Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20009F955 + (13:12:46, 21 December 2024)
- 05000259/LER-1981-033-03, /03L-0:on 810614,during Refueling,Total as-found Primary Containment Leak Rate Exceeded Tech Spec Limit. Caused by Deterioration of Valve Seating Surfaces During Operation.Valves Repaired + (13:12:48, 21 December 2024)
- 05000281/LER-1981-040-03, /03L-0:on 810626,boric Acid Storage Tank a Overflowed Into Boric Acid Storage Tank C,Diluting Tank C Below Tech Spec Limits.Caused by Inadvertent Alignment of Primary Grade Water to Suction of Boric Acid Transfer Pump + (13:12:49, 21 December 2024)
- IR 05000295/1981009 + (13:12:58, 21 December 2024)
- ML20009F943 + (13:13:00, 21 December 2024)
- IR 05000029/1981007 + (13:13:03, 21 December 2024)
- IR 05000266/1981014 + (13:13:06, 21 December 2024)
- ML20009F936 + (13:13:07, 21 December 2024)
- ML20009F932 + (13:13:10, 21 December 2024)
- ML20009F930 + (13:13:11, 21 December 2024)
- ML20009F929 + (13:13:12, 21 December 2024)
- IR 05000483/1981016 + (13:13:13, 21 December 2024)
- ML20009F926 + (13:13:15, 21 December 2024)
- ML20009F923 + (13:13:16, 21 December 2024)
- ML20009F921 + (13:13:17, 21 December 2024)
- BSEP-81-1282, Ro:On 810627,during Normal Reactor startup,A-loop RHR in LPCI Mode Valve Lineup Determined Incorrect.Caused by Possible Personnel Error.Investigation Ongoing to Ascertain Exact Cause Which Will Be Reported in 14-day Followup + (13:13:18, 21 December 2024)
- 05000348/LER-1981-043-03, /03L-0:on 810602,sequencer Associated W/Diesel Generator Failed to Meet Time Requirement for Picking Up Step 2.Caused by Setpoint Drift.Agastat Timer Adjusted & Sequencer Returned to Svc + (13:13:20, 21 December 2024)
- ML20009F918 + (13:13:21, 21 December 2024)
- ML20009F917 + (13:13:21, 21 December 2024)
- ML20009F915 + (13:13:22, 21 December 2024)
- 05000348/LER-1981-042-03, /03L-0:on 810610,pump Supplying Containment Atmosphere Particulate & Gaseous Radioactivity Monitoring Sys Failed to Start.Caused by Filter Paper Not Advancing Due to Paper Drive Malfunction.Drive Mechanism Adjusted + (13:13:23, 21 December 2024)
- ML20009F913 + (13:13:24, 21 December 2024)
- L-81-216, Interim Deficiency Rept Re Transverse Indications in Bf Shaw Supplied Containment Spray Piping,Previously Reported on 810421.Final Rept W/Evaluation Results & Necessary Corrective Actions to Be Taken Will Be Submitted by 810722 + (13:13:25, 21 December 2024)
- ML20009F911 + (13:13:27, 21 December 2024)
- 05000348/LER-1981-041-03, /03L-0:on 810606,diesel Generator Found Incapable of Automatically Starting Due to locked-in Low Lube Oil Pressure Alarm.Caused by Inadequate Procedural Guidance. Procedures Revised + (13:13:28, 21 December 2024)
- 05000269/LER-1981-011-01, /01T-0:on 810715,during Visual Exam of Reactor Vessel Internal Components,Thermal Shield Bolts & Guide Block Discovered Missing.Cause Not Determined.Program Defined to Determine Cause & Effect Repairs + (13:13:30, 21 December 2024)
- ML20009F908 + (13:13:31, 21 December 2024)
- ML20009F906 + (13:13:32, 21 December 2024)
- 05000269/LER-1981-011, Forwards LER 81-011/01T-0.Detailed Event Analysis Encl + (13:13:33, 21 December 2024)
- ML20009F903 + (13:13:34, 21 December 2024)
- 05000335/LER-1981-026-03, /03L-0:on 810529,during Full Power Control Element Assembly Exercising,Linear Reed Switch Position Indication for Control Element Assembly 30 Failed.Cause Undetermined. Investigation Planned During Next Outage + (13:13:35, 21 December 2024)
- ML20009F901 + (13:13:37, 21 December 2024)
- 05000335/LER-1981-026, Forwards LER 81-026/03L-0 + (13:13:38, 21 December 2024)
- ML20009F898 + (13:13:39, 21 December 2024)
- ML20009F897 + (13:13:40, 21 December 2024)
- ML20009F895 + (13:13:41, 21 December 2024)
- ML20009F893 + (13:13:42, 21 December 2024)
- ML20009F892 + (13:13:42, 21 December 2024)
- 05000327/LER-1981-062-03, /03L-0:on 810531,following Reactor trip,turbine- Driven Auxiliary Feedwater Pump Failed to Deliver Full Flow. Caused by Speed Control Setpoint Drift.Trimpot Adjusted. Locking Nut Tightened & Locking Putty Applied + (13:13:43, 21 December 2024)
- ML20009F890 + (13:13:44, 21 December 2024)
- 05000327/LER-1981-062, Forwards LER 81-062/03L-0 + (13:13:45, 21 December 2024)
- 05000324/LER-1981-051-03, /03L-0:on 810608,during Operability Testing,When Manual Start Was Initiated,Diesel Generator 4 Started & Then Stopped.Caused by Moisture in Run Control Solenoid Valve, Model X53-HM-2150.Moisture Removed + (13:13:47, 21 December 2024)
- 05000281/LER-1981-039-03, /03L-0:on 810623,periodic Testing Disclosed RWST Chloride Concentration Exceeded Limits.Caused by Leakage Through MOV-CS-202A & B from Chemical Addition Tank. MOV-CS-202B Isolated.Sensitized Piping Flushes Performed + (13:13:52, 21 December 2024)
- 05000324/LER-1981-051, Forwards LER 81-051/03L-0 + (13:13:53, 21 December 2024)
- 05000281/LER-1981-039, Forwards LER 81-039/03L-0 + (13:13:55, 21 December 2024)
- 05000259/LER-1981-040-03, /03L-0:on 810625,during Testing,Grinnell Snubber SS7 Was Found Low on Fluid.Caused by Leak at Threaded Connection Between Fluid Reservoir & Snubber.Grinnell Model F-16200,Size 2.5,Type HSSA-10 Snubber (Sn 10734) Rebuilt + (13:13:57, 21 December 2024)
- IR 05000245/1981006 + (13:14:01, 21 December 2024)
- ML20009F879 + (13:14:02, 21 December 2024)
- 05000259/LER-1981-040, Forwards LER 81-040/03L-0 + (13:14:03, 21 December 2024)
- ML20009F874 + (13:14:05, 21 December 2024)
- ML20009F875 + (13:14:05, 21 December 2024)