Forwards Insp Repts 50-321/88-42 & 50-366/88-42 on 881224- 890120.Three Violations Will Not Be Cited Since All Criteria for licensee-identified Violations Met
ML20235L369
Person / Time
Site: Hatch  Southern Nuclear icon.png
Issue date: 02/16/1989
From: Herdt A
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Hairston W
GEORGIA POWER CO.
Shared Package
ML20235L372 List:
References
NUDOCS 8902270492
Download: ML20235L369 (2)


See also: IR 05000321/1988042

Text

-

-.

_

-

_

.-

1

h

.

.

.

i

FEB 161989

Docket Nos. 50-321, 50-366

License Nos. DPR-57, NPF-5

Georgia Power Company

ATTN: Mr. W. G. Hairston, III

Senior Vice President -

Nuclear Operations

P. O. Box 1295

Birmingham, AL 35201

Gentlemen:

SUBJECT: NRC INSPECTION REPORT NOS. 50-321/88-42 AND 50-366/88-42

This refers to the_ Nuclear Regulatory Commission (NRC) inspection conducted by

J. E. Menning on December 24, 1988 - January 20, 1989. The inspection included

a review of activities authorized for your Hatch facility.

At the conclusion

of the inspection, the findings were discussed with those members of your staff

identified in the enclosed Inspection Report.

Areas examined during the inspection are identified in the report.

Within

these areas, the inspection consisted of selective examinations of procedures

and representative records, interviews with personnel, and observation of

'

activities in progress.

The inspection findings indicate that certain activities appeared to violate

NRC requirements.

However, because all of the criteria for categorization of

licensee-identified violations were met, three violations are not being cited.

The details pertaining to these licensee-identified violations are described in

the enclosed Inspection Report.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,

i

Title 10, Code of Federal Regulations, a copy of this letter and its enclosure

will be placed in the NRC Public Document Room.

..

Should you have any questions concerning this letter, please contact us.

Sincerely,

M. B-

-

Alan R. Herdt, Chief

Reactor Projects Branch 3

Division of Reactor Projects

Enclosure:

(See page 2)

8902270492 890216

"

PDR

ADOCK 05000321

\\\\

O

PDC

g

%

l

-

-

-

. _ _ .

. _ .

"-

,,

.

-

.

.

.

Georgia Power Company

2

6 1989

Enclosure:

NRC Inspection Report

cc w/ encl:

R. P. Mcdonald, Executive Vice President,

Nuclear Operations

J. T. Beckham, Vice President, Plant Hatch

H. C. Nix, General Manager, Plant Hatch

0. M. Fraser, Site Quality Assurance

Manager

L. T. Gucwa, Manager, Nuclear Engineering

and Licensing, Plant Hatch

S. B. Tipps, Manager of Nuclear

Safety and Compliance

State of Georgia

bec w/ encl:

L. P. Crocker, NRR

M. V. Sinkule, RII

NRC Resident Inspector

DRS Technical Assistant

Document Control Desk

i

!

RII

RII

/T

AlhY

LTrocine:er

MSinkule

(

02////89

02//g789

!

_._______-_- _ _ - _