Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-295/97-19 & 50-304/97-19.Info Provided Supports Licensee Characterization of Occurrence & Violation 5 Rescinded
ML20198T446
Person / Time
Site: Zion  File:ZionSolutions icon.png
Issue date: 01/20/1998
From: Beach A
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Kingsley O
COMMONWEALTH EDISON CO.
References
50-295-97-19, 50-304-97-19, EA-98-006, EA-98-6, NUDOCS 9801270059
Download: ML20198T446 (3)


See also: IR 05000295/1997019

Text

_

_ _ _ _ - _ -

- - -

-

-

-- ------

-+

-

-

- - - - -

.

,

"#

UNf12D STATES

/p.a aseg**g

NUCLEAR REGULATORY COMMIS0lON

f

-

,

REGION ill

'

]

801 WARRENVILLE noAD

e-

E

r

LISLE. ILLINOIS 605324351

\\.....

January 20, 1998

1

EA 98-006

Mr. Oliver D. Kingsley

PresLient, Nm: lear Generation Group

Commonweshh Edison Company

,

ATTN: Regulatory Services

.

^

Executive Towers West til

1400 Opus Place, Suite 500

Downers Grove,IL $0515

SUBJECT:

NOTICE OF VIOLATION (NRC INSPECTION REPORT NO. 50-295/97019(DRP);

50-304/g7019(DRP))

,

Dear Mr. K'ingsley:

This will acknowledge receipt of your letter dated November 3,1997, in response to our letter

dated September 30,1997, transmitting a Notice of Violation associated with Inspection Report

No. 50 295/97019(DRP); 50-304/07019(DRP) for the Zion Station. We have reviewed your

corrective actions and hava no further questions at this time. These corrective actions will be

examined during future inspections,

in your response, you denied that Violation 5, involving a quality control cleanliness inspection

during emergen;y diesel generator starting air check salve installation, was a violatir ; of NRC

requirements. Specifically, you maintained that the quality control cleanliness inspection was

performed correctly and that the manufacturer's material specification tag had become lodged

between the check valve body and air system pipe flange during final assembly after that witness

point had been satisfied. We reviewed pertinent documentation and interviewed personnel

associated with this activity. Information provided supports your characterization of this

occurrence and sve are, therefore, rescinding Violation 5.

'

We also noted that your response to the violation included corrective actions to improve the

staffs understanding and implementation of management's expectations in the areas of work

[

practices anel quality control inspector performance. The corrective actions included briefings of

0

the maintenance staff which stressed the *Stop, Think, Act, and Review" concept and the need

- for a second verification of foreign material exclusion principles. In addition, the quality control

9901270059 990120

fr h

,

f. l }

,

ADOCK 0

295

hDR

wyw

.

_

--

p.-

- - . . .-

. . _

.

.

..

. . .

.

_ -

.

_ .

_ . -

- -

_ - - -

. . . - -

-

'

, ,

!

4

O. Kingsley

2

<

!

department increased the job scope for quality control inspectors to include both quality control

i

i

witness points and the surveillance of job activities These corrective actions appear to be

appropriate and we have no further questions at this time.

i

corely,

)

.

,

A Bill Beach

i

L

Rpglonal Administretor

,

Docket Nc. 50 295

Docket Nc. 50 304

,

cc:

M. Wallace, Nuclear Services

,

Senior Vice President

G. Stanley, PWR Vice President

J. Pony, BWR Vice President

'

D. Farrar, Regulatory

Services Manager

1. Johnson, Licensing Director

DCD - Licensing

J. Brons, Site Vice President

R. Starkey, Plant Ger. oral Manager

R. Godley, Regulatory Assurance

!.

Supervisor

,

Richard Hubbard

fJethan Schloss, Economist

Office of the Attomey General

Mayor, City of Zion .-

Stato Liaison Officer

State Liaison Officer, Wisconsin

Chairman, Illinois Commerce

- Commission

,

,

4

.l

'

(.

'

.. ,.

.

. .

. .

__

_

.

.

-

-

e

'

'

January 20, 1998

G Kingsley

2

department increased the job scope for quality control inspectors to include both quality control

witness points and the surveillance of job activities. These corrective actions appear to be

appropriate and we have no further questions at this time

Sincerely,

/s/ James L Caldwell for

A. Bill Beach

Regional Administrator

Docket No. 50-295

Docket No.50-004

cc:

M. Wallace, Nuclear Services

Senior Vice President

G. Stanley, PWR Vice President

J. Perry, BWR Vice President

D. Farrar, Regulatory

Services Manager

I. Johnson, Licensing Director

DCD - Licensing

J. Brons, Site Vice President

R. Starkey, Plant General Manager

R. Godley, Regulatcry Assurance

Supervisor

Richard Hubbard

Nathan Schloss, Economist

Office of the Attomey General

Mayor, City of Zion

State Liaison Officer

State Liaison Officer, Wisconsin

Chairman, Illinois Commerce

Commission

Distribution:

Docket File

DRP

PUBLIC IE-01

TSS

A.Beadi

DRS (2)

Deputy RA

RlliPRR

Rlli Enf. Coord.

RAC1 (E Mail)

SRI Z'on

CAA1 (E Mail)

Project Mgr., NRR

DOCDESK (E-Mail)

J. Lieberman, OE

R. Zimmerman, NRR

J. Goldberg, OGC

DOCUMENT NAME: 0.Zf0*f tlO97019.TKU

SEE PREVIOUS CONCURRENCES

gy,dv. . ..py .: w 4 .

, ws..t. in ih. b.m c

copy withevi .it. chm.nt/.ne6..ue. t . c py with ett. chm.nt>.ncs..ue.

OFFICE

Rlli

ltf Rill

. O Rlli (

l

Rill

8til Jl / l

NAME

DHills:et bet' KO'BriehM3

HClaytofiM'//

GGrant (RV Kb(Mi

DATE

01/1998

01/f/98' ~

01//R98kf,

01W198 l\\ ()

641/M8

OFFICIAL RECORD COPY

g $se yB 'If,xM

,

ICM k

l

dfh+4]a.

na kwtat c w ewr m %+ j

we