Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20032C655 + (16:39:08, 20 December 2024)
- L-81-470, Interim Deficiency Rept Re Failure to Follow Radiographic Procedures for safety-related Welds.Originally Reported on 810312.Date for Completion of Corrective Action Cannot Be Provided + (16:39:09, 20 December 2024)
- ML20032C650 + (16:39:13, 20 December 2024)
- ML20032C647 + (16:39:15, 20 December 2024)
- ML20032C644 + (16:39:17, 20 December 2024)
- ML20032C643 + (16:39:18, 20 December 2024)
- PNO-II-81-085A, on 811007,determined Eleven Fuel Assemblies Have Abnormal Fuel Degradation Due to Accelerated Corrosion.Reload 2 Assemblies to Be Replaced w/48 New Pressurized Fuel Assemblies of 8x8 Pr Type + (16:39:20, 20 December 2024)
- ML20032C640 + (16:39:22, 20 December 2024)
- 05000338/LER-1981-075, Forwards LER 81-075/03L-0 + (16:39:24, 20 December 2024)
- ML20032C637 + (16:39:25, 20 December 2024)
- ML20032C636 + (16:39:27, 20 December 2024)
- ML20032C635 + (16:39:28, 20 December 2024)
- ML20032C633 + (16:39:29, 20 December 2024)
- ML20032C632 + (16:39:30, 20 December 2024)
- ML20032C631 + (16:39:31, 20 December 2024)
- ML20032C630 + (16:39:33, 20 December 2024)
- ML20032C626 + (16:39:35, 20 December 2024)
- ML20032C625 + (16:39:37, 20 December 2024)
- ML20032C624 + (16:39:37, 20 December 2024)
- ML20032C623 + (16:39:38, 20 December 2024)
- ML20032C622 + (16:39:39, 20 December 2024)
- ML20032C621 + (16:39:41, 20 December 2024)
- FVY-81-154, Responds to NRC Requesting Addl Info Re Implementation of NUREG-0737 Item II.K.3.44, Evaluation of Anticipated Transients W/Single Failure. Generic Analysis in GE BWR Owners Group Rept Is Representative + (16:39:42, 20 December 2024)
- ML20032C619 + (16:39:43, 20 December 2024)
- IR 05000267/1981018 + (16:39:44, 20 December 2024)
- ML20032C615 + (16:39:45, 20 December 2024)
- ML20032C614 + (16:39:47, 20 December 2024)
- PNO-I-81-119, on 811029,unknown Male Called Twice W/Bomb Threat Inside Plant Bldg.Plant Evacuated & Searched W/ Negative Results.No Further Action Anticipated + (16:39:49, 20 December 2024)
- ML20032C612 + (16:39:50, 20 December 2024)
- ML20032C611 + (16:39:52, 20 December 2024)
- 2CAN108110, Forwards Cycle 2 Startup Rept to NRC for Period Ending 810819 + (16:39:53, 20 December 2024)
- ML20032C608 + (16:39:55, 20 December 2024)
- ML20032C606 + (16:39:56, 20 December 2024)
- ML20032C605 + (16:39:57, 20 December 2024)
- ML20032C603 + (16:39:58, 20 December 2024)
- ML20032C602 + (16:39:59, 20 December 2024)
- ML20032C601 + (16:40:00, 20 December 2024)
- ML20032C596 + (16:40:06, 20 December 2024)
- ML20032C595 + (16:40:08, 20 December 2024)
- ML20032C594 + (16:40:09, 20 December 2024)
- FVY-81-151, Forwards Addl Info Re Retran Analysis for Cycle 9 Reload Calculations.Retran Output Listing Withheld (Ref 10CFR2.790).Affidavit Encl + (16:40:15, 20 December 2024)
- ML20032C590 + (16:40:29, 20 December 2024)
- ML20032C589 + (16:40:31, 20 December 2024)
- ML20032C587 + (16:40:32, 20 December 2024)
- 05000348/LER-1981-069-03, /03L-0:on 810929,charging Pump 1B Determined Electronically Aligned to Bus W/No Available Emergency Power Supply & Declared Inoperable.Caused by Personnel Error When Pump Aligned to Wrong Train.Personnel Trained + (16:40:33, 20 December 2024)
- ML20032C585 + (16:40:35, 20 December 2024)
- ML20032C584 + (16:40:35, 20 December 2024)
- ML20032C583 + (16:40:37, 20 December 2024)
- ML20032C581 + (16:40:38, 20 December 2024)
- ML20032C579 + (16:40:40, 20 December 2024)
- 05000339/LER-1981-075-03, /03L-0:on 811003,during Hot Standby,Containment Isolation Trip Valve Failed to Close Upon Receipt of Phase a Containment Isolation Signal.Cause Unknown.Valve Cycled Properly & Penetration Returned to Normal + (16:40:42, 20 December 2024)