Forwards IE Insp Repts 50-352/81-10 & 50-353/81-08 on 810615-30 & Notice of Violation
ML20009F893
Person / Time
Site: Limerick  Constellation icon.png
Issue date: 07/15/1981
From: Keimig R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Kemper J
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
Shared Package
ML20009F894 List:
References
NUDOCS 8108030144
Download: ML20009F893 (2)


See also: IR 05000352/1981010

Text

.

.

Q 08c

UNITED STATES

oq

.

,d_

jo

NUCLEAR REGULATORY COMMisslON

'

g

y))w(

g

REGION I

5.K

j

631 l' ARK AVENUE

g %'^

/g

KING OF PRUSSIA, PENNSYL VAN.A 19406

%, *~*

JUL 151981

Donket Nos. 50-352

50-353

Philadelphia Electric Company

ATTN: Mr. John S. Kemper

Vice President

Engineering and Research

2301 Market Street

Philadelphia, Pennsylvania

19101

Gentlemen:

Subject: Combined Inspection Report Nos. 50-352/81-10 and 50-353/81-08

This refers to the routine safety inspection conducted by Mr. J. Durr of this

office on June 15-30, 1981, at Limerick Generating Station, Units 1 and 2,

Limerick, Pennsylvania of activities authorized by NRC License Nos. CPPR-106

and CPPR-107 and to the discussions of our findings held by Mr. Durr with

Mr. J. M. Corcoran of your s'.-ff at the ccnclusion of the inspection.

Areas examined during this inspection are described in the Office of Inspection

and Enforcement Inspection Report which is enclosed with this letter. Within

these areas, the inspection consisted of selective examinations of procedures

'

and representative records, interviews with personnel, measurements made by the

inspector, and observations by the inspector.

Based on the results of this inspection, it appears that one of your activities

was not conducted in full compliance with NRC requirements, as set forth in the

Notice of Violation, enclosed herewith as Appendix A.

This item of noncompliance

has been categorized into the levels described in the Federal Register Notice (45 FR 66754) dated October 7, 1980.

You are required to respond to this letter and

i

I

in preparing your response, you should follow the instructions in Appendix A.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this

!

letter and the enclosures will be placed in the NRC's Public Document Room.

If

I

this report contains any information that you (or your contractors) believe to be

exempt from disclosure under 10 CFR 9.5(a)(4), it is necessary that you (a) notify

this office by telephonc within ten (10) days from the date of this letter of

your intention to file a re uest for withholding; and (b) submit within 25 days

from the date of this letter a written application to this office to withhold

,

!

I

such infomation. Consistent with Section 2.790(b)(1), any such application must

be accompanied by an affidavit executed by the owner of the infomation which

identifies the document or part sought to be withheld, and which contains a full

!

statement of reasons on the basis which it is claimed that the information should

be withheld from public disclosure. This section further requires the statement

to address with specificity the consideratione iisted in 10 CFR 2.790(b)(4). The

information sought to be withheld shall be incorporated as far as possible into a

TEp/

5

8108030144 810715

l

PDR ADOCK 05000352

lf

O

PDR

.-

.

.

.

.

QppL153BB1

Philadelphia Electric Company

2

separate part of the affidavit.

If we do not hear from you in this regard with-

in the specified periods noted above, the report will be placed in the Public

Document Room.

The telephone. notification of your intent to request withholding,

or any request for an extension of the 10 day period which you believe necessary,

should be made to the Supervisor, Files, Mail and Records, USNRC Region I, at

(215) 337-5223.

Should you have any questions concerning this inspection, we will be pleased to

discuss them with you.

Sincerely,

.

.

';;= &

R. R. Kelmig, d ef

Projects Branch No. 2, Division of

Resident and Project Inspection

Enclosures:

1.

Appendix A, Notice of Violation

2.

Combined Office of Inspection and Enforcement Inspection

Report Numbers 50-352/81-10 and 50-353/81-08

cc w/encls:

V. S. Boyer, Senior Vice President, Nuclear Power

Troy B. Corner, Jr. , Esquire (Without Report)

Eugene J. Bradley, Esquire (Without Report)

.