Security Baseline Inspection Report 05000454/2025401 and 05000455/2025401
ML25126A224
Person / Time
Site: Byron  
Issue date: 05/07/2025
From: Michael Ziolkowski
NRC/RGN-III/DRSS
To: Rhoades D
Constellation Energy Generation
References
IR 2025401
Download: ML25126A224 (1)


Text

SUBJECT:

BYRON STATION SECURITY BASELINE INSPECTION REPORT 05000454/2025401 AND 05000455/2025401

Dear David Rhoades:

On April 2, 2025, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Byron Station and discussed the results of this inspection with Z. Cox, Regulatory Assurance Manager, and other members of your staff. The results of this inspection are documented in the enclosed report.

No findings or violations of more than minor significance were identified during this inspection.

This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely, Michael E. Ziolkowski, Chief Security, Emergency Preparedness, and Incident Response Branch Division of Radiological Safety and Security Docket Nos. 05000454 and 05000455 License Nos. NPF-37 and NPF-66

Enclosure:

As stated

Inspection Report

Docket Numbers:

05000454 and 05000455

License Numbers:

NPF-37 and NPF-66

Report Numbers:

05000454/2025401 and 05000455/2025401

Enterprise Identifier:

I-2025-401-0064

Licensee:

Constellation Energy Generation, LLC

Facility:

Byron Station

Location:

Byron, IL

Inspection Dates:

February 10, 2025 through April 02, 2025

Inspectors:

S. Cavanaugh, Physical Security Inspector

Approved By:

Michael E. Ziolkowski, Chief

Security, Emergency Preparedness, and Incident Response Branch

Division of Radiological Safety and Security

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a security baseline inspection at Byron Station, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors.

Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.

List of Findings and Violations

No findings or violations of more than minor significance were identified.

Additional Tracking Items

None.

INSPECTION SCOPES

Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2201, Security Inspection Program for Commercial Nuclear Power Reactors. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.

SAFEGUARDS

71130.02 - Access Control

The inspectors evaluated the access control program through completion of the following

inspection elements: Access Control

(1)

1. Tier I: All Requirements

2. Tier II: Tier II: 02.06 a-d ; 02.07 a ; 02.08 a - e, i

3. Tier III:02.09

71130.07 - Security Training

The inspectors evaluated the security training program through completion of the following

procedure elements: Security Training

(1)

4. Tier I: All Requirements

5. Tier II: 2.05 a -d ; 2.06 a-b ; 2.07 a ; 2.08 a ; 2.09 a

6. Tier III: 02.10 ; 02.11 a ; 02.12 a - b ; 02.13 a - c

71130.09 - Security Plan Changes

The inspectors evaluated the security plan changes through completion of the following procedure elements:

Security Plan Changes (1 Partial)

(1)

(Partial)

The opportunity to apply this procedure was not available in accordance with IMC 0306. This sample was not available because the licensee did not conduct the activity covered by this IP. Specifically, the licensee has not initiated a physical security plan change in accordance with 10 CFR 50.54(p(2) since the last performance of this IP.

OTHER ACTIVITIES - BASELINE

===71151 - Performance Indicator Verification The inspectors verified licensee performance indicators submittals listed below:

PP01: Protected Area Security Equipment Performance Index Sample (IP Section 02.17)

=

(1) February 1, 2024 through February 1,

INSPECTION RESULTS

No findings were identified.

EXIT MEETINGS AND DEBRIEFS

The inspectors verified no proprietary information was retained or documented in this report.

  • On April 2, 2025, the inspectors presented the security baseline inspection results to Z.

Cox, Regulatory Assurance Manager, and other members of the licensee staff.

DOCUMENTS REVIEWED

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

Corrective Action

Documents

AR 04828466

01/09/2025

Miscellaneous

Access Authorization List

2/10/2025

SY-AA-101-112

Constellation Search Process

SY-AA-101-112-

104

Protected Area Search Process

SY-AA-101-117

Escort Security Regulations

SY-AA-101-117

Visitor Security Regulations

SY-AA-101-117-

F-03

Visitor/Vehicle Registration Log

2/08/2025

SY-AA-101-130

Security Responsibilities for Station Personnel

SY-AA-101-145-

F-13

Special Purpose Detector Test Log

SY-AA-103-500

Access Authorization Program

SY-AA-103-514

Site Authorization for Unescorted Access

Procedures

SY-BY-101-116-

1002-F-02

PA Vehicle Key Check

71130.02

Self-Assessments

AR 04811415

71130.02 Access Control

2/18/2024

2521

Active FM Order

2/29/2024

13457

Active FM Orders

03/17/2025

Corrective Action

Documents

AR 04776108

05/23/2024

13480

Facilities Ticket

03/20/2025

Corrective Action

Documents

Resulting from

Inspection

AR 4847485

03/21/2025

Staffing Roster

03/17/2025

Security Aid

Security Aid

Miscellaneous

Security Aid

SY-AA-101-145-

F-06

BRE Material Condition Checklist

04/13/2024

SY-AA-150-103-

F-04

Functionality Test

SY-AA-150-103-

F-14

Rifle Accuracy Test

SY-AA-150-105

Physical Fitness Test

Procedures

SY-AA-500-127

Safety/Security Interface

71130.07

Self-Assessments

NOSA-BYR-25-

Security Program Audit Report

2/28/2025

Physical Security Plan

Procedures

SY-AA-101-102

Compensatory Procedure

71130.09

Self-Assessments

AR 4822529

Security Program Audit Report

2/28/2025

Corrective Action

Documents

SER/IR/AR

2/11/2025

71151

Self-Assessments

AR 4811417

Performance Indicator Self-Assessment

2/10/2025