ML20247K187
| ML20247K187 | |
| Person / Time | |
|---|---|
| Site: | Hatch |
| Issue date: | 07/25/1986 |
| From: | Beckham J GEORGIA POWER CO. |
| To: | Grace J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| References | |
| IEB-86-002, IEB-86-2, SL-1034C, NUDOCS 8904050186 | |
| Download: ML20247K187 (2) | |
Text
'
MAR 31 '69 06:26 052 SOH0PCO-HATCH P.02 X 76-T/1 - Hll6, - H4 00
&f(Ce
?ill:MM."'
C'.L/3's#'so "QsllLs 3
[
A'a~a Gon'c4 D %
Georgia Power s, r.... n.e. s,.
(*c' $'"ciOl"l "" "'
s1,.1034e 0635C July 25,1986 Office of Inspection and Enforcement RII: JNG Region II - Suite 2900 60,321/60-366 101 Marietta Street, NW IE Bulletin
/ tlanta, Georgia 30323 86 02 ATTENTION: Dr. J. Nelson Grace Gentlemen:
Georgia Power Company has reviewed IE Bulletin 86-02 for applicability Plant E.
1.
Hatch Units 1 and 2.
The bulletin reported erratic to performance of differential pressure switches provided by SOR.
Incorporated.
The switches were installed in nuclear facilities and were used to sense reactor coolant levels and to activate the emergency core cooling systems.
The bulletin required that all licensees determine whether SOR Model 102 or 103 differential pressure switches are installed (or are planned for installation) as electrict1 ocufpment important to safety, as defined in 10 CFR 60.49(b) or whether dif forential pressure switches are installed in systems that are subject to limiting conditions for operation, as defined in the Technical Specifications.
Georgia Power Company has determined that the SOR Models 102 and 103 differential pressure switches addressed in Bulletin 86-02 ere not utilized in either of the Plant Hatch units as electrical equiment important to safety, as defined in 10 CFR 50.49(b). or in systems ttat are subject to limiting conditions for operation,-
as defined in the Technical Specifications.
Therefore, the followup actions outlined in the referenced bulletin are not applicable to Plant Hatch.
This response completes our actions relative to 15 Bulletin 86-02.
p$h40 1186 860725 Q
OCK 05000321 t
(
PDC i
,,,, a z r m mv>. e am w v.m
,,v GeorglaPowerA
'l U. S. Nuclear Regulatory Comission Office of Inspection and Enforcement Region II - Suite 2900 July 25,1986 Page Two Mr. J. T. Beckham, Jr. states that he is Vice President o' Georgia Power Company and is authorized to execute this oath on behalf c:
Georgia Power Company, and that to the best of his knowledge and belief, the facts set forth in this letter are true.
GEORGIA POWER COMPANY N^
k' N 0 By:54-cf A 1 -
p0. T. Becknam, Jr.F Sworn o and subscribed before me this 25th day of July 1986.
Y eLb
/
Notary Public IE8n DN'if*fM LGB/lc i
c GeorfTa Power Company U. S. NJclear Regulatory Comission Mr. s. P. O'Re1 ly Mr. H. C. Nix, Jr.
5entor rtestdent Inspector
~
GO-NORMS
- 0fficet
- L1c. En Le
- Plant G.M.;
!......... !....... gr. ; 5t c. Mg r. ;... !.gg,. !...... gal..
! Surname: !Byrnes Domby !
Nix Signature..
b.,....................
IDate
!07#5/86!07/d86!07/ /86 ! 07/ /86 !
700778
- _ _ - _ - _ -. _ - - - - - "