ML20235L369
| ML20235L369 | |
| Person / Time | |
|---|---|
| Site: | Hatch |
| Issue date: | 02/16/1989 |
| From: | Herdt A NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Hairston W GEORGIA POWER CO. |
| Shared Package | |
| ML20235L372 | List: |
| References | |
| NUDOCS 8902270492 | |
| Download: ML20235L369 (2) | |
See also: IR 05000321/1988042
Text
-
-.
_
-
_
.-
1
h
.
.
.
i
FEB 161989
Docket Nos. 50-321, 50-366
Georgia Power Company
ATTN: Mr. W. G. Hairston, III
Senior Vice President -
Nuclear Operations
P. O. Box 1295
Birmingham, AL 35201
Gentlemen:
SUBJECT: NRC INSPECTION REPORT NOS. 50-321/88-42 AND 50-366/88-42
This refers to the_ Nuclear Regulatory Commission (NRC) inspection conducted by
J. E. Menning on December 24, 1988 - January 20, 1989. The inspection included
a review of activities authorized for your Hatch facility.
At the conclusion
of the inspection, the findings were discussed with those members of your staff
identified in the enclosed Inspection Report.
Areas examined during the inspection are identified in the report.
Within
these areas, the inspection consisted of selective examinations of procedures
and representative records, interviews with personnel, and observation of
'
activities in progress.
The inspection findings indicate that certain activities appeared to violate
NRC requirements.
However, because all of the criteria for categorization of
licensee-identified violations were met, three violations are not being cited.
The details pertaining to these licensee-identified violations are described in
the enclosed Inspection Report.
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,
i
Title 10, Code of Federal Regulations, a copy of this letter and its enclosure
will be placed in the NRC Public Document Room.
..
Should you have any questions concerning this letter, please contact us.
Sincerely,
M. B-
-
Alan R. Herdt, Chief
Reactor Projects Branch 3
Division of Reactor Projects
Enclosure:
(See page 2)
8902270492 890216
"
ADOCK 05000321
\\\\
O
g
%
l
-
-
-
. _ _ .
. _ .
"-
,,
.
-
.
.
.
Georgia Power Company
2
6 1989
Enclosure:
NRC Inspection Report
cc w/ encl:
R. P. Mcdonald, Executive Vice President,
Nuclear Operations
J. T. Beckham, Vice President, Plant Hatch
H. C. Nix, General Manager, Plant Hatch
0. M. Fraser, Site Quality Assurance
Manager
L. T. Gucwa, Manager, Nuclear Engineering
and Licensing, Plant Hatch
S. B. Tipps, Manager of Nuclear
Safety and Compliance
State of Georgia
bec w/ encl:
L. P. Crocker, NRR
M. V. Sinkule, RII
NRC Resident Inspector
DRS Technical Assistant
Document Control Desk
i
!
RII
RII
/T
AlhY
LTrocine:er
MSinkule
(
02////89
02//g789
!
_._______-_- _ _ - _