " Rules of

Practice," Part 2, Title 10, Code of Federal Regulations.

Section 2.201

7 9 012 9 o t g;>

,

.

DEC1 2 lim

.

Virginia Electric and Power

-2-

Company

requires you to submit to this office, within 20 days of your receipt of

this notice, a written statement or explanation in reply including:

(1)

corrective steps which have been takea by you, and the results achieved;

(2) corrective steps which will be taken to avoid further noncompliance;

and (3) the date when full compliance will be achieved.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,

,

Title 10, Code of Federal Regulations, a copy of this letter and the enclosed

inspection report will be placed in the NRC's Public Document Room.

If

this report contains any information that you (or your contractor) believe

to be proprietary, it is necessary that you make a written application

within 20 days to this of fice to withhold such information from public

disclosure.

Any such application must include a full statement of the

reasons on the basis of which it is claimed that the information is

proprietary, and should be prepared so that proprietary information

identified in the application is contained in a separate part of the

document.

If we do not hear from you in this regard within the specified

period, the report will be placed in the Public Document Room.

Should you have any questions concerning this letter, we will be glad to

discuss them with you.

Sincerely,

N

F. J. Long, Chief

Reactor Operations and Nuclear

Support Branch

Enclosures:

1.

Appendix A, Notice of Violation

2.

Inspection Report Nos. 50-338/78-37

and 50-339/78-32

cc w/ enc 1:

Mr. W. R. Cartwright, Station Manager

North Anna Power Station

Box 402

Mineral, Virginia 23117

Mr. P. M. Peery

Senior Resident Engineer

P. O. Box 38

Mineral, Virginia 23117