Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- IR 05000373/2025001 + (02:10:11, 21 May 2025)
- IR 05000461/2025010 + (02:10:22, 21 May 2025)
- RA-25-0012, Duke Energy, Response to NRC Regulatory Issue Summary 2025-03, Preparation and Scheduling of Operator Licensing Examinations + (02:10:25, 21 May 2025)
- ML25128A084 + (02:10:27, 21 May 2025)
- ML25128A067 + (02:10:29, 21 May 2025)
- EPID:L-2025-LLR-0040 + (02:10:30, 21 May 2025)
- ML25128A052 + (02:10:31, 21 May 2025)
- ML25128A046 + (02:10:33, 21 May 2025)
- RA-24-0291, Duke Energy - Request for Exemptions from 10 CFR 50.55a(a)(3)(ii), Which Incorporates by Reference Regulatory Guide 1.147, Revision 21, for Code Case N-921, and 10 CFR 50.55a(y) + (02:10:35, 21 May 2025)
- ML25128A027 + (02:10:37, 21 May 2025)
- ML25128A021 + (02:10:37, 21 May 2025)
- EPID:L-2025-LRM-0042 + (02:10:38, 21 May 2025)
- ML25128A019 + (02:10:39, 21 May 2025)
- IR 05000528/2025001 + (02:10:48, 21 May 2025)
- ML25128A012 + (02:10:51, 21 May 2025)
- PMNS20250572, Pre-submittal Meeting with Dominion Energy Regarding a Planned Fleet License Amendment Request for Selected Sites to Modify Moderator Temperature Coefficient (Mtc) Technical Specifications (Tss) + (02:10:52, 21 May 2025)
- IR 05000346/2025001 + (02:10:55, 21 May 2025)
- SECY-25-0034, Weekly Information Report Week Ending May 2, 2025 + (02:10:58, 21 May 2025)
- IR 05000390/2025402 + (02:11:00, 21 May 2025)
- ML25127A401 + (02:11:02, 21 May 2025)
- 3F0525-01, 2024 Annual Radiological Environmental Operating Report + (02:11:05, 21 May 2025)
- PNP 2025-032, Submittal of Response to RIS 2025-03, Preparation and Scheduling of Operator Licensing Examinations + (02:11:07, 21 May 2025)
- PNP 2025-030, Correction to 50-Year Containment Tendon Surveillance Inspection Summary Report Supplement + (02:11:11, 21 May 2025)
- ML25127A328 + (02:11:15, 21 May 2025)
- PLA-8178, Response to NRC Regulatory Issue Summary 2025-03 - PLA-8178 + (02:11:17, 21 May 2025)
- GO2-25-081, Cycle 28 Core Operating Limits Report + (02:11:19, 21 May 2025)
- CP-202500130, (CPNPP) - Core Operating Limits Report (Colr), Unit 1 Cycle 25, (ERX-25-001, Revision O & 1) + (02:11:22, 21 May 2025)
- IR 05000271/2025001 + (02:11:26, 21 May 2025)
- ML25127A255 + (02:11:27, 21 May 2025)
- ML25127A220 + (02:11:29, 21 May 2025)
- ML25127A194 + (02:11:30, 21 May 2025)
- EPID:L-2024-LLA-0160 + (02:11:31, 21 May 2025)
- ML25127A190 + (02:11:32, 21 May 2025)
- ML25127A173 + (02:11:34, 21 May 2025)
- IR 05000254/2025001 + (02:11:41, 21 May 2025)
- ML25127A034 + (02:11:44, 21 May 2025)
- IR 05000285/2025002 + (02:11:51, 21 May 2025)
- ML25127A022 + (02:11:53, 21 May 2025)
- EPID:L-2025-NFG-0006 + (02:11:54, 21 May 2025)
- ML25127A015 + (02:11:56, 21 May 2025)
- ML25127A011 + (02:11:57, 21 May 2025)
- ML25127A009 + (02:11:58, 21 May 2025)
- IR 05000237/2025001 + (02:12:01, 21 May 2025)
- ULNRC-06936, Nrg Regulatory Issue Summary 2009-06, Revision 1, Importance of Giving the NRC Advance Notice of Intent to Pursue License Renewal + (02:12:04, 21 May 2025)
- ML25126A293 + (02:12:06, 21 May 2025)
- RA-25-0117, Response to Request for Additional Information (RAI) Regarding Proposed Alternative for Acceptance of Through-wall Flaw in a Reducer Small End Transition Zone + (02:12:09, 21 May 2025)
- RA-25-0124, Response to RAI Regarding Proposed Alternative to Use American Society of Mechanical Engineers (ASME) Code Case N-752, Risk-Informed Categorization and Treatment for Repair/Replacement Activities in Class 2 and 3 Systems Section XI, Divis + (02:12:11, 21 May 2025)
- RA-25-0108, Response to NRC Regulatory Issue Summary 2025-02, Planned Power Uprate-Related Licensing Submittals for All Power Reactor + (02:12:14, 21 May 2025)
- ML25126A227 + (02:12:16, 21 May 2025)
- IR 05000454/2025401 + (02:12:17, 21 May 2025)
- LR-N25-0044, Response to NRC Regulatory Issue Summary (RIS) 2025-02, Planned Power Uprate-Related Licensing Submittals for All Power Reactor Licensees + (02:12:19, 21 May 2025)