Forwards IE Insp Rept 50-373/82-10 on 820213-14,18-19,23-26 & 0302-06 & 10-12 & Notice of Violation
ML20054D236
Person / Time
Site: LaSalle 
Issue date: 03/31/1982
From: Little W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Reed C
COMMONWEALTH EDISON CO.
Shared Package
ML20054D237 List:
References
NUDOCS 8204220467
Download: ML20054D236 (2)


See also: IR 05000373/1982010

Text

,_

___

_

_ _ _ _ _-___________ - _- _ - _______ _

___

_

___

.

p3R 31 N

o

4

(o

O

1

'

.

RECEIVED

Docket No. 50-373(DETP)

-t

APR 221h [8

Commonwealth Edison Company

- gWRintMEAM

A'ITN :

Mr. Cordell Reed

g

g;

Vice President

Post Office Box 767

i

l

Chicago, IL 60690

=

Gentlemen:

This refers to the routine safety inspection conducted by Messrs. I. Jackiw,

R. Lanskbury, and F. Maura of this office on February 13, 14, 18, 19, 23-26,

and March 2-6 and 10-12, 1982, of activities at the LaSalle County Nuclear

Station, Unit 1, authorized by NRC Construction Permit No. CPPR-99 and to

the discussion of our findings with Messrs. B. Stephenson, R. Holyoak, and

R. Bishop at the conclusion of the inspection.

The enclosed copy of our inspection report identifies areas examined during

the inspection. Within these areas, the inspection consisted of a selective

examination of procedures and representative records, observations, and in-

terviews with personnel.

During this inspection, certain of your activities appeared to be in non-

compliance with NRC requirements, as described in the enclosed Appendix.

With respect to Item 3.b, the inspection showed that action had been taken

to correct the identified noncompliance and to prevent recurrence.

Con-

sequently, no reply to this item of noncompliance is required and we have

no further questions regarding this matter at this time.

Regarding the remaining items, a written response is required.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of

this letter, the enclosures, and your response to this letter will be placed

in the NRC's Public Document Room.

If this report contains any information

that you (or your contractors) believe to be exempt from disclosure under

10 CFR 9.5(a)(4), it is necessary that you (a) notify this office by tele-

phone within ten (10) days from the date of this letter of your intention

to file a request for withholding; and (b) submit within twenty-five (25)

days from the date of this letter a written application to this office to

withhold such information.

If your receipt of this letter has been

delayed such that less than seven (7) days are available for your review,

please notify this office promptly so that a new due date may be estab-

lished. Consistent with Section 2.790(b)(1), any such application must

8204220467 820331

/[//

PDR ADOCK 05000373

1

bIf5

0

PUR

-

.

1

Commonwealth Edison Company

2

MAR 311982

be accompanied by an affidavit executed by the owner of the information

which identifies the document or part sought to be withheld, and which

contains a full statement of the reasons which are the bases for the

claim that the information should be withheld from public disclosure.

This section further requires the statement to address with specificity

the considerations listed in 10 CFR 2.790(b)(4). The information sought

to be withheld shall be incorporated as far as possible into a separate

part of the affidavit.

If we do not hear from you in this regard within

the specified periods noted above, a copy of this letter, the enclosures,

and your response to this letter will be placed in the Public Document

Room.

The responses directed by this letter (and the accompanying Notice) are

not subject to the clearance procedures of the Office of Management and

Budget as required by the Paperwork Reduction Act of 1980, PL 96-511.

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

W. S. Little, Chief

Technical Inspection Branch

Enclosures:

1.

Appendix, Notice

of Violation

2.

Inspection Report

No. 50-373/82-10(DETP)

cc w/encls:

Louis 0. De1 George, Director

of Nuclear Licensing

R. Cosaro, Site Construction

Superintendent

T. E. Quaka, Quality

Assurance Supervisor

R. H. Holyoak, Station

Superintendent

B. B. Stephenson, Project Manager

DMB/ Document Control Desk (RIDS)

Resident Inspector, RIII

Mary Jo Murray, Office of

Assistant Attorney General

,

I

RIII

RIII

RIII

RIII

RII

?

Yi G

f

h

n

j

Md ra/so

L'anksbury

iw

Walker

Li t1e

l

3/24/82

!

l

l