ML20009F932
| ML20009F932 | |
| Person / Time | |
|---|---|
| Site: | Point Beach |
| Issue date: | 07/20/1981 |
| From: | Norelius C NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Burstein S WISCONSIN ELECTRIC POWER CO. |
| Shared Package | |
| ML20009F933 | List: |
| References | |
| NUDOCS 8108030174 | |
| Download: ML20009F932 (2) | |
See also: IR 05000266/1981014
Text
{{#Wiki_filter:__ . _ _ - _- i , JtR 2 0 G31 N Docket No. 50-266 N ' - s Wisconsin Electric Power Company ] [[ h ATTN: Mr. Sol Burstein - - Executive Vice President Y dUL ll 1198] n. 73 Power P1 ants - u.s.nxum m ; ' "55CH 231 West Michigan 3 g Milwaukee, WI 53201 7 ,) , Gentlemen:
This refers to the routine safety inspection conducted by Mr. K. D. Ward of this office on July 9, 1981, of activities at the Point Beach Nuclear Plant, Unit 1, authorized by NRC Operating License No. DPR-24 and to the discussion of our findings with Mr. G. Reed and others of your staff at the conclusion of the inspection. The enclosed copy of our inspection report identifies areas examined during the inspection. Within these areas, the inspection consisted of a selective examination of procedures and representative records, observations, and interviews with personnel. No items of noncompliance with NRC requirements were identified during the course of this inspection. In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this letter and the enclosed inspection report will be placed in the , NRC's Public Document Room. If this report contains any information that you or your contractors believe to be exempt from disclosure under 10 CFR ' 9.5(a)(4), it is necessary that you (a) notify this office by telephone ( within seven (7) days from the date of this letter of your intention to
file a request for withholding; and (b) submit within twenty-five (25) days from the date of this letter a written application to this office to ' withhold such information. Section 2.790(b)(1) requires that any such application must be accompanied by an affidavit executed by the owner of the information which identifies the document or part sought to be withheld, I and which contains a full statement of the reasons on the basis which it l is claimed that the information should be withheld from public disclosure. f 8108030174 810720 PDR ADOCK 05000266 % ' G PDR l - - - - - - -
F . . Wisconsin Electric Power -2- Company dUl. 2 O ON This section further requires the statement to address with specificity the considerations listed in 10 CFR 2.790(b)(4). The information sought to be withheld shall ee incorporated as far as pcssible into a separate part of the affidavit. If we do not hear from you in this regard within the specified periods noted above, a copy of this letter and the enclosed inspection report will be placed in the Public Document. Room. We will gladly discuss any questions you have concerning this inspection. Sincerely, 8 M. Toub C. E. Norelius, Acting Director Division of Engineering and Technical Inspection Enclosure: IE Inspection Report No. 50-266/81-14 cc w/ encl: G. A. Reed, Manager DMB/ Document Control Desk (RIDS) Resident Inspector, RIII John J. Duffy, Chief Boiler Inspector Peter Anderson, Wisconsin's Environmental Decade Stanley York, Chairman Public Service Commission . s hlII RIII IJI RILI RIII wQ. Da'n/\\' YeAq n \\f Spels,ard Nb k%I Wr/,b Konklin , 7/14/81 \\ 1 ~ }}