SUBJECT:
WATTS BAR NUCLEAR PLANT - CYBER SECURITY INSPECTION REPORT 05000390/2025402 AND 05000391/2025402
Dear Delson C. Erb:
On April 3, 2025, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Watts Bar Nuclear Plant and discussed the results of this inspection with Andrew Waldmann and other members of your staff. The results of this inspection are documented in the enclosed report.
No findings or violations of more than minor significance were identified during this inspection.
This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.
Sincerely, Daniel M. Bacon, Chief Engineering Branch 2 Division of Operating Reactor Safety Docket Nos. 05000390 and 05000391 License Nos. NPF-90 and NPF-96
Enclosure:
As stated
Inspection Report
Docket Numbers:
05000390 and 05000391
License Numbers:
Report Numbers:
05000390/2025402 and 05000391/2025402
Enterprise Identifier:
I-2025-402-0035
Licensee:
Tennessee Valley Authority
Facility:
Watts Bar Nuclear Plant
Location:
Spring City, TN
Inspection Dates:
March 31, 2025 to April 03, 2025
Inspectors:
P. Braaten, Senior Reactor Inspector
D. Rivard, Senior Resident Inspector
M. Shock, Cyber Security Specialist
C. Simpson, Cyber Security Specialist
Approved By:
Daniel M. Bacon, Chief
Engineering Branch 2
Division of Operating Reactor Safety
SUMMARY
The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a cyber security inspection at Watts Bar Nuclear Plant, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.
List of Findings and Violations
No findings or violations of more than minor significance were identified.
Additional Tracking Items
None.
INSPECTION SCOPES
Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2201, Security Inspection Program for Commercial Nuclear Power Reactors. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.
SAFEGUARDS
71130.10 - Cybersecurity
The inspectors reviewed implementation of Watts Bar's Cyber Security Plan (CSP) and focused on evaluating changes to the program, critical systems, and CDAs.
Cybersecurity (1 Sample)
- (1) The following IP sections were completed and constitute completion of 1 sample:
- 03.01, Review Ongoing Monitoring and Assessment Activities
- 03.02, Verify Defense-in-Depth Protective Strategies
- 03.03, Review of Configuration Management Change Control
- 03.05, Evaluation of Corrective Actions
INSPECTION RESULTS
No findings were identified.
EXIT MEETINGS AND DEBRIEFS
The inspectors verified no proprietary information was retained or documented in this report.
- On April 3, 2025, the inspectors presented the cyber security inspection results to Andrew Waldmann and other members of the licensee staff.
DOCUMENTS REVIEWED
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
WBNP U1-261-
0.8(sar)
WBN U1-Process Computer System (261) Security
Assessment Report
Rev. 0
Calculations
WBNP U2-261-
0.4(sar)
WBN U2-Process Computer System (261) Security
Assessment Report
Rev. 0
CR 1899306
WBN - Lost cyber security key
2/20/2023
CR 1899513
Late CR generation related to CR 1899306
2/28/2023
Corrective Action
Documents
CR 1908346
During the performance of WO# 123768690 (1-ODI-15-1)
calibration of 1-FIT-15-42 techs found tamper
2/13/2024
CR 2003587
WBN 2025 Cyber Security Inspection - Authorized Test USB
Drive
04/02/2025
Corrective Action
Documents
Resulting from
Inspection
CR 2003846
25 WBN NRC Cyber Security Inspection Baseline
Configuration Detail
04/03/2025
WB-24-066
Rev. 0
WBN-19-759
Replace Unit 1 ICCM
Rev. 03
WBN-22-022
Replace ICS Data Diode
Rev. 01
Engineering
Changes
WBN-22-048
Rev. 0
L57 200603 801
NPG Portable Media/Device Evaluation for WBN Security
Aegis Flash Drive
2/14/2017
Miscellaneous
SSR 25-0208
WBN-24-066 - Harden WBN-0-XRAY-257-2012 and WBN-0-
XRAY-257-2056
03/12/2025
NPG-SPP-09.3
Plant Modifications and Engineering Change Control
Rev. 39
NPG-SPP-09.5
Temporary Modifications [sic] Temporary Configuration
Changes
Rev, 21
NPG-SPP-12.7
Computer Software Control
Rev. 16
NPG-SPP-
2.8.10
Cyber Security Media Protection
Rev. 03
NPG-SPP-
2.8.15
Cyber Security System and Services Acquisition
Rev. 04
NPg-SPP-12.8.5
Cyber Security Configuration Management
Rev. 08
NPG-SPP-12.8.5
Cyber Security Configuration Management
Rev. 08
NPG-SPP-12.9.1
Cyber Security Access Control
Rev. 14
Procedures
NPG-SPP-14.5
Access Authorization
Rev. 25
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
Perform wireless scans of accessible areas at WBN
10/30/2023
Perform wireless scans of accessible areas at WBN
05/16/2024
Perform wireless scans of accessible areas at WBN
08/07/2024
Perform wireless scans of accessible areas at WBN
10/01/2024
Work Orders
Perform wireless scans of accessible areas at WBN.
11/26/2024