ML20032C655

From kanterella
Jump to navigation Jump to search
Forwards Startup Test Rept for Facility
ML20032C655
Person / Time
Site: Farley 
Issue date: 11/06/1981
From: Clayton F
ALABAMA POWER CO.
To: Varga S
Office of Nuclear Reactor Regulation
Shared Package
ML20032C656 List:
References
NUDOCS 8111100697
Download: ML20032C655 (1)


Text

_ _.

Malling Address Alabama Power Company 600 North 18th Street Post Offace 0o:22641 Sirmingham. Alabama 35291 Telephone 205 783-6081 F. L Clayton, Jr.

S;;rdgC;'g"'

Nabamalbwer i

t?e swnern extre sysnn November 6, 1981 Docket No. 50-364 02 Director of Nuclear Reactor Regulation h\\

E NOVO O 1987%

U. S. Nuclear Regulatory Connission h u,, N l f roes Ny Washington, D.C.

20555 C

Attention: Mr. S. A. Varga f/

p Gentlemen:

tu Joseph M. Farley Nuclear Plant - Unit 2 Startup Report As connitted in my letter of October 28, 1981 and in accordance with paragraph 6.9.1.3 of the Technical Specifications for Farley Nuclear Plant Unit 2 (NFP-8), submitted herewith is the Unit 2 Startup i

Report.

If you have any questions, please advise.

Yours very tru

' /f A

7 -

F. L. Clayton, Jr.

)

FLCJr/KWM:nac xc: Mr. R. A. Thomas (w/ Attachment)

Mr. G. F. Trowbridge Mr. J. P. O'Reilly (w/ Attachment)

Mr. E. A. Reeves Mr. W. H. Bradford i

9 A NY I

81A1100697 811106 PDR ADOCK 05000364 P

PDR

_