Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20199C935 + (08:27:27, 24 May 2025)
- 05000461/LER-1998-028, :on 981205,thermal Induced Pressure Locking of SR Power Operated Gate Valves Was Noted.Caused by Inadequate Initial Design.Evaluated GL 95-07 Valves for Susceptibility to Thermal Induced Pressure Locking + (08:27:47, 24 May 2025)
- ML20199C664 + (08:28:39, 24 May 2025)
- ML20199C661 + (08:28:41, 24 May 2025)
- ML20199C634 + (08:29:08, 24 May 2025)
- ML20199C616 + (08:29:13, 24 May 2025)
- 05000361/LER-1997-014, :on 971020,licensed Operators Did Not Have Corrective Lenses for Use W/Full Face Respirators.Cause Due to Util Not Establishing Administrative Controls for Special Lens Inserts.Improved Associated Procedures + (08:29:29, 24 May 2025)
- ML20199C568 + (08:29:32, 24 May 2025)
- ML20199C486 + (08:29:54, 24 May 2025)
- ML20199C470 + (08:29:58, 24 May 2025)
- TAC:L30987 + (08:30:04, 24 May 2025)
- ML20199C115 + (08:33:15, 24 May 2025)
- IR 05000305/2008005 + (08:33:41, 24 May 2025)
- ML20199B843 + (08:34:17, 24 May 2025)
- ML20199B822 + (08:34:21, 24 May 2025)
- ML20199B806 + (08:34:25, 24 May 2025)
- ML20199B784 + (08:34:30, 24 May 2025)
- ML20199B771 + (08:34:33, 24 May 2025)
- 05000352/LER-1997-014, :on 971222,RHRSW Sys Pump Tripped Due to Spurious Trip Signal Generated by B Radiation Monitor. Replaced Preamplifier Cable for B Radiation Monitor, Cleaned Signal Connectors & Generated CM Action Request + (08:35:55, 24 May 2025)
- ML20199B385 + (08:36:18, 24 May 2025)
- ML20199B375 + (08:36:21, 24 May 2025)
- ML20199B331 + (08:36:35, 24 May 2025)
- ML20199B228 + (08:42:52, 24 May 2025)
- ML20199B175 + (08:43:04, 24 May 2025)
- ML20199B164 + (08:43:07, 24 May 2025)
- 05000272/LER-1996-005, :on 971224,inadequate TS Testing of Containment Airlock Door Gasket Leakage Was Noted.Caused by Lack of Adequate Controls & Understanding of Development. Appropriate Procedures Reviewed + (08:43:14, 24 May 2025)
- 05000341/LER-1996-017-03, Forwards LER 96-017-03 Re Failure of SRVs to Open within Specified TS Required Tolerance.Revised Commitments Made by Util,Listed + (08:43:20, 24 May 2025)
- TAC:M97020 + (08:43:39, 24 May 2025)
- ML20199B050 + (08:43:49, 24 May 2025)
- L-97-060, Forwards Revised EPIPs for NRC Parties IAW 10CFR50.4.Changes Do Not Decrease Effectiveness of Plant & Plan Continues to Meet Requirements of 10CFR50,App E + (08:44:02, 24 May 2025)
- 05000461/LER-1997-033, :on 971218,shift Supervisor Recognized That Containment Bldg Fuel Transfer Pool Ventilation Plenum Exhaust Radiation Monitors Declared Inoperable.Caused by Misinterpretation of Tech Specs.Operations on TS Revised + (08:44:05, 24 May 2025)
- IR 05000220/1997007 + (08:44:19, 24 May 2025)
- IR 05000289/1985027 + (08:44:43, 24 May 2025)
- 05000482/LER-1997-019, :on 971014,failure to Comply W/Ts SR 4.5.2b.1 for Venting of ECCS Pump Casings & Accessible Discharge Piping High Points Discovered.Caused by Personnel Error. Procedure STS BG-002 Revised + (08:45:02, 24 May 2025)
- ML20199A506 + (08:46:31, 24 May 2025)
- IR 05000382/1998016 + (08:46:39, 24 May 2025)
- IR 05000275/1998003 + (08:46:42, 24 May 2025)
- L-98-015, Requests NRC Review & Approval of Proposed Change to BVPS Unit 1 Ufsar.Proposed Rev to UFSAR Change to Address Recent Rev to CR Radiological Dose Calculations + (08:46:48, 24 May 2025)
- ML20199A409 + (08:46:56, 24 May 2025)
- ML20199A394 + (08:46:59, 24 May 2025)
- ML20199A246 + (08:48:49, 24 May 2025)
- ML20199A109 + (08:49:17, 24 May 2025)
- 05000373/LER-1997-045, :on 971223,PAMS Instrumentation Was Noted Outside Design Basis.Caused by Personnel Error.Revised EQ Life Calculation for Affected Components + (08:49:28, 24 May 2025)
- 05000302/LER-1997-035, :on 971016,discovered Inability to Provide RCS Inventory Makeup During Postulated App R Event.Caused by Design Error.Will Provide Alternate Means of Restoring Power to HPI Valves & Will Revise Procedures & Design Drawings + (08:49:38, 24 May 2025)
- ML20198T515 + (08:49:47, 24 May 2025)
- ML20198T507 + (08:49:49, 24 May 2025)
- ML20198T446 + (08:50:05, 24 May 2025)
- 05000423/LER-1997-051, :on 971007,noted Design Deficiency for 4.16kV Feeder Fault Clearing Times.Caused by Inadequate Design Control Process During Implementation.Will Restore Electrical Protection Relaying Scheme for Individual 4.16kV + (08:50:16, 24 May 2025)
- ML20198T367 + (08:50:24, 24 May 2025)
- RC-97-0008, Monthly Operating Rept for Dec 1997 for Virgil C Summer Nuclear Station + (08:50:33, 24 May 2025)
- 05000423/LER-1996-015-05, Forwards LER 96-015-05,documenting Event That Occurred at Plant,Unit 3 on 960610,per 10CFR50.73(a)(2)(ii)(B). Commitments Made within Ltr Submitted + (08:50:49, 24 May 2025)