Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20235L392 + (09:59:54, 3 December 2024)
- ML20235L389 + (09:59:55, 3 December 2024)
- ML20235L386 + (09:59:57, 3 December 2024)
- IR 05000312/1988033 + (09:59:57, 3 December 2024)
- ML20235L382 + (09:59:58, 3 December 2024)
- IR 05000321/1988042 + (10:00:04, 3 December 2024)
- ML20235L377 + (10:00:05, 3 December 2024)
- ML20235L371 + (10:00:06, 3 December 2024)
- ML20235L376 + (10:00:06, 3 December 2024)
- ML20235L369 + (10:00:07, 3 December 2024)
- ML20235L368 + (10:00:08, 3 December 2024)
- TXX-6731, Final Deficiency Rept CP-87-62 Re Use of Nomographs to Design Seismically Supported Class 5 Piping Sys.Initially Reported on 870824.Spec 2323-MS-46B Will Be Revised to Include Appropriate Criteria for Use of Nomagraphs + (10:00:09, 3 December 2024)
- ML20235L362 + (10:00:09, 3 December 2024)
- IR 05000324/1989003 + (10:00:11, 3 December 2024)
- ML20235L357 + (10:00:11, 3 December 2024)
- ML20235L355 + (10:00:12, 3 December 2024)
- ML20235L353 + (10:00:13, 3 December 2024)
- ML20235L346 + (10:00:14, 3 December 2024)
- ML20235L345 + (10:00:14, 3 December 2024)
- ML20235L343 + (10:00:15, 3 December 2024)
- ML20235L335 + (10:00:16, 3 December 2024)
- TXX-6775, Forwards Revised Response to Notice of Deviation Re Insp Repts 50-445/85-13 & 50-446/85-09.Corrective Actions:Out of Scope Observation Written by Inspector to Document Existence of Holes in Pipe Support Not Shown on Drawing + (10:00:16, 3 December 2024)
- ML20235L331 + (10:00:17, 3 December 2024)
- ML20235L326 + (10:00:18, 3 December 2024)
- ML20235L327 + (10:00:18, 3 December 2024)
- ML20235L322 + (10:00:19, 3 December 2024)
- ML20235L315 + (10:00:20, 3 December 2024)
- ML20235L307 + (10:00:26, 3 December 2024)
- ML20235L303 + (10:00:27, 3 December 2024)
- ML20235L299 + (10:00:28, 3 December 2024)
- ML20235L296 + (10:00:28, 3 December 2024)
- ST-HL-AE-2977, Responds to NRC Re Violations Noted in Insp Rept 50-498/88-68.Corrective Actions:Phase B Isolation Requirements Incorporated in Emergency Operating Procedures & Team Formed to Conduct Enhancement Program + (10:00:29, 3 December 2024)
- W3P87-1782, Responds to Violations Noted in Insp Rept 50-382/87-17. Corrective Actions:Missing Locknuts Installed on Restraints MSSH-3084,SIRR-3006 & SIR-3008,other Disturbed Restraints Inspected & Training Session Will Be Held + (10:00:30, 3 December 2024)
- ML20235L282 + (10:00:31, 3 December 2024)
- ML20235L281 + (10:00:32, 3 December 2024)
- ML20235L276 + (10:00:33, 3 December 2024)
- ML20235L272 + (10:00:34, 3 December 2024)
- ML20235L266 + (10:00:35, 3 December 2024)
- ML20235L265 + (10:00:36, 3 December 2024)
- IR 05000454/1987036 + (10:00:38, 3 December 2024)
- ML20235L253 + (10:00:39, 3 December 2024)
- ML20235L250 + (10:00:40, 3 December 2024)
- 3F0289-12, Requests Discretionary Enforcement Associated W/Performance of Surveillance Required by Tech Spec 4.3.1.1.1.Licensee Proposes to Delay Performance of Next Monthly Test Until Plant Restarted Following Repair of Reactor Coolant Pump + (10:00:41, 3 December 2024)
- ML20235L245 + (10:00:41, 3 December 2024)
- TXX-6780, Interim Deficiency Rept CP-87-82 Re Discrepancies Observed in Fire Control Panels.Listed Deviations,Including Specs & Design & Vendor Drawings Noted.Initially Reported on 870831. Corrective Action Not Given.Next Rept Anticipated by 871124 + (10:00:42, 3 December 2024)
- ML20235L236 + (10:00:43, 3 December 2024)
- ML20235L235 + (10:00:44, 3 December 2024)
- ML20235L227 + (10:00:45, 3 December 2024)
- ML20235L218 + (10:00:46, 3 December 2024)
- ML20235L215 + (10:00:47, 3 December 2024)
- ML20235L208 + (10:00:48, 3 December 2024)