Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20054D280 + (23:38:31, 17 December 2024)
- ML20054D275 + (23:38:33, 17 December 2024)
- ML20054D276 + (23:38:33, 17 December 2024)
- ML20054D274 + (23:38:34, 17 December 2024)
- IR 05000461/1982004 + (23:38:36, 17 December 2024)
- AECM-82-129, Responds to IE Bulletin 80-06, Engineered Safety Feature (ESF) Reset Controls, & 801212 Request for Addl Info. Required Changes for Problem 8 & Addl Items 1 & 2 Implemented.Info Supercedes 820305 Transmittal + (23:38:37, 17 December 2024)
- ML20054D270 + (23:38:39, 17 December 2024)
- ML20054D268 + (23:38:40, 17 December 2024)
- ML20054D266 + (23:38:43, 17 December 2024)
- ML20054D264 + (23:38:45, 17 December 2024)
- IR 05000289/1982002 + (23:38:51, 17 December 2024)
- ML20054D261 + (23:38:55, 17 December 2024)
- ML20054D260 + (23:38:56, 17 December 2024)
- ML20054D257 + (23:38:59, 17 December 2024)
- ML20054D255 + (23:39:03, 17 December 2024)
- ML20054D253 + (23:39:04, 17 December 2024)
- ML20054D252 + (23:39:05, 17 December 2024)
- IR 05000263/1982004 + (23:39:07, 17 December 2024)
- ML20054D249 + (23:39:09, 17 December 2024)
- PNO-III-82-039, on 820414,contract Boilermakers & Millwrights Working on CRD Mechanisms Walked Off Job During Jurisdictional Dispute.Picket Lines Set Up at Const Gate & Union Workers Refused to Cross + (23:39:11, 17 December 2024)
- ML20054D246 + (23:39:12, 17 December 2024)
- ML20054D245 + (23:39:13, 17 December 2024)
- ML20054D244 + (23:39:14, 17 December 2024)
- ML20054D239 + (23:39:36, 17 December 2024)
- ML20054D238 + (23:39:37, 17 December 2024)
- ML20054D236 + (23:39:39, 17 December 2024)
- 05000305/LER-1982-006, Forwards LER 82-006/03L-0 + (23:39:41, 17 December 2024)
- PNO-III-82-042, on 820418,util Began Loading Fuel Into Unit 1 After Receiving Low Power OL on 820417.Fifty Elements Have Now Been Loaded Into Core.Investigation Into Const Improprieties Continues + (23:39:41, 17 December 2024)
- ML20054D232 + (23:39:44, 17 December 2024)
- ML20054D231 + (23:39:45, 17 December 2024)
- ML20054D230 + (23:39:46, 17 December 2024)
- ML20054D229 + (23:39:47, 17 December 2024)
- IR 05000546/1982002 + (23:39:48, 17 December 2024)
- IR 05000483/1982002 + (23:39:50, 17 December 2024)
- ML20054D225 + (23:39:52, 17 December 2024)
- ML20054D223 + (23:39:53, 17 December 2024)
- ML20054D222 + (23:39:54, 17 December 2024)
- ML20054D220 + (23:39:55, 17 December 2024)
- ML20054D218 + (23:39:58, 17 December 2024)
- ML20054D217 + (23:39:59, 17 December 2024)
- PNO-III-82-038A, addl Insp of Steam Generator 1 Determined That Auxiliary Feedwater Ring Head Separated from Nozzle & Brackets Damaged or Missing.Steam Generator 2 Ring Header to Be Inspected 820417-18 + (23:40:01, 17 December 2024)
- PNO-III-82-043, on 820416,therapy Misadministration Resulting in Dose of 12,000 Rads to Patient Uterus During Treatment Period 820409-12 Discovered.Caused by Wrong Activity Source in Applicator.Special Insp Being Conducted + (23:40:03, 17 December 2024)
- ML20054D214 + (23:40:05, 17 December 2024)
- ML20054D213 + (23:40:08, 17 December 2024)
- IR 05000346/1982011 + (23:40:10, 17 December 2024)
- ML20054D211 + (23:40:11, 17 December 2024)
- ML20054D209 + (23:40:15, 17 December 2024)
- ML20054D207 + (23:40:16, 17 December 2024)
- ML20054D203 + (23:40:19, 17 December 2024)
- ML20054D201 + (23:40:19, 17 December 2024)
- ML20054D200 + (23:40:21, 17 December 2024)
- 05000206/LER-1982-011-03, /03L-0:during Power Operations from 811215 Until Plant Entered Mode 5 on 820228,surveillance Tests Table 4.1.4-1(a) & Section 4.1.6.A.1(a) Were Not Performed.Caused by Insufficient Communication & Coordination Between Depts + (23:40:26, 17 December 2024)