_ _ _ _ _ _

Yp at%,% UNITED STATES

",, E" g 'j NUCLE AR REGULATORY COMMISSION

y WA$HINGTON, D. C. 205$5 L 1, .

/

CONNECTICUT YANKEE ATOMIC POWER COMPANY DOCKET NO. 50-213 HADDAM NECK PLANT AMENDMENT TO FACILITY OPERATING LICENSE Amendment No.123

< License No. DPR-61

1. The Nuclear Regulatory Comission (the Commission) has found that:

A. The application for amendment by Connecticut Yankee Atomic Power (thelicensee), dated June 29, 1989 complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations set forth in 10 CFR Chapter I; B. The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Comission; C. There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D. The issuance of this amendment will not be inimical to the comon defense and security or to the health and safety of the public; and E. The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.

fh9210111 89091; p ADOCK 05000213 FDC

m. u_-_-_ ____m__._m

l' l

l l l l

l- <

1 2. Accordingly, the license is amended by changes to the Technical l Specifications as indicated in the attachment to this license amendment, and paragraph 2.C.(2) of Facility Operating License No. DPR-61 is hereby amended to read as follows:

(2) Technical Specifications The Technical' Specifications contained in Appendix A, as revised through Amendment No.123. are hereby incorporated in the license.

The licensee shall operate.the facility in accordance with the Technical Specifications.

3. This license amendment is effective as of the date of issuance, to be implemented within 30 days of issuance.

l FOR THE NUCLEAR REGULATORY COMMISSION okt'E.Stolz,Directp Pr@'ect Directorate ]r4 Hision of Reactor Projects - I/II Office of Nuclear Reactor Regulation

Attachment:

Changes to the Technical Specifications Date of Issuance: September 11, 1989 1

l l

7:.

p..-

l '.

~

ATTACHMENT TO LICENSE AMENDMENT NO.123 FACILITY OPERATING LICE.NSE NO. DPR-61 DOCKET NO. 50-213_

i- Replace the following page of the Appendix "A" Technical Specifications with I. the enclosed page. The revised page is identified by amendment number and contain vertical lines indicating the areas of change.

! Remove Insert 4-21d '

4-21d l

I i

i l

r .

v g) Unserviceable describes the condition of a tube if it leaks or contains a defect large enough to affect its structural integrity in the event of an Operating Basis earthquake, a loss-of-coolant accident, or a steam line or feedwater line break as specified in Specification 4.10.1.C.3.

h) Tube Insoection means an inspection of the steam generator tube from the point of entry (hot leg side) completely '

around the U bend to the top support of the cold leg; or an inspection from the point of entry (Hot Leg or Cold Leg Side) completely around the U-bend to the opposite tube end.

2. The Steam Generator may be returned to service after completing the corresponding actions (plug or sleeve
  • all tubes exceeding the plugging limit and plug all defective sleeves) required by Table 4.10.1-2.

E. Following each inservice inspection of steam generator tubes, the number of tubes plugged or sleeved in each steam generator shall be reported in accordance with specification 6.9.

  • Tube sleeving shall be performed in accordance with the Connecticut Yankee Steam Generator Sleeving Report, Revision 1, transmitted by letter dated January 7, 1986.

4-21d AmendmentNo.[,7/I,7,f,123 /

v

[o bro ,%,

UNITED STATES

  1. j i' w.

, NUCLEAR REGULATORY COMMISSION y wassmcT oN, 0. C. 20555

\..w.../

NORTHEAST NUCLEAR ENERGY COMPANY, ET AL.

DOCKET NO.'50-423 MILLSTONE NUCLEAR POWER STATION, UNIT NO. 3 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No.41 License No. NPF-49

1. The Nuclear Regulatory Comission (the Comission) has found that:

A. The application for smendment by Northeast Nuclear Energy Company, et al. (the licensee) dated June 29, 1989 complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Comission's rules and regulations set forth in 10 CFF.

Chapter I; B. The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Comission; C. There is rease ?ble assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be ccnducted in compliance with the Comission's regulations; D. The issuance of this amendment will not be inimical to the comon defense and security or to the health and safety of the public; and 1

E. The issuance of this amendment is in accordance with 10 CFR Part 51 of the Comission's regulations and all applicable requirements have l been satisfied.

-2 1

2. Accordingly, the license is-amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.C.(2) of Facility Operating License No. NPF-49 is hereby amended to read as follows:

(2) Technical Specifications The Technical Specifications contained in Appendix A, as revised through Amendment No. 41 , and the Environmental Protection Plan contained in Appendix B, both of which are attached hereto are hereby incorporated in the license. The licensee shall operate the facility in accordance with the TecFnical Specifications and the Environmental Protection Plan.

3. This license amendment is effective as of the date of its issuance, to be implemented within 30 days of issuance.

FOR THE NUCLEAR REGULATORY COMMISSION

,s#

/

Je n . Stolz, D rector Pro et Directorate I-4, D1 1sion of Reactor Projects - I/II Office of Nuclear Reactor Regulation

Attachment:

Changes to the Technical Specifications Date of Issuance: September 11, 1989

ATTACHMENT TO LICENSE AMENDPENT NO.41 FACILTIY OPERATINC LICENSE NO. NPF-49 DOCKET NO. 50-423 Replace the following page of the Appendix A Technical Specifications with the enclosed page. The revised page is identified by amendment number and contain vertical lines indicating the areas of change. The corresponding overleaf page is provided to maintain document completeness.

Remove Insert 3/4 4-17 i 3/4 4-17

,- .c -

~

R'EACTOR COOLANT SYSTEM STEAM GENERATOR SURVEILLANCE REQUIREMENTS (Continued) l L

a.4.5.4 Acceptance Criteria

a. As used in this specification:
1) Imperfection means an exception to the dimensions, finish, or contour of a tube from that required by fabrication drawings or specificatima. Eddy-current testing indications below 20% of the nominal tube wall thickness, if detectable, may be considered as imperfections;
2) Degradation means a service-induced cracking, wastage, wear, or general corrosion occurring on either inside or outside of a tube;

,3) Decraded Tube means a tube containing imperfections greater than or equal to 20% of the nominal' wall thickness caused by degradation;

4)  % Deoradatice. means the percentage of the tube wall thickness affected or removed by degradation;
5) Defect means an imperfection of such severity that it exceeds the plugging limit. A tube containing a defect is defective;
6) Pluccino Limit means the imperfection depth at or beyond which the tube shall be removed from service and is equal to 40%

of the nominal tube wall thickness;

7) Unserviceable describes the condition of a tube if it leaks or contains a defect large enough to affect its structural integ-rity in the event of an Operating Basis Earthquake, a loss-of-coolant accident, er a steam line or feedwater line break as specified in Specification 4.4.5.3c., above;
8) Tube Insoection means an inspection of the steam generator tube from the point of entry (hot leg side) completely around the U-bend to the top support of the cold leg; or an inspection from the point of entry (Hot leg or Cold Leg Side) completely around the U-bend to the opposite tube end. .

MILLSTONE - UNIT 3 3/4 4-17 Amendment No. 41 I

1

, ' REACTOR COOLANT SYSTEM' 1

STEAM GENERATOR

.4

5 SURVEILLANCE REQUIREMENTS (Continued) 19)- Yreservice Inspection means an inspection of the fu'11' length of

'each tube in each steam generator performed by eddy current techniques prior to service to establish a baseline condition of the tubing. This inspection shall be performed prior to

initial: POWER OPERATION.using the equipment and techniques expected to be.used during subsequent-insurvice inspections.
b. The steam generator shall; be determined OPERABLE after completingL the corresponding. actions (plug all tubes exceeding the plugging limit'and.all tubes containing through-wall cracks) required by -

Table 4.4-2.

. 4.4.5.5 Reports 7 a. Within 15 days'following the completion of- each inservice inspection of steam generator. tubes, the number of tubes plugged in each steam generator shall.be reported to the Commission in a Special Report pursuant to Specification 6.9.2;

b. The complete results.of the steam generator tube inservice inspection shall be submitted to the Cummission in a Special Report pursuant to Specification 6.9.2 within 12 months following the completion of the inspection. This Special Report shall include:
1) Number and extent of tubes inspected,.

2). Location and percent of walt-thickness penetration for each indicEtion of an inoperfection, and

3) 1dce.tffication nf tubes plugged.
c. Results cf ' steam generator tube inspections which fall iato Category I C-3 nhall be reported in a Special Report to the tonnission pursusnt to Specification 6.9.2 withtr 30 days and prios to resumption of plant nperatien. This report shall provide a description of investi-gatiu 5 ccnducted te determine cause of the tube degesdatiQn and cort ective measures taken to prevent recurrence.

l MILLSTONE - UNIT 3 3/4 4-18