g.
.
'
)fth 'q'a
UNITED STATES
8^
~N
NUCLEAR REGULATORY COMMISSION
$
,$
REG!ON I
631 PARK AVENUE
ej
g
%
,e
KING OF PRUSSIA, PENNSYLVANIA 19406
JUL 141981
Docket Nos.
50-245
50-336
Northeast Nuclear Energy Company
ATTN: Mr. W. G. Counsil
Senior Vice President - Nuclear
Engineering and Operations
P.O. Box 270
Hartford, Connecticut 06101
Gentlemen:
Subject: Combined Inspection 50-245/81-CS and 50-336/81-05
This refers to the routine inspection conducted by Mr. J. Shedlosky of this
office on April 5 through May 16, 1981 at the Millstone Nuclear Power.
Station, Waterford, Connecticut, of activities authorized by NRC. License
Nos. DPR-21 and DPR-85 and to the discussions of our findings held by
Mr. Shedlosky with Mr. Mroczka and other members of your staff periodically
during the inspection.
Areas examined during this inspection are described in the Office of Inspection
and Enforcement Inspection Report which is enclosed with this letter. Within
these areas, the inspection consisted of selective examinations of procedures
and representative records, interviews with pedonnel, measurements made by the
inspector, and observations by the inspector.
Based on the results of this inspection, it appears that one of your activities
was not conducted in full compliance with NRC requirements, as set forth in the
Notice of Violation, enclosed herewith as Appendix A.
This item of noncompliance
has been categorized into f2e levels described in the Federal Register Notice
(45 FR 66754) dated October 7,1980. This notice is sent to you pursuant to the
i
provisions of Section 2.201 of the NRC's " Rules of Practice," Part 2, Title 10,
l
Code of Federal Regulations. Although Section 2.201 requires you to submit to
l
this office, within 2E days of your receipt of this notice, a written statement
l
of explanation, we note that this item of noncompliance was corrected prior to
l
the completion of our inspection, and therefore, no response with respect to
this matter is required.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy
of this letter and the enclosures will be placed in the NRC's Public Document
Room.
If this report contains any infomation that you (or your contractors)
believe to be exempt from disclosure under 10 CFR 9.5(a)(4), it is necessary
1
TEDl
s
/
8108030130 810714
DR ADOCK 05000
l
<
>
- -
.
.
JUL 141981
Northeast Nuclear Energy Company
2
that you (a) notify this office by telephone within ten (10) days from the
date of this letter of your intention to file a request for withholding; and
(b) submit within 25 days from the date of this letter a written application tc
this office to withhold such information.
Consistent with section 2.790(b)(1),
any such application must be accompanied by an affidavit executed by the owner of
the information which identifies the document or part sought to be withheld, and
which contains a full statement of the reasons on the basis which it is claimed
that the information should be withheld from public disclosure. This section
further requires the statement to address with specificity the considerations
listed in 10 CFR 2.790(b)(4). The information sought to be withheld shall be
incorporated as far as possible into a separate part of the affidavit.
If we do
not hear fron you in this regard within the specified periods noted above, the
report will be placed in the Public Document Room. The telephone notification
of your intent to request witnholding, or any request for an extension of the
10 day period which you believe necessary, should be made to the Supervisor,
Files, Mail and Records, USNRC Region I, at (215) 337-5223.
No reply to this letter is required; however, if you should have any questions
concerning this inspection, we will be pleased to discuss them with you.
Sincerely,
./
.
.
1
'J. Brunner, Acting Director,
Division of Resident and Project
Inspection
Enclosure:
Office of Inspection and Enforcement Combined
Inspection Report Number 50-245/81-06 and 50-336/81-05
cc w/ encl:
J. F. Opeka, Vice President Nuclear Operations
E. J. Mroczka, Station Superintendent
D. G. Diedrick, Manager of Quality Assurance
J. R. Himmelwright, Licensing Safeguards Engineer