Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20247K232 + (01:09:26, 2 December 2024)
- ML20247K229 + (01:09:27, 2 December 2024)
- 05000302/LER-1989-008-01, Forwards LER 89-008-01 & Proposed Draft FSAR Change. Reanalysis in LER Initiated to Evaluate Consequences of Operation W/Steam Drain Trap Isolation Valves Open for All Events.Revised FSAR Pages Will Be Incorporated in Rev 12 + (01:09:30, 2 December 2024)
- ML20247K223 + (01:09:31, 2 December 2024)
- IR 05000263/1998006 + (01:09:32, 2 December 2024)
- ML20247K222 + (01:09:32, 2 December 2024)
- 05000333/LER-1989-006-01, :on 890419,standby Liquid Control Sys Declared Inoperable When Pump Discharge Accumulator Nitrogen Precharge Was 0 Psig.Caused by Slow Leak in Charging Connector Spring Loaded Valve.Bladder Repaired + (01:09:34, 2 December 2024)
- 05000440/LER-1989-007, :on 890227,source-range Monitor Signal/Noise Ratio Not Verified Prior to Entering Operation Condition 5. Caused by Personnel Error.Personnel Counseled & Note Added to Tech Spec Rounds to Clarify Applicability Requirements + (01:09:37, 2 December 2024)
- ML20247K213 + (01:09:38, 2 December 2024)
- ML20247K214 + (01:09:38, 2 December 2024)
- 05000440/LER-1989-006, :on 890224,primary Containment Leakage Rate Through First MSIV Before Seat Drain Valves Exceeded Tech Spec Limit.Caused by Misalignment of Valve Disc.Seat Polishing & Machining of Poppet Seals Performed + (01:09:40, 2 December 2024)
- A98035, Monthly Operating Repts for Apr 1998 for Zion Station,Units 1 & 2 + (01:09:41, 2 December 2024)
- ML20247K208 + (01:09:42, 2 December 2024)
- ML20247K207 + (01:09:43, 2 December 2024)
- ML20247K204 + (01:09:45, 2 December 2024)
- ML20247K201 + (01:09:46, 2 December 2024)
- ML20247K202 + (01:09:46, 2 December 2024)
- ML20247K200 + (01:09:47, 2 December 2024)
- ML20247K199 + (01:09:47, 2 December 2024)
- ML20247K198 + (01:09:48, 2 December 2024)
- ML20247K195 + (01:09:49, 2 December 2024)
- ML20247K194 + (01:09:50, 2 December 2024)
- ML20247K192 + (01:09:51, 2 December 2024)
- 05000341/LER-1989-013, :on 890624,reactor Bldg HVAC Isolated & Standby Gas Treatment Sys Automatically Started.Caused by Personnel Error.Potential Design Change Written to Improve Testability at Panel + (01:09:53, 2 December 2024)
- ML20247K187 + (01:09:54, 2 December 2024)
- ML20247K188 + (01:09:54, 2 December 2024)
- ML20247K182 + (01:09:56, 2 December 2024)
- ML20247K185 + (01:09:56, 2 December 2024)
- ML20247K181 + (01:09:57, 2 December 2024)
- 05000259/LER-1998-001-03, :on 980414,standby Gas Treatment Sys HEPA Filter Testing Was Not in Compliance W/Ansi Std Requirements.Caused by Lack of Understanding of DOP Testing. Filter Testing Training Will Be Provided + (01:09:59, 2 December 2024)
- 05000339/LER-1989-004-02, :on 890502,unexpected Automatic Reactor Trip Signal Generated During Performance of ICP-FW-2-F-2486. Caused by Procedure Inadequacy.Instrument Dept Procedures Will Be Reviewed & Revised + (01:10:01, 2 December 2024)
- 0CAN048902, Forwards Certificate of Insurance for Maelu Policies 5356, TA6178,X88185 & XTA6047 + (01:10:02, 2 December 2024)
- ML20247K177 + (01:10:03, 2 December 2024)
- ML20247K176 + (01:10:03, 2 December 2024)
- ML20247K168 + (01:10:04, 2 December 2024)
- ML20247K171 + (01:10:04, 2 December 2024)
- ML20247K164 + (01:10:05, 2 December 2024)
- 05000341/LER-1989-012, :on 890603,various Div I Isolations/Actuations Experienced During one-time Surveillance Procedure to Allow Installation of Star Lugs.Caused by Inadequate Technical Review of Temporary Procedure Change + (01:10:07, 2 December 2024)
- PY-CEI-NRR-0990, Forwards LERs 89-005,89-006 & 89-007 for Perry Unit 1 + (01:10:08, 2 December 2024)
- NG-98-0893, Forwards Rev 0 to Cycle 16 COLR, IAW Requirements of TS Section 6.11.2.d.Prepared Rept Using NRC-approved Methods & Confirms That All Applicable Limits of SAR Have Been Met + (01:10:08, 2 December 2024)
- ML20247K157 + (01:10:11, 2 December 2024)
- ML20247K156 + (01:10:12, 2 December 2024)
- ML20247K154 + (01:10:13, 2 December 2024)
- SNRC-1596, Requests Exemption from 10CFR50.54(w) Re Onsite Property Damage Insurance Requirements + (01:10:14, 2 December 2024)
- 05000482/LER-1989-011, :on 890623,both Class 1E Air Conditioning Units SGK05A & SGK05B Were Inoperable.Caused by Loose Wire Disconnected from Lug on pump-down Switch.Wire Recrimped & Units Returned to Svc.Personnel Reinstructed + (01:10:16, 2 December 2024)
- 0CAN059805, Monthly Operating Repts for Apr 1998 for Ano,Units 1 & 2 + (01:10:17, 2 December 2024)
- ML20247K151 + (01:10:17, 2 December 2024)
- ML20247K144 + (01:10:20, 2 December 2024)
- ML20247K143 + (01:10:20, 2 December 2024)
- IR 05000369/1989029 + (01:10:22, 2 December 2024)
- ML20247K139 + (01:10:22, 2 December 2024)
- ML20247K138 + (01:10:23, 2 December 2024)