Requests Util Ref WCAP-11145 to Satisfy Requirements of TMI Action Item II.K.3.31 in Generic fashion.WCAP-11145 Documents Results of Series of Small Break LOCA (SBLOCA) Analyses Performed W/Nrc Approved Notrump SBLOCA EM
ML20199B331
Person / Time
Site: Millstone Dominion icon.png
Issue date: 06/06/1986
From: Opeka J
NORTHEAST NUCLEAR ENERGY CO., NORTHEAST UTILITIES
To: Noonan V
Office of Nuclear Reactor Regulation
References
RTR-NUREG-1031, TASK-2.K.3.31, TASK-TM A05549, A5549, B12109, NUDOCS 8606170114
Download: ML20199B331 (2)


Text

- _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _.__

o NORTHEAST UTILITIES o.nor.i Ome... som n sir..t. s.rnn. connecticut J

.UI v

a c

P.O. BOX 270 a+a *** mana ccva~

HARTFORD. CONNECTICUT 06141-0270 L

t j

[',;* g " y'g ",

(203) 66s-5000 June 6,1986 Docket Nos. 50-423 A05549 B12109 Office of Nuclear Reactor Regulation Attn:

Mr. V. S. Noonan, Director PWR Project Directorate #5 Division of PWR Licensing - A U. S. Nuclear Regulatory Commission Washington, D. C. 20555

Reference:

(1)

T. M. Novak letter to 3. F. Opeka, Issuance of Facility Operating License NPF Millstone Nuclear Power Station, Unit No. 3, dated January 31, 1986.

(2)

B.

3.

Youngblood letter to 3.

F. Opeka, Issuance of Supplement 2 to NUREG-1031, dated September 27, 1985.

Dear Mr. Noonan:

Millstone Nuclear Power Station, Unit No. 3 Small Break LOC A Analysis, TM1 Action Item II.K.3.31 The Millstone Unit No. 3 Operating License (Reference (1)) contains a license condition that requires Northeast Nuclear Energy Company (NNECO) to submit a plant specific analysis utilizing the new NRC approved NOTRUMP Small Break LOCA (SBLOCA) Evaluation Model (EM), as required by TMI Action Plan Item II.K.3.31. In Reference (2), the NRC Staff indicated that the resolution of TMI Action Plan item II.K.3.31 may be accomplished by generic analyses to demonstrate that the previous NRC approved WFLASH SBLOCA EM results were conservative when compared with the new NOTRUMP SBLOCA EM.

Such generic studies were planned by the Westinghouse Owners Group (WOG) of which NNECO is a participating member. The WOG has completed these generic studies and will be submitting the results of the analyses in the topical report WCAP-lll45. This report will be submitted to the NRC on or about June 15, 1986. The purpose of this letter is to inform you that NNECO is referencing topical report WCAP-ill45 in order to satisfy the requirements of TMI Action item II.K.3.31 for Millstone Unit No. 3 in a generic fashion, in accordance with Reference (2).

Topical report WCAP-Ill45 documents the results of a series of Small Break LOCA (SBLOCA) analyses performed with the NRC approved NOTRUMP SBLOCA EM. Cold leg break spectrum analyses were performed for the limiting SBLOCA plant from each of the Westinghouse 4-Icop, 4-loop Upper Head injection (UHl), 3-loop, and 2-!oop plant categories. The limiting SBLOCA plant in each category was defined on the basis of previous SBLOCA pk 8606170114 860606 PDR ADOCK 05000423 80 PDR

~

l

o analyses which were performed with the NRC approved WFLASH SBLOCA EM.

In addition to the cold leg break spectrums, a hot leg and pump suction break were performed as part of the 4-loop plant analyses, confirming that the cold leg was still the worst break location. Comparison of the NOTRUMP cold leg break spectrum results with the previously generated WFLASH results, showed that the WFLASH results were conservative for all plant categories. In particular, the 4-loop plant category results showed that the NOTRUMP SBLOCA EM calculated a limiting Peak Clad Temperature (PCT) which was 5370F less than that previously calculated by the WFLASH SBLOCA EM.

The generic results documented in WCAP-11145, demonstrate that a plant specific reanalysis of the 4-loop Millstone Unit No. 3 plant with the NOTRUMP SBLOCA EM would result in the calculation of a limiting PCT which would be significantly less than the 14830F PCT currently calculated with the WFLASH SBLOCA EM. Hence, the WFLASH SBLOCA EM results which currently form the licensing basis for Millstone Unit No. 3 are conservative and sti'l valid for demonstrating the adequacy of Millstone Unit No. 3's Emergency Core Cooling System to mitigate the consequences of a SBLOCA, as required by 10CFR50.46.

It is therefore concluded that a plant specific analysis is not needed in order for Millstone Unit No. 3 to comply with TMI Action item II.K.3.31. Rather, NNECO references WCAP-ill45 in order to comply with TMI Action Item II.K.3.31 on a generic basis, in accordance with Reference (2). This should satisfy the license condition 2.c (11) of Millstone Unit No. 3 Operating License NPF-49.

If there are any questions, please contact our licensing representative directly.

Very truly yours, NORTHEAST NUCLEAR ENERGY COMPANY

3. F. Opeka_)