Forwards Insp Repts 50-313/87-14 & 50-368/87-14 on 870504-08 & 0608-12,notice of Violation & Notice of Deviation
ML20235L245
Person / Time
Site: Arkansas Nuclear  Entergy icon.png
Issue date: 09/30/1987
From: Gagliardo J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Campbell G
ARKANSAS POWER & LIGHT CO.
Shared Package
ML20235L248 List:
References
NUDOCS 8710050401
Download: ML20235L245 (2)


See also: IR 05000313/1987014

Text

SEP 8 o 1987

In Reply Refer To:

Dockets: 50-313/87-14

50-368/87-14

Arkansas Power & Light Company

ATTN: Mr. Gene Campbell

Vice President, Nuclear

Operations

P. O. Box 551

Little Rock, Arkansas 72203

Gentlemen:

This refers to the inspection conducted by Mr. M. E. Murphy of this office,

Messrs. D. J. Kubicki, R. S. Lee, and G. Dick of the Office of Nuclear Reactor

Regulation, and Messrs. M. Villaran and K. Parkinson of Brookhaven National

Laboratory, during the periods May 4-8 and June 8-12, 1987, of activities

i authorized by NRC Operating Licenses DPR-51 and NPF-6 for Arkansas Nuclear One,

l Units 1 and 2, and to the discussion of our findings with Mr. S. M. Quennoz and

l

,

other members of your staff at the conclusion of the inspection.  !

l Areas examined during the inspection included implementation of and compliance

to the safe shutdown requirements of 10 CFR 50, Appendix R. Witnin these

areas, the inspection consisted of selective examination of procedures and

representative records, interviews with personnel, and observations by the NRC

inspectors. The inspection findings are documented in the enclosed inspection

report.

During this inspection, it was found that certain of your activities were in

l violation of NRC requirements. Consequently, you are required to respond to

this violation, in writing, in accordance with the provisions of Section 2.201

of the NRC's " Rules of Practice," Part 2, Title 10, Code of Federal

Regulations. Your response should be based on the specifics contained in the

Notice of Violation enclosed with this letter.

During this inspection, it was found that certain of your activities appeared

to deviate from accepted industry standards / commitments made to NRC. These i

items and references to the standards / commitments are identified in the

enclosed Notice of Deviation. You are requested to respond to these deviations

in writing. Your response should be based on the specifics contained in the

Notice of Deviation enclosed with this letter.

Three unresolved items are identified in paragraphs 3, 9.a(5), and 11.b(1) of

the enclosed inspection report.

The response directed by this letter and the accompanying Notice is not subject

to the clearance procedures of the Office of Management and Budget as required

by the Paperwork Reduction Act of 1980, PL 96-511.

Pb iy/cz

PB C:RP \

p MEM FDRHu ter- .

JEGagliardo

f// 87

flf/87 '

/p/87

i

8710050401 870930 3 g

DR ADOCK 050 .

- _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _

-__

Arkansas Power & Light Company -2-

1

Should you have any questions concerning this inspection, we will be pleased to

discuss them with you. l

1

Sincerely,

  • M e nas u v,va ., ,

- A E Hal t-

1 J. E. Gagliardo, Chief

Reactor Projects Branch l

!

Enclosures

1. Appendix A - Notice of Violation l

2. Appendix B - Notice of Deviation

3. Appendix C - NRC Inspection Report ,

50-313/87-14  !

50-368/67-14 I

4. Attachment to Inspection Report I

i

cc w/ enclosures:

J. M. Levine, Director

Site Nuclear Operations

Arkansas Nuclear One

P. O. Box 608

Russellville, Arkansas 72801

Arkansas Radiation Control Program Director

I

bcc to DMB (IE01)

1

bec distrib. by RIV:

  • RPB *RRI R. D. Martin, RA

RPSB *Section Chief (RPB/B) "D. Weiss, RM/ALF

  • RIV DRSP *RSB
  • MIS System *RSTS Operator * Project Inspector, RPB
  • R. Hall *G. Dick, NRR Project Manager
  • w/766

l

,