Text
SEP 8 o 1987
In Reply Refer To:
Dockets:
50-313/87-14
50-368/87-14
Arkansas Power & Light Company
ATTN:
Mr. Gene Campbell
Vice President, Nuclear
Operations
P. O. Box 551
Little Rock, Arkansas
72203
Gentlemen:
This refers to the inspection conducted by Mr. M. E. Murphy of this office,
Messrs. D. J. Kubicki, R. S. Lee, and G. Dick of the Office of Nuclear Reactor
Regulation, and Messrs. M. Villaran and K. Parkinson of Brookhaven National
Laboratory, during the periods May 4-8 and June 8-12, 1987, of activities
i
authorized by NRC Operating Licenses DPR-51 and NPF-6 for Arkansas Nuclear One,
l
Units 1 and 2, and to the discussion of our findings with Mr. S. M. Quennoz and
l
other members of your staff at the conclusion of the inspection.
!
,
l
Areas examined during the inspection included implementation of and compliance
to the safe shutdown requirements of 10 CFR 50, Appendix R.
Witnin these
areas, the inspection consisted of selective examination of procedures and
representative records, interviews with personnel, and observations by the NRC
inspectors.
The inspection findings are documented in the enclosed inspection
report.
During this inspection, it was found that certain of your activities were in
l
violation of NRC requirements.
Consequently, you are required to respond to
this violation, in writing, in accordance with the provisions of Section 2.201
of the NRC's " Rules of Practice," Part 2, Title 10, Code of Federal
Regulations.
Your response should be based on the specifics contained in the
Notice of Violation enclosed with this letter.
During this inspection, it was found that certain of your activities appeared
to deviate from accepted industry standards / commitments made to NRC.
These
i
items and references to the standards / commitments are identified in the
enclosed Notice of Deviation.
You are requested to respond to these deviations
in writing.
Your response should be based on the specifics contained in the
Notice of Deviation enclosed with this letter.
Three unresolved items are identified in paragraphs 3, 9.a(5), and 11.b(1) of
the enclosed inspection report.
The response directed by this letter and the accompanying Notice is not subject
to the clearance procedures of the Office of Management and Budget as required
by the Paperwork Reduction Act of 1980, PL 96-511.
\\
Pb
PB
C:RP
p MEM
iy/cz
FDRHu ter-
.
JEGagliardo
f//
87
flf/87
/p/87
'
i
8710050401 870930
g
DR
ADOCK 050
3
.
- _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _
-__
Arkansas Power & Light Company
-2-
1
Should you have any questions concerning this inspection, we will be pleased to
discuss them with you.
l
1
Sincerely,
- M e nas u v,va ., ,
- A E Hal t-
1
J. E. Gagliardo, Chief
Reactor Projects Branch
l
!
Enclosures
1.
Appendix A - Notice of Violation
l
2.
Appendix B - Notice of Deviation
3.
Appendix C - NRC Inspection Report
,
50-313/87-14
!
50-368/67-14
I
4.
Attachment to Inspection Report
I
i
cc w/ enclosures:
J. M. Levine, Director
Site Nuclear Operations
Arkansas Nuclear One
P. O. Box 608
Russellville, Arkansas
72801
Arkansas Radiation Control Program Director
bcc to DMB (IE01)
I
1
bec distrib. by RIV:
- RPB
- RRI
R. D. Martin, RA
RPSB
- Section Chief (RPB/B)
"D. Weiss, RM/ALF
- RIV
DRSP
- RSB
- MIS System
- RSTS Operator
- Project Inspector, RPB
- R. Hall
- G. Dick, NRR Project Manager
- w/766
l
,
- _ _ _ -