w m Docket No. 50-334 NOV 2 1981 h.
Duquesne Light Company
}
ATTN: Mr. J. J. Carey Vice President S-NOV0' 91981> di :r Nuclear Division vis.iu n m aa m oIB
~
Post Office Box 4 N8 9
p Shippingport, Pennsylvania 1E077 b
Gentlemen:
m This letter refers to a meeting between Mr. J. J. Carey, Vice President and members of his staff, and Mr. S. H. Chesnut, Team Leader, and other members of the NRC Emergency Preparedness Implementation Appraisal Team, which was held at the Beaver Valley Power Station on October 15, 1981, and to a telephone conversation Mr. Kenneth Grada of your staff and Mr.
G. L. Snyder of my staff on October 28, 1981. With regard to the matters relating to emergency preparedness discussed at that meeting, we understr.nd that you will undertake and complete the following actions:
1.
Revise the emergent.y organization, the BVPS Emergency Plan and implementing procedures to provide for performing required emergency functior.s at your Emergency Operations Facility (EOF). Specifically, the EOF staff should be responsible for performing the functions of (a) overall management of your emergency response, (b) radiolegical/ environmental assessment and (c) offsite protective action recommendations.
These actions wi ' be completed by December 1, 1981, with the exception that the performance of the function of radiologi-cal / environmental assessment from the EOF will be implemented by December 31, 1981.
2.
Pursuant to the requirements of the generic letter dated February 18, 1981 to all licensees from Mr. D. Eisenhut, NRR, regarding the minimum staffing requirements % r nuclear power plant emergencies, a study shall be performea to determine how the augmentation of the onshift staff can be achieved wiu,in the 30 and 60 minute goa b of NUREG 0654, Table B-1 after the declaration of an emergency.
The results of this study will be documented and forwarded to the NRC for review and evaluation along with a description of compensatory measures for any au mentation goals not met.
Crocker es nyder ith fi St%#stecki Al H
s DEPOS DEPOS j DEPOS / DEPOS E
DRPI DE LIR DIR c
10/28/81 10/g/81 10 /81 10 /81 1 /p/81 10/f81 10/ 0/81 10fN 81 3
phpieWS!!![M d
j$^ F
Duquesne Light Co. 2 NOV 2 1381 The results of the study will be made available no later than December 31, 1981. 3. Complete implementation of the planned energenc/ preparedness training program. Specifically, complete the preparation of lesson plans and conduct the specialized emergency training outlined in the BVPS Emergency Plan for your personnel and offsite support organizations. The portions of i.his training program designed for your Emergency Directors, Emergency Recovery Managers, Dos Projection Coordinators, and Shift Communications Coordinators will be completed by December 1, 1981. The remainder of the required training will be completed by February 15, 1982. 4. Identify techniques which can compensate for uncertainty associated with plume trajectories in the BVPS environs and incorporate them into the dose calculation methodology. Additionally, training in this methodology shall be completed for all shift personnel who would be responsible for making dose assessments. This will be accomplished by December 1,1981. 5. Finalize plans for and make operational your interim Emergency Operations Facility, including communications equipment, decisional aids and reference materials. These plans should also include provisions to reduce the potential for congestion in the Control Room / Emergency Coordination Center area by performing non plant mitigation / operation functions in the Teci nical Support Center and EOF. The interim Emergency Operation Facility wHi be made functional no.iater than December 1, 1981 with the exception of the dase assessment facili',ies which will be operational no later than December 31, 1981. Revise the notification procedures to 'rovide for prompt 6. notification of your offshift emergency response organization and offsite agencies. Individuals on each shift shall be tr2.ined in the use of the revised procedures and any equipment changes. These revisions and actions will be implement!d no later than December 31, 1981.
Duquesne Light Co. 3 NOV 2 N In addition to the above actions, please inform this office in writing, when the aforementioried actions have been completed. If our understanding of your planned actions described above is not in accordance with your actual plans and actions being implemented, please contact this office by i.elephone (215) 337-5000, within 24 hours. Your cooperation with us on this matter is appreciated. Sincerely, Original Signed B7.1 Ronald C. Haynes Director cc F. Bissert, Manager, Nuclear Support Services R. Washabaugh, QA Manager H. P. Williams, Station Superintendent W. S. Lacey, Chief Engineer R. Martin, Nuclear Er.gineer K. Grada, Superintendent of Licensing J. Sieber, Manager, Nuclear Safety and Licensing T. D. Jones, Manager, Nuclear Operations R. M. Mafrice, Nuclear Engineer N. R. Tonet, Manager, Nuclear Engineering Public Document Room (PDR) Local Public Document Room (LPDR) Nuclear Safety Information center (NSIC) NRC Resident inspector Commonwealth of Pennsylvania bec w/ enc 1: Region I Docket Room (with concurrences)}}