ML20009F923
| ML20009F923 | |
| Person / Time | |
|---|---|
| Site: | Callaway |
| Issue date: | 07/20/1981 |
| From: | Norelius C NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Bryan J UNION ELECTRIC CO. |
| Shared Package | |
| ML20009F924 | List: |
| References | |
| NUDOCS 8108030168 | |
| Download: ML20009F923 (2) | |
See also: IR 05000483/1981016
Text
'
.
-
.
'JUL '2 0 C
.
N
/s*
- %
Q ,' '
Docket No. 50-483
[
}
Union Electric Company
's7
JUL 3119815 [3
ATTN:
Mr. John K. Bryan
Vice President - Nuclear
-.
og
couns o<
'7
Post Office Box 149
W,M. .
St. Louis, MO 63166
\\r/
\\
oT
Gentlemen:
This refers to the routine safety inspection conducted by Mr. F. C. Hawkins
of this office on July 8-9, 1981, of activities at Callaway, Unit 1,
Construction Site, authorized by NRC Construction Permit No. CPPR-139 and
to the discussion of our findings with Mr. Veatch of the Callaway staff
at the conclusion of the inspection.
The enclosed copy of our inspection report identifies areas examined during
the inspection. Within these areas, the inspection consisted of a selective
examination of procedures and representative records, observations, and
interviews with personnel.
No items of noncompliance with NRC requirements were identified during
the course of this inspection,
j
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy
'
of this letter and the enclosed inspection report will be placed in the
NRC's Public Document Room.
If this report contains any information that
you or your contractors believe to be exempt from disclosure under 10 CFR 9.5(a)(4), it is necessary that you (a) notify this office by telephone
within seven (7) days from the date of this letter of your intention to
file a request for withholding; and (b) submit within twenty-fiv (25)
days from the date of this letter a written application to this office to
withhold such information.
Section 2.790(b)(1) requires that any such
application must be accompanied by an affidavit executed by the owner of
the information which identifies the document or part sought to be withheld,
and which contains a full statement of the reasons on the basis which it
is claimed that the information should be withheld from public disclosure.
fpll
s'I
8108030168 810720
PDR ADOCK 05000483
G
\\
- - - .
_ . - - .
.
-.
- - _ . - _ -
. _
- - .
-_, ,_
. -
. . , , - _
.N
.
.
.
l
m 2 0 198I
I
Union Electric Company
-2-
This section further requires the statement to address with specificity
the considerations listed in 10 CFR 2.790(b)(4). The information sought
to be withheld shall be incorporated as far as possible into a separate
part of the affidavit.
If we do not hear from you in this regard within
the specified periods noted above, a copy of this letter and the enclosed
,
!
inspection report will be placed in the Public Document Room.
!
We will gladly discuss any questions you have concerning this inspection.
Sincerely,
,
.
C. E. Norelius, Acting Director
Division of Engineering and
Technical Insjection
Enclosure:
IE Inspection
Report No. 50-483/81-16
cc w/ encl:
W. H. Weber, Manager
Nuclear Construction
DMB/ Document Control Desk (RIDS)
Resident Inspector, RIII
i
Region IV
j
h. Drey
Ronald Fluegge, Utility
'
Division, Missouri Public
Service Commission
f
I
,
- !
RII
\\N
RIII
RII
RIII
RIII
l
$
'.;il{iams
/Ee
f6f
!
Hawkins/db
W
Sp,ssard
Kon lin
Noelp.s
7/16/81
1