ML20199C661
| ML20199C661 | |
| Person / Time | |
|---|---|
| Site: | Grand Gulf |
| Issue date: | 11/17/1997 |
| From: | Gwynn T NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Hagan J ENTERGY OPERATIONS, INC. |
| References | |
| 50-416-97-99, NUDOCS 9711200083 | |
| Download: ML20199C661 (10) | |
See also: IR 05000416/1997099
Text
--
. - -
-
. - . - ~ - . .- - .
. - . .
.
..-_.- ,- . . - _ _ . _
. .
.
/ "%o
uNiffoSTATES
(
/
,t
NUCLEAR REGULATORY COMMISSION
-
$
. /-
3
RioloN iv
$11 RYAN PLAZA ontvt.sulTE 400
i
' ' '
n
.
ARLINoToN, TE XAS 760118064
" " * *
NOV I 7 997
i
I
Joseph J. Hagan, Vice President
!
Operations Grand Gulf Nuclear Station
Entergy Operations, Inc.
P.O. Box 756
Port Gibson, Mississippi 39150
l
SUBJECT: SYSTEMATIC ASSESSMENT OF LICENSEE PERFORMANCE (SALP) PUBLIC
MEETING (OCTOBER 29,1997)
Dear Mr. Hagan:
i
This refers to the NRC meeting open to public observation conducted on
October 29,1997, at the Grand Gulf Nuclear Station in Port Gibson, Mississippi. This
meeting discussed SALP Report 50 4i6/97 99 which was issued on October 9,1997.
The meeting provided an opportunity for us to communicate our perspectives for each of
the SALP functional areas and our insights into the factors which the NRC considered
when determining the SALP ratings. Attendees at the meeting are listed in Enclosure 1 to
,
'
this letter. Enclosure 2 is a copy of the NRC's presentation slides.
This letter also acknowledges the input provided by Grand Gulf in response to the SALP
report. Your comments addressed both Grand Gulf's and Entergy's perspectives regarding
performance in the different functional areas. The discussions also addressed planned and
in place strategies for improving performance in Plant Support. We look forward to seeing
the results of the Entergy wide initiatives you are planning in the emergency preparednest,
area,
in accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter
will be placed in the NRC's Public Document Room.
Should you have any questions concerning this matter, we will be pleased to discuss them
with you.
.
Sincerely,
'/
'
f 6 4.
)., 4 ~
Thomas P. Gwynn,' Director
Division of Reactor Projects
,
,
Docket No.: 50-416
L! cane.e No.: NPF 29
h h
.-
.
.
.
.
..
--
. - - - - - - .
- .
. - _
_
_ ._-_
_ ~ _ . . _ _ _ _ - . . _ . _ . _ _ _ . . ._ .- _ . _ . - . _
_. _ .. _ ..__ - _ - _ _ -
i
- .
j
i
I
!
Entergy Operations, Inc.
. 2-
l
t
i
!
I
1
Enclosures:
1. Partiallist of Attendees-
2. Visual aids from Public SALP meeting
,
i
t
cc w/ enclosures:
I
Executive Vice President -
and Chief Operating Officer -
Entergy Operations, Inc.
P.O. Box 31995
Jackson, Mississippi 39286 1995
,
t
!
+
- Wise, Carter, Child & Caraway
- P.O. Box 651
-
Jackson, Mississippi 39205
-
.Winston & Strawn
^
1400 L Street, N.W.
12th Floor
Washington, D.C.. .20005 3502
l
Sam Mabry, Director
Division of Solid Waste Management
- Mississippi Pepartment of Natural
+
!
Resources
P.O. Box 10385
i
Jackson, Mississippi 39209
l
3
'
President
Claiborne County Board of Supervisors
Port Gibson, Mississippi 39150
Manager of Operations
,
'
Bechtel Power Corporation
P.O. Box 2166
Houston, Texas 77252 2166
.
!
l
General Manager
,
- Grand Gulf Nuclear Statio .
l
,
. Entergy Operatior's, Inc.
P.O ~ Rox 756
- Pet dibson, Mississippi 39150
,
a
?
..w
.w.
,,. .
..
-
.u.._y.
..m.<,,_+
mM,.-
,,,y.
. . . '
,y.
e
,y,
.
m. y7 ,, yy
y,
, , , -
p.m.,..
,,y..,,
, ,,
- . . _ .
,._ [
'
.
__-_____ _ __
_.
'
J
.
3-
s
Entergy Operations, Inc.
-
The Honorable William J. Guste, Jr.
Attorney General
Department of Justice
State of Louisiana
P.O. Box 94005
Baton Rouge, Loulslana 70804 9005
Office of the Governor
State (./ Mississippi
Jackson, Mississippi 39201
Mike Moore, Attorney General
Frank Spencer, Asst. Attorney General
State of Mississippi
P.O. Box 22947
Jackson, Mississippl 39225
Dr. F. E. Thompson, Jr.
State Health Officer
State Board of Health
P.O. Box 1700
Jackson, Mississippi 39205
Robert W. Goff, Director
State Liaison Officer
Division of Radiation Hea!!h
Mississippi Department of Health
P.O. Box 1700
Jackson, Mississippi 39215 1700
Vice President
Operations Support
Entergy Operations, Inc.
P.O. Box 31995
Jackson, Mississippi 39286 1995
Director, Nuclear Safety
and Regulatory Aff airs
Entergy Operations, Inc.
P.O. Box 756
Port Gibson, Mississippi 39150
m-a
--- .. -
p-s
- - -- +
m
.
.
_
_
l
l..
l
Entergy Operations, Inc.
4
-
Vice President, Operations
~
Grand Gulf Nuclear Station
Entergy Operations, Inc.
P.O. Box 750
Port Gibson, Mississippi 39150
,
V
-
,
- -
t
- - -
s--
w
-
w
- ,
-
g
a
_
__-_ __ _ _______-_ _ ______ - -_____ _ _____-_ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ - _ _ _ _ __ _ - _ _
_
l
'
'
l
.
Entergy Operations, Inc.
-4-
l 7 997
,
hec to DCD (IE40)
'
bec distrib. by RIV:
Regional Administrator
C. A. Hackney, RSLO
DRP Director
DRS PSB
Branch Chief (DRP/G)
MIS System
-
!
Project Engineer (DRP/G)
RIV File
Branch Chief (DRP/TSS)
B. Murray, DRS/PSB
!
'
- The Chairman (MS: 16 G 15)
Records Center, INPO
Deputy Regional Administrator
DRP File
-
Commissioner Dieus
B. Henderson, PAO
Commissioner Diaz
Carol G ;rdon
Commissioner McGaffigan
SRis at all RIV sites
L. J. Callan, EDO (MS: 17 G 21)
Associete Dir, for Projects, NRR
Associate Dir. for Insp., and Tech. Assmt, NRR
!
SALP Program Manager RR/lLPB (2 copies)
-
J. Hannon, NRR Project Director, PDIV 1
J. Donohew, NRR Project Manager
t
DOCUMENT NAME: R:\\_GG\\GG1029MS.DRP
To receive copy of document, Indicate in box: "C" = Copy without enclosures "E" = Copy with er'*sures "N" = No copy
RIV: SRI
C:DRP/F
D:DRP
d
JLDixon-Herrity:df -
DFKirsch
TPGwynn /3 //g>
11/7/97 (DFK)
11/7/97 (E)
11/11197/j
OFFICIAL RECORD COPY
._
_
. .
. .
.
.
, _ .
.
. . . . -
,
_ __
_ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ .
__ _ _ _
_ _ _ _ _ _ - _ _ _ _ _ _ _
Entergy Operations, Inc.
-4-
7.g
.
bec to DCD (IE40)
bec distrib. by RIV:
Regional Administrator
C. A. Hackney, RSLO
DRP Director
DRS PSB
Branch Chief (DRP/G)
MIS System
Project Engineer (DRP/G)
RIV File
Branch Chief (DRP/TSS)
B. Murray, DRS/PSB
The Chairman (MS: 16 G 15)
Records Center, INPO
Deputy Regional Administrator
DRP File
Comrnissioner Dieus
B. Henderson, PAO
Commissioner Diaz
Carol Gordon
Commissioner McGaffigan
SRis at all RIV sites
L. J. Caller . EDO (MS: 17 G 21)
Associate Dir. for Projects, NRR
Associate Dir. for Insp., and Tech. Assmt, NPR
SALP Program Manager, NRR/lLPB (2 copies)
J. Hannon, NRR Project Director, PDIV 1
J. Donohew, NRR Project Manager
DOCUMENT NAME: R:\\_GG\\GG1029MS.DRP
To recetv, copy of document, indicate in boa: "C" = Copy without enclosures
E" = Copy with enclosures "N" = No copy
RIV:SFl
' C:DRP/F
D:0RP
l ,.
,
l
JLDixcn Hernty;df
DFKirsch
TPGwynn
,
I
11/7/97 (DFK)
11/7/97 (E)
11/. /97
"
~
OFFIC:AL RECORD COPY
f
ENCLOSURE 1
l
PARTIAL ATTENDANCE LIST
Jennifer L. Dixon Herrity, Senior Resident inspector, NRC
Jack Donohew, Project Manager, NRC
Ellis W. Merschof f, Regional Administrator, NRC
Kenneth E. Brockman, Deputy Director, Division of Reactor Projects, NRC
Kathy D. Weaver,, Resident inspector, NRC
Charles A. Hackney, State Liaison Officer,NRC
Brock W. Henderson, Public Aff airs Officer, NRC
Thornas G. Hiltz, RIV Coordinator, EDO, NRC
Donald C. Hintz, Group President, Chief Nuclear Operations Officer, EOl
Ron Burns, President and Chief Operating Officer, EOl
Jerry W. Yelverton, Executive Vice President, EOl
Joseph J. Hagan, Vice President Operations, Grand Gulf
Danny G. Bost, Director, Design Engineering, GGNS
William A. Eaton, General Manager, Plant Operations, GGNS
Joseph E. Venable, Manager, Operations, GGNS
Ronald V. Moomaw, Manager, Plant Maintenance, GGNS
Charles W. Elisacsser, Manager, Performance and System Engineering, GGNS
Larry F Dale, Director, Plant Projects and Support, GGNS
Curtley C. Hayes, Director, Quality Programs, GGNS
Kenneth Hughey, Director, Nuclear Safety & Regulatory Aff airs, GGNS
Charles E. Smith, Manager, Planning and Scheduling, GGNS
Robert W. Goff, Director, Mississippi Division of Radiation Health
Stella Moore, Claiborne County Civil Defense
William H. Spell, State of Louisiana
Silas Anderson, Mississippi Radiological Health Physics Administration
Marcus Water, Manager of Production, Southwest Mississippi Electric Power Assoc.
Rick Foster, Director, Tensas Parish Emergency Preparedness
Bob Chapman, Mississippi Emergency Management Agency
Stan Shaw, Louisiana Radiation Protection Division
Bobbie Young, Director, Claiborne County Civil Defense
Charlene Moore, Claiborne County Department of Administration
James Grey, Claiborne County Fire Department
,
!
l
l
l
_______
_
___
_
a
4- !. $
L NITED STATES NUCL
!
REGLLATORY COMMIS
,0 ,
-+
C
gREG O
A
6p
l
$
0
,
+m+
x
'
IN3
$ SYSTEMATIC ASSESSMENT OF
./%
LICENSEE PERFORMANCE
i,
< SALP)
'
'
'
p.
4)d/
%'
,
%
GRAND GL LF
N;
v..
~
\\ucument Potiod;
h February 25,1996 through September 6,1997
g-
2
Prewniation
7
j
October 29,1997
h
. . . _ . - . _ - - _ . . _ _ _ - , _ _ _ . - _ - _ - _ , , . . _ _ _ - - _ _ . . _ . . _ _ .
. _ . , _
. . _ _ , _ . . _ . _ , . - - - _ _ . _
'"
]
..
..
SALP PROCESS
' - - > Resident inspector
Program
Region Based
inspecton
REGIONAL
^
DMINISTRATO
BOARD
-*
""S'"9
Special
Initiatives
->
Event Reviews
_
PPR Process
MIP
<
. .
-.
--
-
-.
-_
-
-
,
i
.
l
GRAND GULF
SALP RATING SUMMARY
,i
j
,
!
4
FUNCTIONAL
RATING
RATING
<
!
AREA
THIS PERIOD
LAST PERIOD
'
OPERATIONS
1
1
MAINTENANCE
1
2
ENGINEERING
1
1
.:
PLANT SUPPORT
2
1
,
i
n
4
r
p
.
.
.
-~-
- .
- . - - . - - - - . - - . - - - - ~ + - - ' - - - - , , -
- - -
-